Management Of Multiple Projects In Pre-Design And Pre-Construction Phase

Construction Project Management is continuously getting the attention of the experts and day by day the field is getting new dimensions, views and perspectives. This knowledge has increased the competition among construction companies to procure many projects which have to be managed simultaneously...

Full description

Bibliographic Details
Main Authors: C.T, Ramanathan, Sambu Potty, Narayanan
Format: Conference or Workshop Item
Language:English
Published: 2009
Subjects:
Online Access:http://scholars.utp.edu.my/id/eprint/2055/
http://scholars.utp.edu.my/id/eprint/2055/1/ciriac2009_%28Rama%29_final_paper.pdf
_version_ 1848659199459852288
author C.T, Ramanathan
Sambu Potty, Narayanan
author_facet C.T, Ramanathan
Sambu Potty, Narayanan
author_sort C.T, Ramanathan
building UTP Institutional Repository
collection Online Access
description Construction Project Management is continuously getting the attention of the experts and day by day the field is getting new dimensions, views and perspectives. This knowledge has increased the competition among construction companies to procure many projects which have to be managed simultaneously. The lack of knowledge of design professionals to consider the constructability aspect of the design can result in scheduling problems, delays and complicated disputes during the construction phase. The management in pre design and pre construction phase will decide the projects’ fate even before the commencement of construction phase. This study examines the procedures adopted for effective management of multiple projects performed in Design and Build (D&B) platform. The flow chart of different stages of the D&B procedure is presented with output of each stage. The important aspects in the Management of Pre design and pre construction phase are analyzed in the following sequence: a) D&B process and procedures – a practical approach, b) Organizing required components at early design stage and c) Element optimization techniques. The case study of Multiple Bridge projects in Sabah, East Malaysia is presented. Methods of determining Specialist works are also analyzed based on various critical factors influencing the implementation process.
first_indexed 2025-11-13T07:26:38Z
format Conference or Workshop Item
id oai:scholars.utp.edu.my:2055
institution Universiti Teknologi Petronas
institution_category Local University
language English
last_indexed 2025-11-13T07:26:38Z
publishDate 2009
recordtype eprints
repository_type Digital Repository
spelling oai:scholars.utp.edu.my:20552017-01-19T08:25:11Z http://scholars.utp.edu.my/id/eprint/2055/ Management Of Multiple Projects In Pre-Design And Pre-Construction Phase C.T, Ramanathan Sambu Potty, Narayanan TA Engineering (General). Civil engineering (General) Construction Project Management is continuously getting the attention of the experts and day by day the field is getting new dimensions, views and perspectives. This knowledge has increased the competition among construction companies to procure many projects which have to be managed simultaneously. The lack of knowledge of design professionals to consider the constructability aspect of the design can result in scheduling problems, delays and complicated disputes during the construction phase. The management in pre design and pre construction phase will decide the projects’ fate even before the commencement of construction phase. This study examines the procedures adopted for effective management of multiple projects performed in Design and Build (D&B) platform. The flow chart of different stages of the D&B procedure is presented with output of each stage. The important aspects in the Management of Pre design and pre construction phase are analyzed in the following sequence: a) D&B process and procedures – a practical approach, b) Organizing required components at early design stage and c) Element optimization techniques. The case study of Multiple Bridge projects in Sabah, East Malaysia is presented. Methods of determining Specialist works are also analyzed based on various critical factors influencing the implementation process. 2009-11-03 Conference or Workshop Item PeerReviewed application/pdf en http://scholars.utp.edu.my/id/eprint/2055/1/ciriac2009_%28Rama%29_final_paper.pdf C.T, Ramanathan and Sambu Potty, Narayanan (2009) Management Of Multiple Projects In Pre-Design And Pre-Construction Phase. In: 2nd Construction Industry Research Achievement International Conference 2009 (CIRIAC 2009), 3rd November - 5 November 2009, CIDB Convention Centre, Jalan Cheras, Kuala Lumpur.
spellingShingle TA Engineering (General). Civil engineering (General)
C.T, Ramanathan
Sambu Potty, Narayanan
Management Of Multiple Projects In Pre-Design And Pre-Construction Phase
title Management Of Multiple Projects In Pre-Design And Pre-Construction Phase
title_full Management Of Multiple Projects In Pre-Design And Pre-Construction Phase
title_fullStr Management Of Multiple Projects In Pre-Design And Pre-Construction Phase
title_full_unstemmed Management Of Multiple Projects In Pre-Design And Pre-Construction Phase
title_short Management Of Multiple Projects In Pre-Design And Pre-Construction Phase
title_sort management of multiple projects in pre-design and pre-construction phase
topic TA Engineering (General). Civil engineering (General)
url http://scholars.utp.edu.my/id/eprint/2055/
http://scholars.utp.edu.my/id/eprint/2055/1/ciriac2009_%28Rama%29_final_paper.pdf