Advancing the Process Control Level of Key Processes within the Integrated Logistics Centre of Rolls-Royce plc. in Derby as Part of the “Improvement Journey to Process Excellence”
The company Rolls-Royce is engaged in a five year improvement plan that aims for excellent processes company-wide. One element of this plan is the improvement of the process control, which means the reduction of the variation in the process inputs and outputs. In this dissertation, the work that ha...
| Main Author: | Brendecke, Peter |
|---|---|
| Format: | Dissertation (University of Nottingham only) |
| Language: | English |
| Published: |
2009
|
| Online Access: | https://eprints.nottingham.ac.uk/22947/ |
Similar Items
World Class Operations in Aftermarket Logistics at Rolls Royce Group Plc
by: Vaithiyanathan, Shivany, et al.
Published: (2005)
by: Vaithiyanathan, Shivany, et al.
Published: (2005)
An Analysis of Structuration Process for ERP
Use in Rolls Royce
by: Zhao, Xuefei
Published: (2006)
by: Zhao, Xuefei
Published: (2006)
Life extension of critical ‘Group A’ components with a view to implement robust process for protection of these components by introducing protective tooling & management of this tooling into the build process for Trent 900 engines at Rolls Royce Plc Derby’s civil aerospace operation
by: Sheth, Hemanshu
Published: (2010)
by: Sheth, Hemanshu
Published: (2010)
Aero Repair and Overhaul Services at Rolls Royce Group Plc:
Application of Activity Based Costing
by: Vaithiyanathan, Shivany
Published: (2005)
by: Vaithiyanathan, Shivany
Published: (2005)
RISK MANAGEMENT OF WORLD CLASS OPERATIONS IN AFTERMARKET LOGISTICS AT ROLLS ROYCE
by: Leung, Lily
Published: (2005)
by: Leung, Lily
Published: (2005)
The Journey of Rolls-Royce towards Self-Directed Teams: An analysis of the Team Champion Model
by: Goplani, Neeta
Published: (2005)
by: Goplani, Neeta
Published: (2005)
ANALYSING SPARE PARTS FORECAST ACCURACY FOR CIVIL AEROSPACE IN ROLLS-ROYCE
by: Welburn, Matthew
Published: (2011)
by: Welburn, Matthew
Published: (2011)
Financial Controls Project at Rolls Royce
by: Samdani, Sandeep
Published: (2006)
by: Samdani, Sandeep
Published: (2006)
A Critical Analysis of the Management of Legacy and Low Volume Parts in Rolls-Royce
by: Dolphin, Nicola
Published: (2011)
by: Dolphin, Nicola
Published: (2011)
Knowledge Management in Planning and Control at Rolls-Royce
by: Clarke, Timothy David
Published: (2015)
by: Clarke, Timothy David
Published: (2015)
Use of planning parameters within Rolls-Royce: investigation of enablers and barriers for inventory reductions.
by: Hüfner, Claudia
Published: (2009)
by: Hüfner, Claudia
Published: (2009)
Improving the management of inventory in the Rolls-Royce Energy Aftermarket Business
by: Palmer, John
Published: (2011)
by: Palmer, John
Published: (2011)
Understanding The Effect of Supply Chain Complexity in Determining Organisational Responses to Critical Supply Chain Failure – Case Study Analysis of The Rolls-Royce PLC Supply Chain
by: Davies, Andrew S
Published: (2011)
by: Davies, Andrew S
Published: (2011)
Rolls-Royce Civil Aerospace Supplier Engineered Equipment Configuration Integration
by: Moreno Sanchez, Marlen
Published: (2016)
by: Moreno Sanchez, Marlen
Published: (2016)
Engaging People in Implementing Lean Manufacturing:
An Analysis of the Rolls- Royce Production System
by: Ford, Martin
Published: (2015)
by: Ford, Martin
Published: (2015)
Streamlining the Rolls Royce Supply Chain to Succeed in the 150 Seater Replacement Project
by: Hatta, Muhammad, et al.
Published: (2007)
by: Hatta, Muhammad, et al.
Published: (2007)
The Organisational and Information Systems of Rolls Royce
to Succeed the 150 seater Replacement Project
by: Hatta, Muhammad
Published: (2007)
by: Hatta, Muhammad
Published: (2007)
Streamlining the Manufacturing Supply Chain for Rolls Royce to Be Successful in the New 150 Seater Market
by: Shi, Xi
Published: (2007)
by: Shi, Xi
Published: (2007)
An Exploration of Process Improvement in Project Management at Experian plc
by: Matthews, Louisa
Published: (2008)
by: Matthews, Louisa
Published: (2008)
Benchmarking Rolls-Royce’s Legacy and Low Volume Supply Chain against Industry Best Practices
by: Zaytsev, Alexander
Published: (2011)
by: Zaytsev, Alexander
Published: (2011)
A non–financial supply chain performance measurement
framework for the Aerospace Division of Rolls-Royce
by: Cramp, Stephen Anthony
Published: (2013)
by: Cramp, Stephen Anthony
Published: (2013)
A Journey of Process Safety Management Program for Process Industry
by: Hanida, Abdul Aziz, et al.
