Analysis of non-coherent fault trees using ternary decision diagrams
Risk and safety assessments performed on potentially hazardous industrial systems commonly utilise Fault Tree Analysis (FTA) to forecast the probability of system failure. The type of logic for the top event is usually limited to AND and OR gates which leads to a coherent fault tree structure. In no...
| Main Authors: | Remenyte-Prescott, Rasa, Andrews, John |
|---|---|
| Format: | Article |
| Published: |
Sage
2008
|
| Online Access: | https://eprints.nottingham.ac.uk/3314/ |
Similar Items
Prime implicants for modularised non-coherent fault trees using binary decision diagrams
by: Remenyte-Prescott, Rasa, et al.
Published: (2007)
by: Remenyte-Prescott, Rasa, et al.
Published: (2007)
Qualitative analysis of complex modularized fault trees using binary decision diagrams
by: Remenyte-Prescott, Rasa, et al.
Published: (2006)
by: Remenyte-Prescott, Rasa, et al.
Published: (2006)
An efficient real-time method of analysis for non-coherent fault trees
by: Remenyte-Prescott, Rasa, et al.
Published: (2009)
by: Remenyte-Prescott, Rasa, et al.
Published: (2009)
An enhanced component connection method for conversion of fault trees to binary decision diagrams
by: Remenyte-Prescott, Rasa, et al.
Published: (2008)
by: Remenyte-Prescott, Rasa, et al.
Published: (2008)
A reliability analysis method using binary decision
diagrams in phased mission planning
by: Prescott, Darren, et al.
Published: (2009)
by: Prescott, Darren, et al.
Published: (2009)
Fault propagation modelling for fluid system health monitoring
by: Remenyte-Prescott, Rasa, et al.
Published: (2011)
by: Remenyte-Prescott, Rasa, et al.
Published: (2011)
A sensor selection method for fault diagnostics
by: Reeves, J., et al.
Published: (2017)
by: Reeves, J., et al.
Published: (2017)
Railway bridge structural health monitoring and fault detection: state-of-the-art methods and future challenges
by: Vagnoli, Matteo, et al.
Published: (2018)
by: Vagnoli, Matteo, et al.
Published: (2018)
A fuzzy-based Bayesian Belief Network approach for railway bridge condition monitoring and fault detection
by: Vagnoli, Matteo, et al.
Published: (2017)
by: Vagnoli, Matteo, et al.
Published: (2017)
Fault detection and diagnostics of a three-phase separator
by: Vileiniskis, Marius, et al.
Published: (2016)
by: Vileiniskis, Marius, et al.
Published: (2016)
Bayesian belief networks for fault detection and diagnostics of a three-phase separator
by: Vileiniskis, Marius, et al.
Published: (2016)
by: Vileiniskis, Marius, et al.
Published: (2016)
A Petri net approach to fault verification in phased mission systems using the standard deviation technique
by: Lloyd, Michael D., et al.
Published: (2014)
by: Lloyd, Michael D., et al.
Published: (2014)
An efficient phased mission reliability analysis for autonomous vehicles
by: Remenyte-Prescott, Rasa, et al.
Published: (2010)
by: Remenyte-Prescott, Rasa, et al.
Published: (2010)
A fault detection method for railway point systems
by: Vileiniskis, Marius, et al.
Published: (2016)
by: Vileiniskis, Marius, et al.
Published: (2016)
A Petri Net-based life cycle cost analysis approach
by: Kilsby, Paul, et al.
Published: (2018)
by: Kilsby, Paul, et al.
Published: (2018)
Road maintenance planning using network flow modelling
by: Yang, Chao, et al.
Published: (2015)
by: Yang, Chao, et al.
Published: (2015)
Railway bridge fault detection using Bayesian belief network
by: Vagnoli, M., et al.
Published: (2017)
by: Vagnoli, M., et al.
Published: (2017)
Pavement maintenance scheduling using genetic algorithms
by: Yang, Chao, et al.
Published: (2015)
by: Yang, Chao, et al.
Published: (2015)
Phase diagrams of Potts model with competing binary-ternary-quaternary interactions on Cayley tree
by: Baki, Nurul Farahana Ififi Omar, et al.
Published: (2019)
by: Baki, Nurul Farahana Ififi Omar, et al.
Published: (2019)
A network traffic flow model for motorway and urban highways
by: Yang, Chao, et al.
Published: (2014)
by: Yang, Chao, et al.
Published: (2014)
Application of network traffic flow model to road maintenance
by: Yang, Chao, et al.
