DAR, U. B. (2017). A SIMULATED ANNEALING APPROACH TO SCHEDULING: A CASE STUDY OF BOOTS CONTRACT MANUFACTURING (BCM).
Chicago Style (17th ed.) CitationDAR, UMAR B.T. A SIMULATED ANNEALING APPROACH TO SCHEDULING: A CASE STUDY OF BOOTS CONTRACT MANUFACTURING (BCM). 2017.
MLA (9th ed.) CitationDAR, UMAR B.T. A SIMULATED ANNEALING APPROACH TO SCHEDULING: A CASE STUDY OF BOOTS CONTRACT MANUFACTURING (BCM). 2017.
Warning: These citations may not always be 100% accurate.