Project cost prediction model using principal component regression for public building projects in Nigeria
Major problem in Nigeria construction industry is that building contracts are completed at sums much higher than estimated cost, hence the need to develop predictive cost model that capture factors affecting project cost using principal components regression, through set objectives: to identify f...
| Main Authors: | B.O. Ganiyu, I.K. Zubairu |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Penerbit UKM
2010
|
| Online Access: | http://journalarticle.ukm.my/2515/ http://journalarticle.ukm.my/2515/1/paper01.pdf |
Similar Items
Cost forecasting model for building projects
by: Khalid, Abd. Ghani
Published: (2008)
by: Khalid, Abd. Ghani
Published: (2008)
Time and cost performance of design-build projects
by: Chen, Q., et al.
Published: (2016)
by: Chen, Q., et al.
Published: (2016)
Unit cost modelling of public building project in Kepulauan Riau- Indonesia / Indrastuti
by: Indrastuti, -
Published: (2014)
by: Indrastuti, -
Published: (2014)
Precise Fingerprint Enrolment through Projection Incorporated Subspace Based on Principal Component Analysis (PCA)
by: Islam, Md. Rajibul, et al.
Published: (2007)
by: Islam, Md. Rajibul, et al.
Published: (2007)
Improved nu-support vector regression algorithm based on principal component analysis
by: Abdullah Mohammed, Rashid, et al.
Published: (2023)
by: Abdullah Mohammed, Rashid, et al.
Published: (2023)
A comparative analysis of tender sums and final costs of public construction and supply projects in Nigeria
by: Olatunji, Oluwole
Published: (2008)
by: Olatunji, Oluwole
Published: (2008)
An exploration of cost overrun in building construction projects
by: Tan, Chin Keng, et al.
Published: (2018)
by: Tan, Chin Keng, et al.
Published: (2018)
Estimiating Project Cost Contingency - Beyong Guesswork and Towards Regression Analysis
by: Baccarini, David
Published: (2008)
by: Baccarini, David
Published: (2008)
Influence Of Project Plans On The Outcome Of Construction Projects
Procured By Design-build (Db) In Nigeria
by: Idoro, Godwin Iroroakpo
Published: (2012)
by: Idoro, Godwin Iroroakpo
Published: (2012)
Significant Factors Causing Cost Overruns In
Telecommunication Projects In Nigeria
by: Ameh, Oko John, et al.
Published: (2010)
by: Ameh, Oko John, et al.
Published: (2010)
Appraising the criteria for contractors’ prequalification on selected public tertiary educational building projects in Southwestern Nigeria
by: Adedokun, Olufisayo Adewumi
Published: (2020)
by: Adedokun, Olufisayo Adewumi
Published: (2020)
Assessment of crime prevention mechanisms in public buildings in Akwa Ibom State Of Nigeria
by: Ebong, S.O., et al.
Published: (2017)
by: Ebong, S.O., et al.
Published: (2017)
An Evaluation of a Leadership Portfolio Project for Principals.
by: Dixon, Kathryn, et al.
Published: (2003)
by: Dixon, Kathryn, et al.
Published: (2003)
Evaluation of factors affecting professional services in
building projects in Nigeria
by: Aluko, Ralph Olusola, et al.
Published: (2018)
by: Aluko, Ralph Olusola, et al.
Published: (2018)
Improving selection practices of subcontractors on building construction project in Nigeria
by: Muhammad, Jibril Adamu
Published: (2016)
by: Muhammad, Jibril Adamu
Published: (2016)
Cost performance for building construction projects in Klang Valley
by: A.S. Ali,, et al.
Published: (2010)
by: A.S. Ali,, et al.
Published: (2010)
Factors influencing workplace accident costs of building projects
by: Feng, Y., et al.
Published: (2015)
by: Feng, Y., et al.
Published: (2015)
Time-cost relationships in Australian building construction projects
by: Love, Peter, et al.
Published: (2005)
by: Love, Peter, et al.
Published: (2005)
Modelling of cost of mechanical & electrical services
between residential & commercial building projects
using selected building form descriptors : A case study
of selected building projects in Abuja and Niger State,Nigeria
by: Shittu .A.A,, et al.
Published: (2011)
by: Shittu .A.A,, et al.
Published: (2011)
Factors for containing failure and abandonment of public
sector construction projects in Nigeria
by: Amade, B., et al.
Published: (2015)
by: Amade, B., et al.
Published: (2015)
Factors influencing reworks occurrence in construction: a study of selected building projects in Nigeria
by: L.O. Oyewobi,, et al.
