Network flow models for intraday personnel scheduling problems

Personnel scheduling problems can be decomposed into two stages. In the first stage for each employee the working days have to be fixed. In the second stage for each day of the planning period an intraday scheduling problem has to be solved. It consists of the assignment of shifts to the employees w...

Full description

Bibliographic Details
Main Authors: Brucker, Peter, Qu, Rong
Format: Article
Published: Springer Verlag (Germany) 2014
Subjects:
Online Access:https://eprints.nottingham.ac.uk/28278/
_version_ 1848793541362319360
author Brucker, Peter
Qu, Rong
author_facet Brucker, Peter
Qu, Rong
author_sort Brucker, Peter
building Nottingham Research Data Repository
collection Online Access
description Personnel scheduling problems can be decomposed into two stages. In the first stage for each employee the working days have to be fixed. In the second stage for each day of the planning period an intraday scheduling problem has to be solved. It consists of the assignment of shifts to the employees who have to work on the day and for each working period of an employee a task assignment such that the demand of all tasks for personnel is covered. In Robinson et al. (Burke and Trick (Eds.), Proceedings of the 5th International Conference on the Practice and Theory of Automated Timetabling, 18th August–20th August 2004, Pittsburgh, PA, USA, pp. 561–566, 2005), the intraday problem has been formulated as a maximum flow problem. The assumptions are that, employees are qualified for all tasks, their shifts are given, and they are allowed to change tasks during the day. In this work, we extend the network flow model to cover the case where not all employees are qualified to perform all tasks. The model is further extended to be able to calculate shifts of employees for the given day, assuming that an earliest starting time, a latest finishing time, and a minimal working time are given. Labour cost can be also taken into account by solving a minimum cost network flow problem.
first_indexed 2025-11-14T19:01:56Z
format Article
id nottingham-28278
institution University of Nottingham Malaysia Campus
institution_category Local University
last_indexed 2025-11-14T19:01:56Z
publishDate 2014
publisher Springer Verlag (Germany)
recordtype eprints
repository_type Digital Repository
spelling nottingham-282782020-05-04T20:16:13Z https://eprints.nottingham.ac.uk/28278/ Network flow models for intraday personnel scheduling problems Brucker, Peter Qu, Rong Personnel scheduling problems can be decomposed into two stages. In the first stage for each employee the working days have to be fixed. In the second stage for each day of the planning period an intraday scheduling problem has to be solved. It consists of the assignment of shifts to the employees who have to work on the day and for each working period of an employee a task assignment such that the demand of all tasks for personnel is covered. In Robinson et al. (Burke and Trick (Eds.), Proceedings of the 5th International Conference on the Practice and Theory of Automated Timetabling, 18th August–20th August 2004, Pittsburgh, PA, USA, pp. 561–566, 2005), the intraday problem has been formulated as a maximum flow problem. The assumptions are that, employees are qualified for all tasks, their shifts are given, and they are allowed to change tasks during the day. In this work, we extend the network flow model to cover the case where not all employees are qualified to perform all tasks. The model is further extended to be able to calculate shifts of employees for the given day, assuming that an earliest starting time, a latest finishing time, and a minimal working time are given. Labour cost can be also taken into account by solving a minimum cost network flow problem. Springer Verlag (Germany) 2014 Article PeerReviewed Brucker, Peter and Qu, Rong (2014) Network flow models for intraday personnel scheduling problems. Annals of Operations Research, 218 (1). pp. 107-1142014. ISSN 0254-5330 Personnel scheduling Assignment problem Network flows http://link.springer.com/article/10.1007%2Fs10479-012-1234-y doi:10.1007/s10479-012-1234-y doi:10.1007/s10479-012-1234-y
spellingShingle Personnel scheduling
Assignment problem
Network flows
Brucker, Peter
Qu, Rong
Network flow models for intraday personnel scheduling problems
title Network flow models for intraday personnel scheduling problems
title_full Network flow models for intraday personnel scheduling problems
title_fullStr Network flow models for intraday personnel scheduling problems
title_full_unstemmed Network flow models for intraday personnel scheduling problems
title_short Network flow models for intraday personnel scheduling problems
title_sort network flow models for intraday personnel scheduling problems
topic Personnel scheduling
Assignment problem
Network flows
url https://eprints.nottingham.ac.uk/28278/
https://eprints.nottingham.ac.uk/28278/
https://eprints.nottingham.ac.uk/28278/