A study on time based for visual inspectors at Western Digital Batu Kawan production line
This research is aimed to develop time-based guidelines that can help to preserve the optical health of the visual inspectors at SanDisk Storage Malaysia (a WD company). The research objectives is to identify the time patterns where defect escapees occur, to analyse relationship between time and...
| Main Author: | Puspavathi, S. Rama Naidu |
|---|---|
| Format: | Thesis |
| Published: |
2021
|
| Subjects: | |
| Online Access: | https://library.oum.edu.my/repository/1533/ |
Similar Items
Productivity study and line balancing of GGMG & CALICO production line
by: Hartini, Mustafa, et al.
Published: (2012)
by: Hartini, Mustafa, et al.
Published: (2012)
Productivity improvement through line balancing
by: Hazmil, Hapaz
Published: (2008)
by: Hazmil, Hapaz
Published: (2008)
The intention of green products purchasing among Malaysian consumers: a case study of Batu Pahat, Johor
by: Lee, Te Chuan, et al.
Published: (2018)
by: Lee, Te Chuan, et al.
Published: (2018)
Simulation of assembly line for production performance improvement
by: Mohd Saiful Akmal, Razali
Published: (2016)
by: Mohd Saiful Akmal, Razali
Published: (2016)
An integrated model for production line balancing planning
by: Ali, A. J. Adham
Published: (2012)
by: Ali, A. J. Adham
Published: (2012)
Job sequencing and layout optimization in virtual production line
by: Zahari, Taha, et al.
Published: (2011)
by: Zahari, Taha, et al.
Published: (2011)
A study of production line operation in electronic manufacturing industry
by: Ong, Pei Shan
Published: (2014)
by: Ong, Pei Shan
Published: (2014)
True height description of equatorial F-layer over Parit Raja, Batu Pahat, Malaysia
by: Zeti Akma, Rhazali, et al.
Published: (2011)
by: Zeti Akma, Rhazali, et al.
Published: (2011)
Line Balancing Analysis of a Multi-Products Processing with a Single Type of Supply
by: Mohd Syahidan, Kamarudin, et al.
Published: (2015)
by: Mohd Syahidan, Kamarudin, et al.
Published: (2015)
Development of a network data envelopment analysis (DEA) model to measure the performance of the production line
by: Nor Affaf, Mohd Zainal Abiddin
Published: (2020)
by: Nor Affaf, Mohd Zainal Abiddin
Published: (2020)
Production line: effect of different inspection station allocation under accepts reject inspection policy
by: Rakiman, Umol Syamsyul
Published: (2013)
by: Rakiman, Umol Syamsyul
Published: (2013)
Hybrid genetic algorithms and line search method for industrial production
planning with non-linear fitness function
by: Vasant, Pandian
Published: (2009)
by: Vasant, Pandian
Published: (2009)
Mitigation of WIP-related problems at an IC production line through a suitable inspection sampling plan
by: Karim, A.N. Mustafizul, et al.
Published: (2014)
by: Karim, A.N. Mustafizul, et al.
Published: (2014)
Productivity improvement through line balancing technique in a small medium enterprise (SME) manufacturing plant
by: Shahfiran, Sarifuddin
Published: (2007)
by: Shahfiran, Sarifuddin
Published: (2007)
Overall equipment effectiveness analysis of power magnetic inductor production line at BI technologies sdn. bhd.
by: Nur Syuhadah, Abdul Wahab
Published: (2017)
by: Nur Syuhadah, Abdul Wahab
Published: (2017)
A Case Study: Strategies For Reducing Production Cycle Time
by: Tse, Ngu Ik
Published: (2009)
by: Tse, Ngu Ik
Published: (2009)
The application of using time-driven activity-based costing in product operation and service operation
by: Sri Nur Areena, Mohd Zaini
Published: (2021)
by: Sri Nur Areena, Mohd Zaini
Published: (2021)
Hierarchical Production Planning, Framework For The Batch Production Environment With Setup Time And Setup Cost Restrictions
by: Teo , Siew Chein
Published: (2005)
by: Teo , Siew Chein
Published: (2005)
The study on implementation of lean production system in front disc D54T line at Sapura Machining Corporation Sdn
by: Najibah, Anuar
Published: (2012)
by: Najibah, Anuar
Published: (2012)
Comparative study between product- and service-based operations using time-driven activity-based costing
by: Mohd Yazid, Abu, et al.
Published: (2021)
by: Mohd Yazid, Abu, et al.