Published: (2010)
by: L.O. Oyewobi,, et al.
Published: (2010)
Identification of cost data input in life cycle cost (LCC) for building projects
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
Investigating Project Cost Management For High-Rise Residential Buildings
by: Ling, Chee Soon
Published: (2021)
by: Ling, Chee Soon
Published: (2021)
Comparison of machine learning classifiers for dimensionally reduced fMRI data using random projection and principal component analysis
by: Mohd Suhaimi, Nur Farahana, et al.
Published: (2019)
by: Mohd Suhaimi, Nur Farahana, et al.
Published: (2019)
Euler principal component analysis
by: Liwicki, Stephan, et al.
Published: (2013)
by: Liwicki, Stephan, et al.
Published: (2013)
Cost comparison between built-in security components
and some physical characteristics of buildings in
Nigeria: Case studies of residential, commercial and
institutional buildings in Abuja and Minna
by: Anifowose .O.M,
Published: (2011)
by: Anifowose .O.M,
Published: (2011)
The Impact of task and technology characteristics on cost estimation performance in construction projects: A regression analysis
by: Mohammad Waffy, Fazil, et al.
Published: (2023)
by: Mohammad Waffy, Fazil, et al.
Published: (2023)
Reviewing and identifying the green criteria in relation to the building cost: project management
by: Naamandadin, Nurul Akmam, et al.
Published: (2019)
by: Naamandadin, Nurul Akmam, et al.
Published: (2019)
Factors influencing the construction cost of Industrialised Building System (IBS) projects
by: Ahmad Bari, Nor Azmi, et al.
Published: (2012)
by: Ahmad Bari, Nor Azmi, et al.
Published: (2012)
Stakeholders’ perception on critical cost variation factors in Malaysian building projects
by: Sohu, Samiullah, et al.
Published: (2018)
by: Sohu, Samiullah, et al.
Published: (2018)
Source Apportionment and Quality Assessment of Surface Water Using Principal Component Analysis and Multiple Linear Regression statistics
by: Nasly, Mohamed Ali, et al.
Published: (2013)
by: Nasly, Mohamed Ali, et al.
Published: (2013)
Principal components analysis for Hindi digits recognition
by: El-Bashir, Mohammad Said Mansur, et al.
Published: (2008)
by: El-Bashir, Mohammad Said Mansur, et al.
Published: (2008)
Cost profiling of water infrastructure projects
by: Love, Peter, et al.
Published: (2018)
by: Love, Peter, et al.
Published: (2018)
Success factors of design-build public sector projects in Malaysia
by: Lee, Z. P., et al.
Published: (2020)
by: Lee, Z. P., et al.
Published: (2020)
Impact of due process policy on construction projects
delivery in Nigeria
by: Ameh, O.J., et al.
Published: (2013)
by: Ameh, O.J., et al.
Published: (2013)
Cost performance of public infrastructure projects: the nemesis and nirvana of change-orders
by: Love, Peter, et al.
Published: (2017)
by: Love, Peter, et al.
Published: (2017)
How public owners communicate the sustainability requirements of green design-build projects
by: Xia, B., et al.
Published: (2014)
by: Xia, B., et al.
Published: (2014)
The Effects of Project Triple Constraint on Malaysia Building Projects
by: Hassan, Ahmed Khalif, et al.
Published: (2019)
by: Hassan, Ahmed Khalif, et al.
Published: (2019)
Determination of slip melting point in palm oil blends by partial least squares and principal component regression modeling of FTIR spectroscopic data
by: Setiowaty, G., et al.
Published: (2002)
by: Setiowaty, G., et al.
Published: (2002)
Mitigation measures for critical factors causing cost overrun in Malaysian building projects
by: Ullah, Kaleem
Published: (2018)
by: Ullah, Kaleem
Published: (2018)
Similar Items
-
Cost forecasting model for building projects
by: Khalid, Abd. Ghani
Published: (2008) -
Time and cost performance of design-build projects
by: Chen, Q., et al.
Published: (2016) -
Unit cost modelling of public building project in Kepulauan Riau- Indonesia / Indrastuti
by: Indrastuti, -
Published: (2014) -
Precise Fingerprint Enrolment through Projection Incorporated Subspace Based on Principal Component Analysis (PCA)
by: Islam, Md. Rajibul, et al.
Published: (2007) -
Improved nu-support vector regression algorithm based on principal component analysis
by: Abdullah Mohammed, Rashid, et al.
Published: (2023)