Multiple Infrastructure D&B Project Management in Rural Areas in Malaysia

Selected infrastructure projects are being implemented by Design and Build procurement system in Sabah (East Malaysia). In these development projects, 45 Bridges in bridge replacement projects together with two Road projects are being executed simultaneously by the author’s Design and Build firm. Th...

Full description

Bibliographic Details
Main Authors: C.T, Ramanathan, Sambu Potty, Narayanan, M. Taharin, Radzif
Format: Conference or Workshop Item
Language:English
Published: 2007
Subjects:
Online Access:http://scholars.utp.edu.my/id/eprint/1034/
http://scholars.utp.edu.my/id/eprint/1034/1/II-5.pdf
_version_ 1848659065864978432
author C.T, Ramanathan
Sambu Potty, Narayanan
M. Taharin, Radzif
author_facet C.T, Ramanathan
Sambu Potty, Narayanan
M. Taharin, Radzif
author_sort C.T, Ramanathan
building UTP Institutional Repository
collection Online Access
description Selected infrastructure projects are being implemented by Design and Build procurement system in Sabah (East Malaysia). In these development projects, 45 Bridges in bridge replacement projects together with two Road projects are being executed simultaneously by the author’s Design and Build firm. The former were awarded in 5 packages in the first phase of Bridge replacement project for PWD. The latter are constructed for Ministry of Rural development. The company manages such projects by using established systems for design, contract, contract administration, construction execution and supervision. Engineers from qualified engineering bodies are selected and appointed for In-house design team / supervision team. Team - discussion and inputs in selecting critical bridge components including (i) Methods of pile foundation, (2) Selection of suitable beam technologies, (3) No. of spans, etc are explained. Majority of the construction works are executed directly by main contractor with appointed specialist contractors for piling works and beam production. Subcontractors for execution of selective works were decided by the Management by contracting and bidding. Aspects of specialist works, diversion works, temporary works, construction program, and management, project cost estimation, tendering and final close out are discussed. This paper gives solutions for the complications in the management and recommendations for improvement in management of multiple design and build project.
first_indexed 2025-11-13T07:24:30Z
format Conference or Workshop Item
id oai:scholars.utp.edu.my:1034
institution Universiti Teknologi Petronas
institution_category Local University
language English
last_indexed 2025-11-13T07:24:30Z
publishDate 2007
recordtype eprints
repository_type Digital Repository
spelling oai:scholars.utp.edu.my:10342017-01-19T08:26:52Z http://scholars.utp.edu.my/id/eprint/1034/ Multiple Infrastructure D&B Project Management in Rural Areas in Malaysia C.T, Ramanathan Sambu Potty, Narayanan M. Taharin, Radzif TA Engineering (General). Civil engineering (General) Selected infrastructure projects are being implemented by Design and Build procurement system in Sabah (East Malaysia). In these development projects, 45 Bridges in bridge replacement projects together with two Road projects are being executed simultaneously by the author’s Design and Build firm. The former were awarded in 5 packages in the first phase of Bridge replacement project for PWD. The latter are constructed for Ministry of Rural development. The company manages such projects by using established systems for design, contract, contract administration, construction execution and supervision. Engineers from qualified engineering bodies are selected and appointed for In-house design team / supervision team. Team - discussion and inputs in selecting critical bridge components including (i) Methods of pile foundation, (2) Selection of suitable beam technologies, (3) No. of spans, etc are explained. Majority of the construction works are executed directly by main contractor with appointed specialist contractors for piling works and beam production. Subcontractors for execution of selective works were decided by the Management by contracting and bidding. Aspects of specialist works, diversion works, temporary works, construction program, and management, project cost estimation, tendering and final close out are discussed. This paper gives solutions for the complications in the management and recommendations for improvement in management of multiple design and build project. 2007-11-12 Conference or Workshop Item PeerReviewed application/pdf en http://scholars.utp.edu.my/id/eprint/1034/1/II-5.pdf C.T, Ramanathan and Sambu Potty, Narayanan and M. Taharin, Radzif (2007) Multiple Infrastructure D&B Project Management in Rural Areas in Malaysia. In: World Congress on Urban Infrastructure in Developing Countries, 12-14 November 2007, New Delhi India.
spellingShingle TA Engineering (General). Civil engineering (General)
C.T, Ramanathan
Sambu Potty, Narayanan
M. Taharin, Radzif
Multiple Infrastructure D&B Project Management in Rural Areas in Malaysia
title Multiple Infrastructure D&B Project Management in Rural Areas in Malaysia
title_full Multiple Infrastructure D&B Project Management in Rural Areas in Malaysia
title_fullStr Multiple Infrastructure D&B Project Management in Rural Areas in Malaysia
title_full_unstemmed Multiple Infrastructure D&B Project Management in Rural Areas in Malaysia
title_short Multiple Infrastructure D&B Project Management in Rural Areas in Malaysia
title_sort multiple infrastructure d&b project management in rural areas in malaysia
topic TA Engineering (General). Civil engineering (General)
url http://scholars.utp.edu.my/id/eprint/1034/
http://scholars.utp.edu.my/id/eprint/1034/1/II-5.pdf