A SIMULATED ANNEALING APPROACH TO SCHEDULING: A CASE STUDY OF BOOTS CONTRACT MANUFACTURING (BCM)

Scheduling is a crucial branch within operations management. Its application ranges from the manufacturing industry to the service industry. Traditionally, dispatching rules are used to optimise schedules to meet the organisations objectives. This research project focuses on the implementation of me...

Full description

Bibliographic Details
Main Author: DAR, UMAR B.T.
Format: Dissertation (University of Nottingham only)
Language:English
Published: 2017
Subjects:
Online Access:https://eprints.nottingham.ac.uk/45868/
_version_ 1848797210159874048
author DAR, UMAR B.T.
author_facet DAR, UMAR B.T.
author_sort DAR, UMAR B.T.
building Nottingham Research Data Repository
collection Online Access
description Scheduling is a crucial branch within operations management. Its application ranges from the manufacturing industry to the service industry. Traditionally, dispatching rules are used to optimise schedules to meet the organisations objectives. This research project focuses on the implementation of metaheuristics for scheduling, with particular focus on simulated annealing. The simulated annealing technique is developed in Visual Basic (VBA) embedded within Microsoft Excel. It is then evaluated on data obtained from Boots Contract Manufacturing (BCM), which is assumed to adhere to a single machine layout. The simulated annealing algorithm was tested in several variances. Two objective functions (minimum average tardiness and minimum number of tardy jobs) were implemented and their corresponding schedules were assessed against the other objective function. The variation operator which produced the best schedules for the above mentioned objective functions involved using a logic function to switch the tardiest job in the queue. Through the implementation of this variation operator schedules with zero tardiness were obtained. This research provides basis for the implementation of metaheuristics in scheduling for other machine layout models, as it proved the effectiveness of simulated annealing by producing schedules that entirely fulfilled the objective.
first_indexed 2025-11-14T20:00:15Z
format Dissertation (University of Nottingham only)
id nottingham-45868
institution University of Nottingham Malaysia Campus
institution_category Local University
language English
last_indexed 2025-11-14T20:00:15Z
publishDate 2017
recordtype eprints
repository_type Digital Repository
spelling nottingham-458682018-04-17T15:12:57Z https://eprints.nottingham.ac.uk/45868/ A SIMULATED ANNEALING APPROACH TO SCHEDULING: A CASE STUDY OF BOOTS CONTRACT MANUFACTURING (BCM) DAR, UMAR B.T. Scheduling is a crucial branch within operations management. Its application ranges from the manufacturing industry to the service industry. Traditionally, dispatching rules are used to optimise schedules to meet the organisations objectives. This research project focuses on the implementation of metaheuristics for scheduling, with particular focus on simulated annealing. The simulated annealing technique is developed in Visual Basic (VBA) embedded within Microsoft Excel. It is then evaluated on data obtained from Boots Contract Manufacturing (BCM), which is assumed to adhere to a single machine layout. The simulated annealing algorithm was tested in several variances. Two objective functions (minimum average tardiness and minimum number of tardy jobs) were implemented and their corresponding schedules were assessed against the other objective function. The variation operator which produced the best schedules for the above mentioned objective functions involved using a logic function to switch the tardiest job in the queue. Through the implementation of this variation operator schedules with zero tardiness were obtained. This research provides basis for the implementation of metaheuristics in scheduling for other machine layout models, as it proved the effectiveness of simulated annealing by producing schedules that entirely fulfilled the objective. 2017-09-12 Dissertation (University of Nottingham only) NonPeerReviewed application/pdf en https://eprints.nottingham.ac.uk/45868/1/MSc%20Industrial%20Eng.%20and%20Ops.%20Man.%20Dissertation%20-%20Umar%20Dar%20%284265497%29.pdf DAR, UMAR B.T. (2017) A SIMULATED ANNEALING APPROACH TO SCHEDULING: A CASE STUDY OF BOOTS CONTRACT MANUFACTURING (BCM). [Dissertation (University of Nottingham only)] DISSERTATION FOR MSc INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT
spellingShingle DISSERTATION FOR MSc INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT
DAR, UMAR B.T.
A SIMULATED ANNEALING APPROACH TO SCHEDULING: A CASE STUDY OF BOOTS CONTRACT MANUFACTURING (BCM)
title A SIMULATED ANNEALING APPROACH TO SCHEDULING: A CASE STUDY OF BOOTS CONTRACT MANUFACTURING (BCM)
title_full A SIMULATED ANNEALING APPROACH TO SCHEDULING: A CASE STUDY OF BOOTS CONTRACT MANUFACTURING (BCM)
title_fullStr A SIMULATED ANNEALING APPROACH TO SCHEDULING: A CASE STUDY OF BOOTS CONTRACT MANUFACTURING (BCM)
title_full_unstemmed A SIMULATED ANNEALING APPROACH TO SCHEDULING: A CASE STUDY OF BOOTS CONTRACT MANUFACTURING (BCM)
title_short A SIMULATED ANNEALING APPROACH TO SCHEDULING: A CASE STUDY OF BOOTS CONTRACT MANUFACTURING (BCM)
title_sort simulated annealing approach to scheduling: a case study of boots contract manufacturing (bcm)
topic DISSERTATION FOR MSc INDUSTRIAL ENGINEERING AND OPERATIONS MANAGEMENT
url https://eprints.nottingham.ac.uk/45868/