APA (7th ed.) Citation

Ting, L. S. H. (2012). A Study of Interactions between Lead Time Variability and Material Requirements Planning (MRP) performance VIA Simulation.

Chicago Style (17th ed.) Citation

Ting, Leslie Sze Hin. A Study of Interactions Between Lead Time Variability and Material Requirements Planning (MRP) Performance VIA Simulation. 2012.

MLA (9th ed.) Citation

Ting, Leslie Sze Hin. A Study of Interactions Between Lead Time Variability and Material Requirements Planning (MRP) Performance VIA Simulation. 2012.

Warning: These citations may not always be 100% accurate.