Published: (2017)
by: Hanida, Abdul Aziz, et al.
Published: (2017)
The adoption of automation in Schenker Penang Logistics Centre 5 (plc5) warehouse: A case study
by: Chuah, Yu Ru, et al.
Published: (2023)
by: Chuah, Yu Ru, et al.
Published: (2023)
The Impact of Servitization on Supply Chain Management in Aero-Engine Industry: Analysis of Rolls Royce’s Case Study
by: Mahmood, Othman Kareem
Published: (2012)
by: Mahmood, Othman Kareem
Published: (2012)
The Impact of Servitization on Supply Chain Management in Aero-Engine Industry: Analysis of Rolls Royce’s Case Study
by: Mahmood, Othman Kareem
Published: (2012)
by: Mahmood, Othman Kareem
Published: (2012)
A Review of the Implementation of Lean – Comparative Case Studies and Lessons for the Rolls-Royce Manufacturing Value Chain
by: Palfreyman, Emma L
Published: (2011)
by: Palfreyman, Emma L
Published: (2011)
Implementation of automation controller using electro-pneumatic & PLC for food processing
by: Nasita, Ibrahim
Published: (2006)
by: Nasita, Ibrahim
Published: (2006)
Supply Chain Performance Evaluation: Evaluating Rolls-Royce Supply Chain Performance in the Civil Aerospace Business Operations.
by: Agbi, Raymond.O.
Published: (2010)
by: Agbi, Raymond.O.
Published: (2010)
A research about data-driven simulation approach for Rolls-Royce 150 seater engine supply chain
by: Shi, Shuaijie
Published: (2007)
by: Shi, Shuaijie
Published: (2007)
The excellent teacher educator professional journey
by: Hashim, Hashimah, et al.
Published: (2015)
by: Hashim, Hashimah, et al.
Published: (2015)
Key process areas (KPAs), key processes, and key pratices of enablers in osh management systems
by: Misnan, Mohd. Saidin, et al.
Published: (2006)
by: Misnan, Mohd. Saidin, et al.
Published: (2006)
The development of a heat assisted section rolling process for strip
by: Mohd Zaidi, Sidek
Published: (2013)
by: Mohd Zaidi, Sidek
Published: (2013)
Analysis of Future After-market Supply Chain of Rolls Royce Aircraft Engine (Trent 900) LRUs with Simulation Software Arena
by: Sharma, Anuj
Published: (2007)
by: Sharma, Anuj
Published: (2007)
Painter and place: Joseph Wright and Derby 1797-1886
by: Insley, Alice Amelia
Published: (2017)
by: Insley, Alice Amelia
Published: (2017)
DERBY: WA FOOTY FANS ON THE GAME'S GREATEST RIVALRY
by: Whish-Wilson, David, et al.
Published: (2017)
by: Whish-Wilson, David, et al.
Published: (2017)
Derby WA Footy Fans on the Game's Greatest Rivalry
by: Gorman, Sean, et al.
Published: (2017)
by: Gorman, Sean, et al.
Published: (2017)
Logistic regression for spatial Gibbs point processes
by: Baddeley, Adrian, et al.
Published: (2014)
by: Baddeley, Adrian, et al.
Published: (2014)
Security issues and quality of service in real time wireless PLC/SCADA process control systems
by: Eren, Halit, et al.
Published: (2008)
by: Eren, Halit, et al.
Published: (2008)
Connection siemens PLC (programmable logic control) to labview using OPC (ole for process control)
by: Mahfuzah, Mustafa
Published: (2004)
by: Mahfuzah, Mustafa
Published: (2004)
An ebsd study of nickel sheets after unidirectional and cross rolling arb processings
by: Duan, J., et al.
Published: (2015)
by: Duan, J., et al.
Published: (2015)
Similar Items
-
World Class Operations in Aftermarket Logistics at Rolls Royce Group Plc
by: Vaithiyanathan, Shivany, et al.
Published: (2005) -
An Analysis of Structuration Process for ERP
Use in Rolls Royce
by: Zhao, Xuefei
Published: (2006) -
Life extension of critical ‘Group A’ components with a view to implement robust process for protection of these components by introducing protective tooling & management of this tooling into the build process for Trent 900 engines at Rolls Royce Plc Derby’s civil aerospace operation
by: Sheth, Hemanshu
Published: (2010) -
Aero Repair and Overhaul Services at Rolls Royce Group Plc:
Application of Activity Based Costing
by: Vaithiyanathan, Shivany
Published: (2005) -
RISK MANAGEMENT OF WORLD CLASS OPERATIONS IN AFTERMARKET LOGISTICS AT ROLLS ROYCE
by: Leung, Lily
Published: (2005)