Quantifying the impact of variability in railway bridge asset management

Bridge asset management is often a challenging and complicated task due to the diversity, multitude and variation of bridge configurations. Much research has been carried out in the field of asset management which has resulted in a wealth of models to help with the decision making process. However,...

Full description

Bibliographic Details
Main Authors: Yianni, P.C., Neves, L.C., Rama, D., Andrews, J.D., Tedstone, N., Dean, R.
Format: Conference or Workshop Item
Published: 2018
Online Access:https://eprints.nottingham.ac.uk/51664/
_version_ 1848798546058280960
author Yianni, P.C.
Neves, L.C.
Rama, D.
Andrews, J.D.
Tedstone, N.
Dean, R.
author_facet Yianni, P.C.
Neves, L.C.
Rama, D.
Andrews, J.D.
Tedstone, N.
Dean, R.
author_sort Yianni, P.C.
building Nottingham Research Data Repository
collection Online Access
description Bridge asset management is often a challenging and complicated task due to the diversity, multitude and variation of bridge configurations. Much research has been carried out in the field of asset management which has resulted in a wealth of models to help with the decision making process. However, often these models oversimplify the process, resulting in a decision making tool that trivialises the complexity of the decisions. The purpose of this study was to ascertain what the main sources of variability are in the process and then quantify the impact of them in terms of the Whole Life-Cycle Cost (WLCC). The study focuses on human-induced variability to ensure the results are directly influenceable by bridge portfolio managers. The sources of variability identified include misdiagnoses of defects as well as imperfect repairs and variability in costs, all of which are aspects that bridge portfolio managers are exposed to. The sources of variability are quantified and then incorporated into an existing railway bridge WLCC model, established in a previous study, which uses a flexible Petri-Net (PN) approach which is able to incorporate the complex logic and probabilistic aspects. The model itself is able to replicate some of the more complicated decisions which have to be made in bridge asset management, especially those which influence the decisions around rehabilitation. The resulting model, enhanced with the probabilistic variability, is able to reveal the impact of variability on the asset condition, WLCC and even understand where operational complexities are occurring within the system. Incorporating human-induced variability into any model will inevitably increase the financial and operational burden predicted by the model, however, recognising and modelling these aspects is a crucial step in providing bridge portfolio managers a more robust and accurate decision making tool which can more accurately replicate the real world system.
first_indexed 2025-11-14T20:21:29Z
format Conference or Workshop Item
id nottingham-51664
institution University of Nottingham Malaysia Campus
institution_category Local University
last_indexed 2025-11-14T20:21:29Z
publishDate 2018
recordtype eprints
repository_type Digital Repository
spelling nottingham-516642020-05-04T19:49:46Z https://eprints.nottingham.ac.uk/51664/ Quantifying the impact of variability in railway bridge asset management Yianni, P.C. Neves, L.C. Rama, D. Andrews, J.D. Tedstone, N. Dean, R. Bridge asset management is often a challenging and complicated task due to the diversity, multitude and variation of bridge configurations. Much research has been carried out in the field of asset management which has resulted in a wealth of models to help with the decision making process. However, often these models oversimplify the process, resulting in a decision making tool that trivialises the complexity of the decisions. The purpose of this study was to ascertain what the main sources of variability are in the process and then quantify the impact of them in terms of the Whole Life-Cycle Cost (WLCC). The study focuses on human-induced variability to ensure the results are directly influenceable by bridge portfolio managers. The sources of variability identified include misdiagnoses of defects as well as imperfect repairs and variability in costs, all of which are aspects that bridge portfolio managers are exposed to. The sources of variability are quantified and then incorporated into an existing railway bridge WLCC model, established in a previous study, which uses a flexible Petri-Net (PN) approach which is able to incorporate the complex logic and probabilistic aspects. The model itself is able to replicate some of the more complicated decisions which have to be made in bridge asset management, especially those which influence the decisions around rehabilitation. The resulting model, enhanced with the probabilistic variability, is able to reveal the impact of variability on the asset condition, WLCC and even understand where operational complexities are occurring within the system. Incorporating human-induced variability into any model will inevitably increase the financial and operational burden predicted by the model, however, recognising and modelling these aspects is a crucial step in providing bridge portfolio managers a more robust and accurate decision making tool which can more accurately replicate the real world system. 2018-10-28 Conference or Workshop Item PeerReviewed Yianni, P.C., Neves, L.C., Rama, D., Andrews, J.D., Tedstone, N. and Dean, R. (2018) Quantifying the impact of variability in railway bridge asset management. In: The Sixth International Symposium on Life-Cycle Civil Engineering (IALCCE 2018), 28-31 October 2018, Ghent, Belgium.
spellingShingle Yianni, P.C.
Neves, L.C.
Rama, D.
Andrews, J.D.
Tedstone, N.
Dean, R.
Quantifying the impact of variability in railway bridge asset management
title Quantifying the impact of variability in railway bridge asset management
title_full Quantifying the impact of variability in railway bridge asset management
title_fullStr Quantifying the impact of variability in railway bridge asset management
title_full_unstemmed Quantifying the impact of variability in railway bridge asset management
title_short Quantifying the impact of variability in railway bridge asset management
title_sort quantifying the impact of variability in railway bridge asset management
url https://eprints.nottingham.ac.uk/51664/