Improving production planning and scheduling processes at an Industrial/Agricultural Chain Manufacturer

A key question which every manufacturing firm, irrespective of its scale faces is about deriving an appropriate production planning and control mechanism that enables it to effectively cater to the market demand along with improving profitability. This project looks at applicability of Material Requ...

Full description

Bibliographic Details
Main Author: Tandon, Ramit
Format: Dissertation (University of Nottingham only)
Language:English
Published: 2008
Subjects:
Online Access:https://eprints.nottingham.ac.uk/22051/
_version_ 1848792348321906688
author Tandon, Ramit
author_facet Tandon, Ramit
author_sort Tandon, Ramit
building Nottingham Research Data Repository
collection Online Access
description A key question which every manufacturing firm, irrespective of its scale faces is about deriving an appropriate production planning and control mechanism that enables it to effectively cater to the market demand along with improving profitability. This project looks at applicability of Material Requirement Planning, Just in Time and Theory of Constraints as production planning and control mechanisms with a specific focus on applying them at Renold Chain Plant in Bredbuy, Stockport, Manchester. Renold������â����â�š���¢�����¢â�¬�¡��â�š�¢â�š�¬�����¢â�¬�¡��â�š�¢â�ž�¢s plant although maintaining its competitive advantage faces certain operational obstacles such as considerable order backlogs and high levels of work in progress. The adverse effect of these is further accentuated by a high degree of complexity in the production process and a huge variety of part numbers produced. Due to a combined effect of all these factors the desired levels of throughput are not achieved. To make the analysis systematic and as structured as possible, initially relevant people from all departments involved in production and order managing were interviewed. This gave various perspectives on the existing issues and possible suggestions. A conscious effort was made to connect all the different issues to identify a core problem area using TOC ������â����â�š���¢�����¢â�¬�¡��â�š�¢â�š�¬�����¢â�¬�¡��â�š����thinking process������â����â�š���¢�����¢â�¬�¡��â�š�¢â�š�¬�����¢â�¬�¡��â�š�¢â�ž�¢ tools. Following this, potential causes for this area������â����â�š���¢�����¢â�¬�¡��â�š�¢â�š�¬�����¢â�¬�¡��â�š�¢â�ž�¢s supposed ������â����â�š���¢�����¢â�¬�¡��â�š�¢â�š�¬�����¢â�¬�¡��â�š����under������â����â�š���¢�����¢â�¬�¡��â�š�¢â�š�¬�����¢â�¬�¡��â�š�¢â�ž�¢ performance have been identified using a fish bone analysis. Finally, connecting the findings with the relevant literature researched, two customised ������â����â�š���¢�����¢â�¬�¡��â�š�¢â�š�¬�����¢â�¬�¡��â�š����hybrid������â����â�š���¢�����¢â�¬�¡��â�š�¢â�š�¬�����¢â�¬�¡��â�š�¢â�ž�¢ production planning and control mechanism have been developed to enable Renold improve order management. These hybrids include appropriate aspects picked up from MRP, JIT and TOC. Furthermore, a series of prerequisite suggestions have been made which are required and would also compliment any change implementation brought about at the Bredbury Plant. The analysis was also presented to management at Bredbury in the form of a power point presentation and a brief feedback is given at the end.
first_indexed 2025-11-14T18:42:58Z
format Dissertation (University of Nottingham only)
id nottingham-22051
institution University of Nottingham Malaysia Campus
institution_category Local University
language English
last_indexed 2025-11-14T18:42:58Z
publishDate 2008
recordtype eprints
repository_type Digital Repository
spelling nottingham-220512018-02-16T18:57:33Z https://eprints.nottingham.ac.uk/22051/ Improving production planning and scheduling processes at an Industrial/Agricultural Chain Manufacturer Tandon, Ramit A key question which every manufacturing firm, irrespective of its scale faces is about deriving an appropriate production planning and control mechanism that enables it to effectively cater to the market demand along with improving profitability. This project looks at applicability of Material Requirement Planning, Just in Time and Theory of Constraints as production planning and control mechanisms with a specific focus on applying them at Renold Chain Plant in Bredbuy, Stockport, Manchester. Renold������â����â�š���¢�����¢â�¬�¡��â�š�¢â�š�¬�����¢â�¬�¡��â�š�¢â�ž�¢s plant although maintaining its competitive advantage faces certain operational obstacles such as considerable order backlogs and high levels of work in progress. The adverse effect of these is further accentuated by a high degree of complexity in the production process and a huge variety of part numbers produced. Due to a combined effect of all these factors the desired levels of throughput are not achieved. To make the analysis systematic and as structured as possible, initially relevant people from all departments involved in production and order managing were interviewed. This gave various perspectives on the existing issues and possible suggestions. A conscious effort was made to connect all the different issues to identify a core problem area using TOC ������â����â�š���¢�����¢â�¬�¡��â�š�¢â�š�¬�����¢â�¬�¡��â�š����thinking process������â����â�š���¢�����¢â�¬�¡��â�š�¢â�š�¬�����¢â�¬�¡��â�š�¢â�ž�¢ tools. Following this, potential causes for this area������â����â�š���¢�����¢â�¬�¡��â�š�¢â�š�¬�����¢â�¬�¡��â�š�¢â�ž�¢s supposed ������â����â�š���¢�����¢â�¬�¡��â�š�¢â�š�¬�����¢â�¬�¡��â�š����under������â����â�š���¢�����¢â�¬�¡��â�š�¢â�š�¬�����¢â�¬�¡��â�š�¢â�ž�¢ performance have been identified using a fish bone analysis. Finally, connecting the findings with the relevant literature researched, two customised ������â����â�š���¢�����¢â�¬�¡��â�š�¢â�š�¬�����¢â�¬�¡��â�š����hybrid������â����â�š���¢�����¢â�¬�¡��â�š�¢â�š�¬�����¢â�¬�¡��â�š�¢â�ž�¢ production planning and control mechanism have been developed to enable Renold improve order management. These hybrids include appropriate aspects picked up from MRP, JIT and TOC. Furthermore, a series of prerequisite suggestions have been made which are required and would also compliment any change implementation brought about at the Bredbury Plant. The analysis was also presented to management at Bredbury in the form of a power point presentation and a brief feedback is given at the end. 2008 Dissertation (University of Nottingham only) NonPeerReviewed application/pdf en https://eprints.nottingham.ac.uk/22051/1/08MSClixrt4.pdf Tandon, Ramit (2008) Improving production planning and scheduling processes at an Industrial/Agricultural Chain Manufacturer. [Dissertation (University of Nottingham only)] (Unpublished) production planning scheduling hybrid production control mechanisms theory of constraints just in time material requirements planning
spellingShingle production planning
scheduling
hybrid production control mechanisms
theory of constraints
just in time
material requirements planning
Tandon, Ramit
Improving production planning and scheduling processes at an Industrial/Agricultural Chain Manufacturer
title Improving production planning and scheduling processes at an Industrial/Agricultural Chain Manufacturer
title_full Improving production planning and scheduling processes at an Industrial/Agricultural Chain Manufacturer
title_fullStr Improving production planning and scheduling processes at an Industrial/Agricultural Chain Manufacturer
title_full_unstemmed Improving production planning and scheduling processes at an Industrial/Agricultural Chain Manufacturer
title_short Improving production planning and scheduling processes at an Industrial/Agricultural Chain Manufacturer
title_sort improving production planning and scheduling processes at an industrial/agricultural chain manufacturer
topic production planning
scheduling
hybrid production control mechanisms
theory of constraints
just in time
material requirements planning
url https://eprints.nottingham.ac.uk/22051/