Current 3R practices on construction waste minimization in construction site
The rise of the construction industry nowadays has a lot to do with the production of industrial waste. The needs of the construction industry whether for developing countries or developed countries is something that cannot be avoided. The main objectives were to find the main causes of constructi...
| Main Authors: | , , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Penerbit Universiti Kebangsaan Malaysia
2024
|
| Online Access: | http://journalarticle.ukm.my/25147/ http://journalarticle.ukm.my/25147/1/27.pdf |
| _version_ | 1848816281396969472 |
|---|---|
| author | Mohamad Zain Hashim, Idris Osman, Siti Hafizan Hassan, Muriatul Khusmah Musa, |
| author_facet | Mohamad Zain Hashim, Idris Osman, Siti Hafizan Hassan, Muriatul Khusmah Musa, |
| author_sort | Mohamad Zain Hashim, |
| building | UKM Institutional Repository |
| collection | Online Access |
| description | The rise of the construction industry nowadays has a lot to do with the production of industrial waste. The needs of
the construction industry whether for developing countries or developed countries is something that cannot be avoided.
The main objectives were to find the main causes of construction waste generation, assess the level of awareness
of 3R concepts and to evaluate the current approach used at the construction site in reducing construction waste.
The study involves companies involved in the construction industry, namely architects, consultants and contractors.
The research method used is a questionnaire to the construction industry. Results show that most respondents are aware of the benefits of 3R practices but most of them also do not practice the 3R due to lack of knowledge. The
finding of this research is the construction waste can be reducing after practising the 3R. |
| first_indexed | 2025-11-15T01:03:23Z |
| format | Article |
| id | oai:generic.eprints.org:25147 |
| institution | Universiti Kebangasaan Malaysia |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-15T01:03:23Z |
| publishDate | 2024 |
| publisher | Penerbit Universiti Kebangsaan Malaysia |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | oai:generic.eprints.org:251472025-05-26T08:47:04Z http://journalarticle.ukm.my/25147/ Current 3R practices on construction waste minimization in construction site Mohamad Zain Hashim, Idris Osman, Siti Hafizan Hassan, Muriatul Khusmah Musa, The rise of the construction industry nowadays has a lot to do with the production of industrial waste. The needs of the construction industry whether for developing countries or developed countries is something that cannot be avoided. The main objectives were to find the main causes of construction waste generation, assess the level of awareness of 3R concepts and to evaluate the current approach used at the construction site in reducing construction waste. The study involves companies involved in the construction industry, namely architects, consultants and contractors. The research method used is a questionnaire to the construction industry. Results show that most respondents are aware of the benefits of 3R practices but most of them also do not practice the 3R due to lack of knowledge. The finding of this research is the construction waste can be reducing after practising the 3R. Penerbit Universiti Kebangsaan Malaysia 2024 Article PeerReviewed application/pdf en http://journalarticle.ukm.my/25147/1/27.pdf Mohamad Zain Hashim, and Idris Osman, and Siti Hafizan Hassan, and Muriatul Khusmah Musa, (2024) Current 3R practices on construction waste minimization in construction site. Jurnal Kejuruteraan, 36 (1). pp. 297-306. ISSN 0128-0198 https://www.ukm.my/jkukm/volume-3601-2024 |
| spellingShingle | Mohamad Zain Hashim, Idris Osman, Siti Hafizan Hassan, Muriatul Khusmah Musa, Current 3R practices on construction waste minimization in construction site |
| title | Current 3R practices on construction waste minimization in construction site |
| title_full | Current 3R practices on construction waste minimization in construction site |
| title_fullStr | Current 3R practices on construction waste minimization in construction site |
| title_full_unstemmed | Current 3R practices on construction waste minimization in construction site |
| title_short | Current 3R practices on construction waste minimization in construction site |
| title_sort | current 3r practices on construction waste minimization in construction site |
| url | http://journalarticle.ukm.my/25147/ http://journalarticle.ukm.my/25147/ http://journalarticle.ukm.my/25147/1/27.pdf |