T.J., D., & Ponniah, V. (2017). Analysis of delays in Tanzanian construction industry: Transaction cost economics (TCE) and structural equation modeling (SEM) approach. Emerald Publishing Limited.
Chicago Style (17th ed.) CitationT.J., Deepak, and Venishri Ponniah. Analysis of Delays in Tanzanian Construction Industry: Transaction Cost Economics (TCE) and Structural Equation Modeling (SEM) Approach. Emerald Publishing Limited, 2017.
MLA (9th ed.) CitationT.J., Deepak, and Venishri Ponniah. Analysis of Delays in Tanzanian Construction Industry: Transaction Cost Economics (TCE) and Structural Equation Modeling (SEM) Approach. Emerald Publishing Limited, 2017.
Warning: These citations may not always be 100% accurate.