Facilities Layout Analysis in a Medium-Sized Gas Turbine Manufacturing Company

Layout design is a critical step in the process of facility planning and design. Since all performed activities are based on facilities layout, nowadays, various algorithms are in access to create a layout or to improve existing ones. These algorithms are either construction or improvement. In this...

Full description

Bibliographic Details
Main Author: Karimi, Sina
Format: Dissertation (University of Nottingham only)
Language:English
Published: 2010
Online Access:https://eprints.nottingham.ac.uk/28457/
_version_ 1848793575920238592
author Karimi, Sina
author_facet Karimi, Sina
author_sort Karimi, Sina
building Nottingham Research Data Repository
collection Online Access
description Layout design is a critical step in the process of facility planning and design. Since all performed activities are based on facilities layout, nowadays, various algorithms are in access to create a layout or to improve existing ones. These algorithms are either construction or improvement. In this essay, the layout of departments of 25MW gas turbines assembly factory was studied. Using CRAFT improver algorithm, a few changes have been suggested for the replacement of departments. The changes proposed by this algorithm result in reduction of total costs in transportation between departments by about 10 percent.
first_indexed 2025-11-14T19:02:29Z
format Dissertation (University of Nottingham only)
id nottingham-28457
institution University of Nottingham Malaysia Campus
institution_category Local University
language English
last_indexed 2025-11-14T19:02:29Z
publishDate 2010
recordtype eprints
repository_type Digital Repository
spelling nottingham-284572018-03-11T08:06:42Z https://eprints.nottingham.ac.uk/28457/ Facilities Layout Analysis in a Medium-Sized Gas Turbine Manufacturing Company Karimi, Sina Layout design is a critical step in the process of facility planning and design. Since all performed activities are based on facilities layout, nowadays, various algorithms are in access to create a layout or to improve existing ones. These algorithms are either construction or improvement. In this essay, the layout of departments of 25MW gas turbines assembly factory was studied. Using CRAFT improver algorithm, a few changes have been suggested for the replacement of departments. The changes proposed by this algorithm result in reduction of total costs in transportation between departments by about 10 percent. 2010 Dissertation (University of Nottingham only) NonPeerReviewed application/pdf en https://eprints.nottingham.ac.uk/28457/1/SinaKarimi.pdf Karimi, Sina (2010) Facilities Layout Analysis in a Medium-Sized Gas Turbine Manufacturing Company. [Dissertation (University of Nottingham only)]
spellingShingle Karimi, Sina
Facilities Layout Analysis in a Medium-Sized Gas Turbine Manufacturing Company
title Facilities Layout Analysis in a Medium-Sized Gas Turbine Manufacturing Company
title_full Facilities Layout Analysis in a Medium-Sized Gas Turbine Manufacturing Company
title_fullStr Facilities Layout Analysis in a Medium-Sized Gas Turbine Manufacturing Company
title_full_unstemmed Facilities Layout Analysis in a Medium-Sized Gas Turbine Manufacturing Company
title_short Facilities Layout Analysis in a Medium-Sized Gas Turbine Manufacturing Company
title_sort facilities layout analysis in a medium-sized gas turbine manufacturing company
url https://eprints.nottingham.ac.uk/28457/