Published: (2015)
by: Yang, Chao, et al.
Published: (2015)
Road network modelling for maintenance planning
by: Yang, C., et al.
Published: (2014)
by: Yang, C., et al.
Published: (2014)
A modelling approach for railway overhead line equipment asset management
by: Kilsby, Paul, et al.
Published: (2017)
by: Kilsby, Paul, et al.
Published: (2017)
Towards a real-time Structural Health Monitoring of railway bridges
by: Vagnoli, Matteo, et al.
Published: (2017)
by: Vagnoli, Matteo, et al.
Published: (2017)
Modelling asset management of railway overhead line equipment
by: Kilsby, P., et al.
Published: (2016)
by: Kilsby, P., et al.
Published: (2016)
Behaviors of phase diagrams of Ising model with competing ternary and binary interactions on a Cayley tree of arbitrary order
by: Akin, Hasan, et al.
Published: (2012)
by: Akin, Hasan, et al.
Published: (2012)
Phase diagrams of an Ising system with competing binary, prolonged ternary and next-nearest interactions on a Cayley tree
by: Ganikhodjaev, Nasir, et al.
Published: (2011)
by: Ganikhodjaev, Nasir, et al.
Published: (2011)
Phase diagram and extreme Gibbs measures of the Ising model on a Cayley tree in the presence of competing binary and ternary interactions
by: Ganikhodjaev, Nasir, et al.
Published: (2011)
by: Ganikhodjaev, Nasir, et al.
Published: (2011)
Extended Bow-Tie model for asset risk and reliability modeling: application to a passenger lift
by: Vileiniskis, Marius, et al.
Published: (2016)
by: Vileiniskis, Marius, et al.
Published: (2016)
Quantitative risk prognostics framework based on Petri Net and Bow-Tie models
by: Vileiniskis, Marius, et al.
Published: (2017)
by: Vileiniskis, Marius, et al.
Published: (2017)
Phase diagrams of a Potts model with competing Binary
and ternary interactions
by: Temir, Seyit, et al.
Published: (2010)
by: Temir, Seyit, et al.
Published: (2010)
Phase diagrams of a Potts Model with competing binary and ternary interactions
by: Temir, Seyit, et al.
Published: (2010)
by: Temir, Seyit, et al.
Published: (2010)
Ternary System of Pyrolytic Lignin, Mixed-Solvent and Water: Phase Diagram and Implications
by: Li, M., et al.
Published: (2018)
by: Li, M., et al.
Published: (2018)
Enhancing coherency analysis for fault detection and mapping using 3D diffraction imaging
by: Vermeulen, J., et al.
Published: (2006)
by: Vermeulen, J., et al.
Published: (2006)
Reliability assessment techniques for medical procedures
by: Reed, Sean, et al.
Published: (2016)
by: Reed, Sean, et al.
Published: (2016)
Effect of venepuncture process design on efficiency and failure rates: a simulation model study for secondary care
by: Reed, Sean, et al.
Published: (2017)
by: Reed, Sean, et al.
Published: (2017)
Reliability modelling of dispensing processes in community pharmacy
by: Naybour, M., et al.
Published: (2018)
by: Naybour, M., et al.
Published: (2018)
A data mining tool for detecting and predicting abnormal behaviour of railway tunnels
by: Vagnoli, Matteo, et al.
Published: (2017)
by: Vagnoli, Matteo, et al.
Published: (2017)
Modelling the effects of asset management decisions on a railway track section
by: Prescott, Darren, et al.
Published: (2014)
by: Prescott, Darren, et al.
Published: (2014)
Manipulation of boolean functions based on decision diagrams
by: Sim, Poh Ching
Published: (2003)
by: Sim, Poh Ching
Published: (2003)
Similar Items
-
Prime implicants for modularised non-coherent fault trees using binary decision diagrams
by: Remenyte-Prescott, Rasa, et al.
Published: (2007) -
Qualitative analysis of complex modularized fault trees using binary decision diagrams
by: Remenyte-Prescott, Rasa, et al.
Published: (2006) -
An efficient real-time method of analysis for non-coherent fault trees
by: Remenyte-Prescott, Rasa, et al.
Published: (2009) -
An enhanced component connection method for conversion of fault trees to binary decision diagrams
by: Remenyte-Prescott, Rasa, et al.
Published: (2008) -
A reliability analysis method using binary decision
diagrams in phased mission planning
by: Prescott, Darren, et al.
Published: (2009)