Modelling railway overhead line equipment asset management

The Overhead Line Equipment (OLE) is a critical sub-system of the 25kV AC overhead railway electrification system, which is the main method of railway electrification on the British railway network. OLE failures can result in significant delays and pose risks to passenger safety, therefore, inspecti...

Full description

Bibliographic Details
Main Author: Kilsby, Paul
Format: Thesis (University of Nottingham only)
Language:English
Published: 2017
Subjects:
Online Access:https://eprints.nottingham.ac.uk/41496/
_version_ 1848796287023972352
author Kilsby, Paul
author_facet Kilsby, Paul
author_sort Kilsby, Paul
building Nottingham Research Data Repository
collection Online Access
description The Overhead Line Equipment (OLE) is a critical sub-system of the 25kV AC overhead railway electrification system, which is the main method of railway electrification on the British railway network. OLE failures can result in significant delays and pose risks to passenger safety, therefore, inspection and maintenance is undertaken to improve component reliability and uphold the availability of the system. OLE asset management strategies can be evaluated using a life cycle cost analysis that considers degradation processes and maintenance activities of the OLE components. The investment required to deliver the level of performance desired by railway customers and regulators can be based on evidence from the analysis’ results. This thesis presents a methodology for modelling the asset management and calculating the whole life cost of the OLE to allow such analysis to take place. This research has developed a High Level Petri net model to simulate the degradation, failure, inspection and maintenance of the main OLE components in a stochastic manner. The model simulates all the main OLE components concurrently in the same model and fixed time interval inspections and condition-based maintenance regimes are considered. The various dependencies between the different components and processes considered, such as opportunistic inspection and maintenance, are also taken into account. The use of High Level Petri nets allows the processes considered to be modelled in a more accurate and efficient manner in comparison to standard Petri nets. The model is used to calculate various statistics associated with the cost, maintenance requirements and reliability of the individual OLE components and the OLE system over its life cycle. This is demonstrated using an example analysis for a 2-mile section of electrified line, which also describes how the outputs obtained can be used by decision makers to study the performance of the components and the implications of the maintenance strategy evaluated by the model. Finally, a Genetic Algorithm is used in conjunction with the Petri net developed to find the optimum maintenance strategies that result in the lowest total cost of the system. The optimum strategy chosen results in a 15% lower expected total cost and 10% fewer expected failures in comparison to the maintenance strategy currently implemented for the OLE on the British railway network, whilst requiring a similar number of maintenance visits. The methodology presented considers the OLE components and the processes described above in more detail than previous literature associated with asset management and life cycle cost analysis of the OLE. Additionally, the suitability and ways in which Petri nets can be used for modelling the asset management of other large engineering systems, comprised of numerous components with various dependencies, is confirmed. Furthermore, the practical use of the model, as an asset management tool, capable of calculating a comprehensive range of outputs calculated, is demonstrated.
first_indexed 2025-11-14T19:45:35Z
format Thesis (University of Nottingham only)
id nottingham-41496
institution University of Nottingham Malaysia Campus
institution_category Local University
language English
last_indexed 2025-11-14T19:45:35Z
publishDate 2017
recordtype eprints
repository_type Digital Repository
spelling nottingham-414962025-02-28T13:43:09Z https://eprints.nottingham.ac.uk/41496/ Modelling railway overhead line equipment asset management Kilsby, Paul The Overhead Line Equipment (OLE) is a critical sub-system of the 25kV AC overhead railway electrification system, which is the main method of railway electrification on the British railway network. OLE failures can result in significant delays and pose risks to passenger safety, therefore, inspection and maintenance is undertaken to improve component reliability and uphold the availability of the system. OLE asset management strategies can be evaluated using a life cycle cost analysis that considers degradation processes and maintenance activities of the OLE components. The investment required to deliver the level of performance desired by railway customers and regulators can be based on evidence from the analysis’ results. This thesis presents a methodology for modelling the asset management and calculating the whole life cost of the OLE to allow such analysis to take place. This research has developed a High Level Petri net model to simulate the degradation, failure, inspection and maintenance of the main OLE components in a stochastic manner. The model simulates all the main OLE components concurrently in the same model and fixed time interval inspections and condition-based maintenance regimes are considered. The various dependencies between the different components and processes considered, such as opportunistic inspection and maintenance, are also taken into account. The use of High Level Petri nets allows the processes considered to be modelled in a more accurate and efficient manner in comparison to standard Petri nets. The model is used to calculate various statistics associated with the cost, maintenance requirements and reliability of the individual OLE components and the OLE system over its life cycle. This is demonstrated using an example analysis for a 2-mile section of electrified line, which also describes how the outputs obtained can be used by decision makers to study the performance of the components and the implications of the maintenance strategy evaluated by the model. Finally, a Genetic Algorithm is used in conjunction with the Petri net developed to find the optimum maintenance strategies that result in the lowest total cost of the system. The optimum strategy chosen results in a 15% lower expected total cost and 10% fewer expected failures in comparison to the maintenance strategy currently implemented for the OLE on the British railway network, whilst requiring a similar number of maintenance visits. The methodology presented considers the OLE components and the processes described above in more detail than previous literature associated with asset management and life cycle cost analysis of the OLE. Additionally, the suitability and ways in which Petri nets can be used for modelling the asset management of other large engineering systems, comprised of numerous components with various dependencies, is confirmed. Furthermore, the practical use of the model, as an asset management tool, capable of calculating a comprehensive range of outputs calculated, is demonstrated. 2017-07-13 Thesis (University of Nottingham only) NonPeerReviewed application/pdf en arr https://eprints.nottingham.ac.uk/41496/1/Paul%20Kilsby%20PhD%20Thesis.pdf Kilsby, Paul (2017) Modelling railway overhead line equipment asset management. PhD thesis, University of Nottingham. Electric railroads Electronic equipment Maintenance and repair Life cycle costing
spellingShingle Electric railroads
Electronic equipment
Maintenance and repair
Life cycle costing
Kilsby, Paul
Modelling railway overhead line equipment asset management
title Modelling railway overhead line equipment asset management
title_full Modelling railway overhead line equipment asset management
title_fullStr Modelling railway overhead line equipment asset management
title_full_unstemmed Modelling railway overhead line equipment asset management
title_short Modelling railway overhead line equipment asset management
title_sort modelling railway overhead line equipment asset management
topic Electric railroads
Electronic equipment
Maintenance and repair
Life cycle costing
url https://eprints.nottingham.ac.uk/41496/