An optimisation model for scheduling the decommissioning of an offshore wind farm
An optimisation model is proposed for scheduling the decommissioning of an offshore wind farm in order to minimise the total cost which is comprised of jack-up vessel, barge (transfer) vessel, inventory, processing and on-land transportation costs. This paper also presents a comprehensive review of...
| Main Authors: | , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Springer Verlag
2019
|
| Subjects: | |
| Online Access: | https://eprints.nottingham.ac.uk/59781/ |
| _version_ | 1848799674564083712 |
|---|---|
| author | Irawan, Chandra Ade Wall, Graham Jones, Dylan |
| author_facet | Irawan, Chandra Ade Wall, Graham Jones, Dylan |
| author_sort | Irawan, Chandra Ade |
| building | Nottingham Research Data Repository |
| collection | Online Access |
| description | An optimisation model is proposed for scheduling the decommissioning of an offshore wind farm in order to minimise the total cost which is comprised of jack-up vessel, barge (transfer) vessel, inventory, processing and on-land transportation costs. This paper also presents a comprehensive review of the strategic issues relating to the decommissioning process and of scheduling models that have been applied to offshore wind farms. A mathematical model using integer linear programming is developed to determine the optimal schedule considering several constraints such as the availability of vessels and planning delays. As the decommissioning problem is challenging to solve, a matheuristic approach based on the hybridisation of a heuristic approach and an exact method is also proposed to find near optimal solutions for a test set of problems. A set of computational experiments has been carried out to assess the proposed approach. |
| first_indexed | 2025-11-14T20:39:25Z |
| format | Article |
| id | nottingham-59781 |
| institution | University of Nottingham Malaysia Campus |
| institution_category | Local University |
| language | English |
| last_indexed | 2025-11-14T20:39:25Z |
| publishDate | 2019 |
| publisher | Springer Verlag |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | nottingham-597812020-02-28T03:47:41Z https://eprints.nottingham.ac.uk/59781/ An optimisation model for scheduling the decommissioning of an offshore wind farm Irawan, Chandra Ade Wall, Graham Jones, Dylan An optimisation model is proposed for scheduling the decommissioning of an offshore wind farm in order to minimise the total cost which is comprised of jack-up vessel, barge (transfer) vessel, inventory, processing and on-land transportation costs. This paper also presents a comprehensive review of the strategic issues relating to the decommissioning process and of scheduling models that have been applied to offshore wind farms. A mathematical model using integer linear programming is developed to determine the optimal schedule considering several constraints such as the availability of vessels and planning delays. As the decommissioning problem is challenging to solve, a matheuristic approach based on the hybridisation of a heuristic approach and an exact method is also proposed to find near optimal solutions for a test set of problems. A set of computational experiments has been carried out to assess the proposed approach. Springer Verlag 2019-02-08 Article PeerReviewed application/pdf en cc_by https://eprints.nottingham.ac.uk/59781/1/An%20optimisation%20model%20for%20scheduling%20the%20decommissioning%20of%20an%20offshore%20wind%20farm.pdf Irawan, Chandra Ade, Wall, Graham and Jones, Dylan (2019) An optimisation model for scheduling the decommissioning of an offshore wind farm. OR Spectrum, 41 (2). pp. 513-548. ISSN 0171-6468 Scheduling; Offshore wind farm; Renewable energy; Matheuristic http://dx.doi.org/10.1007/s00291-019-00546-z doi:10.1007/s00291-019-00546-z doi:10.1007/s00291-019-00546-z |
| spellingShingle | Scheduling; Offshore wind farm; Renewable energy; Matheuristic Irawan, Chandra Ade Wall, Graham Jones, Dylan An optimisation model for scheduling the decommissioning of an offshore wind farm |
| title | An optimisation model for scheduling the decommissioning of an offshore wind farm |
| title_full | An optimisation model for scheduling the decommissioning of an offshore wind farm |
| title_fullStr | An optimisation model for scheduling the decommissioning of an offshore wind farm |
| title_full_unstemmed | An optimisation model for scheduling the decommissioning of an offshore wind farm |
| title_short | An optimisation model for scheduling the decommissioning of an offshore wind farm |
| title_sort | optimisation model for scheduling the decommissioning of an offshore wind farm |
| topic | Scheduling; Offshore wind farm; Renewable energy; Matheuristic |