Published: (2021)
Torrefaction process : the effect of temperature and residence time to the production of torrefied rubberwood
by: Muhammad Faisal, Baderolhissam
Published: (2014)
by: Muhammad Faisal, Baderolhissam
Published: (2014)
Railroad inspector for railroad department in Malaysia /
by: Azuan, Ismail
Published: (2013)
by: Azuan, Ismail
Published: (2013)
Food technology and the role of the health inspectors
by: Mohd Zain, Asiah
Published: (1982)
by: Mohd Zain, Asiah
Published: (1982)
A review on the integration of mahalanobis-taguchi system and time-driven activity-based costing on production environment
by: Mohd Yazid, Abu, et al.
Published: (2019)
by: Mohd Yazid, Abu, et al.
Published: (2019)
Modelling and simulation of flexible production line for coil winding assembly
by: Hazimah, Abdul Rahim
Published: (2015)
by: Hazimah, Abdul Rahim
Published: (2015)
Development A New Costing Structure In Product And Service Operation Using Time Driven Activity based Costing
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2022)
by: Sri Nur Areena, Mohd Zaini, et al.
Published: (2022)
Assembly Line Balancing with Resource Constraints using New
Rank-Based Crossovers
by: Nur Hairunnisa, Kamarudin, et al.
Published: (2017)
by: Nur Hairunnisa, Kamarudin, et al.
Published: (2017)
Simulation of Assembly Line Balancing in Automotive Component Manufacturing
by: Muthanna , Jamil, et al.
Published: (2016)
by: Muthanna , Jamil, et al.
Published: (2016)
Optimum Workspace Design in A Plug Assembly Line
by: Adi , Saptari, et al.
Published: (2007)
by: Adi , Saptari, et al.
Published: (2007)
A case study on implementation of just-in-time (JIT) production system in Malaysia automotive industry
by: Nurul Fateha, Abd Aziz
Published: (2012)
by: Nurul Fateha, Abd Aziz
Published: (2012)
A Comparative Study of Product Costing by Using Activity-Based Costing (ABC) and Time-Driven Activity-Based Costing (TDABC) Method
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
by: Nurul Farahin, Zamrud, et al.
Published: (2019)
Pusat kawan, negeri lawan
by: Harian Metro
Published: (2021)
by: Harian Metro
Published: (2021)
Kawan sekampus pilihan saya
by: Ali, Norhayati
Published: (2018)
by: Ali, Norhayati
Published: (2018)
Kawan jangan sampai terbabas
by: Che Omar, Intan Suhana
Published: (2023)
by: Che Omar, Intan Suhana
Published: (2023)
Digital Analysis of Badminton Athlete Motion
by: Zahari, Taha, et al.
Published: (2015)
by: Zahari, Taha, et al.
Published: (2015)
A Review of Two-sided Assembly Line Balancing Problem
by: Abdullah Make, Muhammad Razif, et al.
Published: (2016)
by: Abdullah Make, Muhammad Razif, et al.
Published: (2016)
Line balancing technique implementation in a small and medium industry
by: Cek Seng, Koh
Published: (2012)
by: Cek Seng, Koh
Published: (2012)
Assembly Line Balancing using Heuristic Approaches in Manufacturing Industry
by: Muhammad Razif, Abdullah Make, et al.
Published: (2017)
by: Muhammad Razif, Abdullah Make, et al.
Published: (2017)
A study on technical cleanliness at automotive component assembly line
by: Nur Azaida Ruzlyn, Ruzini
Published: (2017)
by: Nur Azaida Ruzlyn, Ruzini
Published: (2017)
A case study in electrical & electronic industry using mahalanobis-taguchi system and time-driven activity-based costing on production environment
by: Nik Nurharyantie, Nik Mohd Kamil
Published: (2021)
by: Nik Nurharyantie, Nik Mohd Kamil
Published: (2021)
Similar Items
-
Productivity study and line balancing of GGMG & CALICO production line
by: Hartini, Mustafa, et al.
Published: (2012) -
Productivity improvement through line balancing
by: Hazmil, Hapaz
Published: (2008) -
The intention of green products purchasing among Malaysian consumers: a case study of Batu Pahat, Johor
by: Lee, Te Chuan, et al.
Published: (2018) -
Simulation of assembly line for production performance improvement
by: Mohd Saiful Akmal, Razali
Published: (2016) -
An integrated model for production line balancing planning
by: Ali, A. J. Adham
Published: (2012)