ELEMENT OPTIMISATION TECHNIQUES TO MANAGE MULTIPLE DB BRIDGE PROJECTS IN EAST MALAYSIA

The construction process and success in management of multiple bridge projects directly relies on the selection and optimization of their elements / components. Many problems will be avoided if the construction knowledge and experience are utilised during the selection of the bridge elements in the...

Full description

Bibliographic Details
Main Authors: C.T, Ramanathan, Sambu Potty, Narayanan, M. Taharin, Radzif
Format: Conference or Workshop Item
Language:English
Published: 2008
Subjects:
Online Access:http://scholars.utp.edu.my/id/eprint/1057/
http://scholars.utp.edu.my/id/eprint/1057/1/Paper_C020_%28Rama%29.pdf
_version_ 1848659070613979136
author C.T, Ramanathan
Sambu Potty, Narayanan
M. Taharin, Radzif
author_facet C.T, Ramanathan
Sambu Potty, Narayanan
M. Taharin, Radzif
author_sort C.T, Ramanathan
building UTP Institutional Repository
collection Online Access
description The construction process and success in management of multiple bridge projects directly relies on the selection and optimization of their elements / components. Many problems will be avoided if the construction knowledge and experience are utilised during the selection of the bridge elements in the Design and Build (DB) process. A systematic selection process is required during design stage to maximise the use of available resources that will be suitable in respective locations. The relevant studies of multiple bridge designs consider and incorporate practical suggestions from the field personals. This case study carried out in East Malaysia with problems of material, labour and equipment availability. Data from multiple design-build bridge projects is obtained and then the average ratio presence of each element in the bridges calculated to show the combinations of same elements in several bridges. The study emphasizes the need of element optimisation techniques in bridges to choose the elements like foundation, piling, Beams, etc. The database of the entire elements in all the bridges are presented and discussed to show the process undertaken during the design. The significance of the approach and the important role of this technique in successful management of multiple bridge constructions is described.
first_indexed 2025-11-13T07:24:35Z
format Conference or Workshop Item
id oai:scholars.utp.edu.my:1057
institution Universiti Teknologi Petronas
institution_category Local University
language English
last_indexed 2025-11-13T07:24:35Z
publishDate 2008
recordtype eprints
repository_type Digital Repository
spelling oai:scholars.utp.edu.my:10572017-01-19T08:26:13Z http://scholars.utp.edu.my/id/eprint/1057/ ELEMENT OPTIMISATION TECHNIQUES TO MANAGE MULTIPLE DB BRIDGE PROJECTS IN EAST MALAYSIA C.T, Ramanathan Sambu Potty, Narayanan M. Taharin, Radzif TA Engineering (General). Civil engineering (General) The construction process and success in management of multiple bridge projects directly relies on the selection and optimization of their elements / components. Many problems will be avoided if the construction knowledge and experience are utilised during the selection of the bridge elements in the Design and Build (DB) process. A systematic selection process is required during design stage to maximise the use of available resources that will be suitable in respective locations. The relevant studies of multiple bridge designs consider and incorporate practical suggestions from the field personals. This case study carried out in East Malaysia with problems of material, labour and equipment availability. Data from multiple design-build bridge projects is obtained and then the average ratio presence of each element in the bridges calculated to show the combinations of same elements in several bridges. The study emphasizes the need of element optimisation techniques in bridges to choose the elements like foundation, piling, Beams, etc. The database of the entire elements in all the bridges are presented and discussed to show the process undertaken during the design. The significance of the approach and the important role of this technique in successful management of multiple bridge constructions is described. 2008-06-16 Conference or Workshop Item PeerReviewed application/pdf en http://scholars.utp.edu.my/id/eprint/1057/1/Paper_C020_%28Rama%29.pdf C.T, Ramanathan and Sambu Potty, Narayanan and M. Taharin, Radzif (2008) ELEMENT OPTIMISATION TECHNIQUES TO MANAGE MULTIPLE DB BRIDGE PROJECTS IN EAST MALAYSIA. In: International Conference on Construction and Building Technology (ICCBT), June 16 - 20, 2008, Kuala Lumpur, Malaysia.
spellingShingle TA Engineering (General). Civil engineering (General)
C.T, Ramanathan
Sambu Potty, Narayanan
M. Taharin, Radzif
ELEMENT OPTIMISATION TECHNIQUES TO MANAGE MULTIPLE DB BRIDGE PROJECTS IN EAST MALAYSIA
title ELEMENT OPTIMISATION TECHNIQUES TO MANAGE MULTIPLE DB BRIDGE PROJECTS IN EAST MALAYSIA
title_full ELEMENT OPTIMISATION TECHNIQUES TO MANAGE MULTIPLE DB BRIDGE PROJECTS IN EAST MALAYSIA
title_fullStr ELEMENT OPTIMISATION TECHNIQUES TO MANAGE MULTIPLE DB BRIDGE PROJECTS IN EAST MALAYSIA
title_full_unstemmed ELEMENT OPTIMISATION TECHNIQUES TO MANAGE MULTIPLE DB BRIDGE PROJECTS IN EAST MALAYSIA
title_short ELEMENT OPTIMISATION TECHNIQUES TO MANAGE MULTIPLE DB BRIDGE PROJECTS IN EAST MALAYSIA
title_sort element optimisation techniques to manage multiple db bridge projects in east malaysia
topic TA Engineering (General). Civil engineering (General)
url http://scholars.utp.edu.my/id/eprint/1057/
http://scholars.utp.edu.my/id/eprint/1057/1/Paper_C020_%28Rama%29.pdf