A Case Study: Strategies For Reducing Production Cycle Time
On the primary motivations for semiconductor cycle time improvement is to improve customer satisfaction. Few key success indicators are identified such as WIP level strategies, adata analysis, new loading strategies for low volume products, on hold management and management commitment to achieve sho...
| Main Author: | |
|---|---|
| Format: | Thesis |
| Published: |
2009
|
| Subjects: | |
| Online Access: | http://shdl.mmu.edu.my/1523/ |
| _version_ | 1848789812772864000 |
|---|---|
| author | Tse, Ngu Ik |
| author_facet | Tse, Ngu Ik |
| author_sort | Tse, Ngu Ik |
| building | MMU Institutional Repository |
| collection | Online Access |
| description | On the primary motivations for semiconductor cycle time improvement is to improve customer satisfaction. Few key success indicators are identified such as WIP level strategies, adata analysis, new loading strategies for low volume products, on hold management and management commitment to achieve shorter cycle time. |
| first_indexed | 2025-11-14T18:02:40Z |
| format | Thesis |
| id | mmu-1523 |
| institution | Multimedia University |
| institution_category | Local University |
| last_indexed | 2025-11-14T18:02:40Z |
| publishDate | 2009 |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | mmu-15232010-10-05T02:51:41Z http://shdl.mmu.edu.my/1523/ A Case Study: Strategies For Reducing Production Cycle Time Tse, Ngu Ik TS Manufactures On the primary motivations for semiconductor cycle time improvement is to improve customer satisfaction. Few key success indicators are identified such as WIP level strategies, adata analysis, new loading strategies for low volume products, on hold management and management commitment to achieve shorter cycle time. 2009-04 Thesis NonPeerReviewed Tse, Ngu Ik (2009) A Case Study: Strategies For Reducing Production Cycle Time. Masters thesis, Multimedia University. http://vlib.mmu.edu.my/diglib/login/dlusr/login.php |
| spellingShingle | TS Manufactures Tse, Ngu Ik A Case Study: Strategies For Reducing Production Cycle Time |
| title | A Case Study: Strategies For Reducing Production Cycle Time |
| title_full | A Case Study: Strategies For Reducing Production Cycle Time |
| title_fullStr | A Case Study: Strategies For Reducing Production Cycle Time |
| title_full_unstemmed | A Case Study: Strategies For Reducing Production Cycle Time |
| title_short | A Case Study: Strategies For Reducing Production Cycle Time |
| title_sort | case study: strategies for reducing production cycle time |
| topic | TS Manufactures |
| url | http://shdl.mmu.edu.my/1523/ http://shdl.mmu.edu.my/1523/ |