Sustainable cost optimisation measures for the lifecycle of tolled highway projects in Malaysia

The implementation and maintenance of highway infrastructure often requires significant capital throughout its life cycle which affects stakeholders including the government, developers, operators, users, etc. Furthermore, the sustainability aspect and existing toll systems in Malaysia are currently...

Full description

Bibliographic Details
Main Authors: Sukumar, Sukhadeva S., Muhamad Iqbal Aslam Abd Hafiz Muhamad, Abu Hanifah Yusof, Mohd Azizul Ladin, Razuhanafi Mat Yazid, Mukhlis Nahriri Bastam
Format: Article
Language:English
Published: Penerbit Universiti Kebangsaan Malaysia 2023
Online Access:http://journalarticle.ukm.my/22129/
http://journalarticle.ukm.my/22129/1/jk_19.pdf
_version_ 1848815522918957056
author Sukumar, Sukhadeva S.
Muhamad Iqbal Aslam Abd Hafiz Muhamad,
Abu Hanifah Yusof,
Mohd Azizul Ladin,
Razuhanafi Mat Yazid,
Mukhlis Nahriri Bastam,
author_facet Sukumar, Sukhadeva S.
Muhamad Iqbal Aslam Abd Hafiz Muhamad,
Abu Hanifah Yusof,
Mohd Azizul Ladin,
Razuhanafi Mat Yazid,
Mukhlis Nahriri Bastam,
author_sort Sukumar, Sukhadeva S.
building UKM Institutional Repository
collection Online Access
description The implementation and maintenance of highway infrastructure often requires significant capital throughout its life cycle which affects stakeholders including the government, developers, operators, users, etc. Furthermore, the sustainability aspect and existing toll systems in Malaysia are currently in the midst of being re-evaluated in order to attain a long-term gain that benefits both road users and relevant stakeholders. The objective of this study is to propose a Life Cycle Cost Analysis (LCCA) model for sustainable highway projects in Malaysia which considers certain cost optimisation measures throughout the stages of concept, design, construction, and operation & maintenance. The proposed LCCA model intends to act as a cost optimisation tool that provides sustainability recommendations for toll systems, highway alignments, pavement maintenance and rehabilitation, existing policies, contract and project type, material, equipment, time-cost factor, etc. Additionally, a relationship between the financial efficiency of toll systems and the affect it has on the overall cost of highway projects was established. The significance of cost pertaining to highway infrastructure components and the perception of toll systems was evaluated via a survey questionnaire; distributed to a select group of senior and principal engineers. The survey utilised a 5-point Likert scale which assisted in forming a regression analysis along with determining a correlation between toll systems and the overall cost of highway projects. Secondary data obtained from a reputable consultancy aided in understanding highway components that could potentially undergo further cost optimisation. Lastly, the sustainable and cost optimised LCCA model consists of recommendations and measures intended for a new age of sustainable highway projects in Malaysia.
first_indexed 2025-11-15T00:51:19Z
format Article
id oai:generic.eprints.org:22129
institution Universiti Kebangasaan Malaysia
institution_category Local University
language English
last_indexed 2025-11-15T00:51:19Z
publishDate 2023
publisher Penerbit Universiti Kebangsaan Malaysia
recordtype eprints
repository_type Digital Repository
spelling oai:generic.eprints.org:221292023-08-18T02:40:05Z http://journalarticle.ukm.my/22129/ Sustainable cost optimisation measures for the lifecycle of tolled highway projects in Malaysia Sukumar, Sukhadeva S. Muhamad Iqbal Aslam Abd Hafiz Muhamad, Abu Hanifah Yusof, Mohd Azizul Ladin, Razuhanafi Mat Yazid, Mukhlis Nahriri Bastam, The implementation and maintenance of highway infrastructure often requires significant capital throughout its life cycle which affects stakeholders including the government, developers, operators, users, etc. Furthermore, the sustainability aspect and existing toll systems in Malaysia are currently in the midst of being re-evaluated in order to attain a long-term gain that benefits both road users and relevant stakeholders. The objective of this study is to propose a Life Cycle Cost Analysis (LCCA) model for sustainable highway projects in Malaysia which considers certain cost optimisation measures throughout the stages of concept, design, construction, and operation & maintenance. The proposed LCCA model intends to act as a cost optimisation tool that provides sustainability recommendations for toll systems, highway alignments, pavement maintenance and rehabilitation, existing policies, contract and project type, material, equipment, time-cost factor, etc. Additionally, a relationship between the financial efficiency of toll systems and the affect it has on the overall cost of highway projects was established. The significance of cost pertaining to highway infrastructure components and the perception of toll systems was evaluated via a survey questionnaire; distributed to a select group of senior and principal engineers. The survey utilised a 5-point Likert scale which assisted in forming a regression analysis along with determining a correlation between toll systems and the overall cost of highway projects. Secondary data obtained from a reputable consultancy aided in understanding highway components that could potentially undergo further cost optimisation. Lastly, the sustainable and cost optimised LCCA model consists of recommendations and measures intended for a new age of sustainable highway projects in Malaysia. Penerbit Universiti Kebangsaan Malaysia 2023 Article PeerReviewed application/pdf en http://journalarticle.ukm.my/22129/1/jk_19.pdf Sukumar, Sukhadeva S. and Muhamad Iqbal Aslam Abd Hafiz Muhamad, and Abu Hanifah Yusof, and Mohd Azizul Ladin, and Razuhanafi Mat Yazid, and Mukhlis Nahriri Bastam, (2023) Sustainable cost optimisation measures for the lifecycle of tolled highway projects in Malaysia. Jurnal Kejuruteraan, 35 (2). pp. 475-484. ISSN 0128-0198 https://www.ukm.my/jkukm/volume-3502-2023/
spellingShingle Sukumar, Sukhadeva S.
Muhamad Iqbal Aslam Abd Hafiz Muhamad,
Abu Hanifah Yusof,
Mohd Azizul Ladin,
Razuhanafi Mat Yazid,
Mukhlis Nahriri Bastam,
Sustainable cost optimisation measures for the lifecycle of tolled highway projects in Malaysia
title Sustainable cost optimisation measures for the lifecycle of tolled highway projects in Malaysia
title_full Sustainable cost optimisation measures for the lifecycle of tolled highway projects in Malaysia
title_fullStr Sustainable cost optimisation measures for the lifecycle of tolled highway projects in Malaysia
title_full_unstemmed Sustainable cost optimisation measures for the lifecycle of tolled highway projects in Malaysia
title_short Sustainable cost optimisation measures for the lifecycle of tolled highway projects in Malaysia
title_sort sustainable cost optimisation measures for the lifecycle of tolled highway projects in malaysia
url http://journalarticle.ukm.my/22129/
http://journalarticle.ukm.my/22129/
http://journalarticle.ukm.my/22129/1/jk_19.pdf