Developing a Car Park with Introducing Interlocking Concrete Block at INTI International University

This project is mainly about developing car park with introducing interlocking concrete block at INTI international university. The purpose of my project is to create a greener environment around campus. The work has been done with collecting some literature view based on topic. In this project ther...

Full description

Bibliographic Details
Main Author: G., Ravinthiran
Format: Thesis
Language:English
Published: 2015
Subjects:
Online Access:http://eprints.intimal.edu.my/465/
http://eprints.intimal.edu.my/465/1/DCE%20-%20156.pdf
_version_ 1848766483883098112
author G., Ravinthiran
author_facet G., Ravinthiran
author_sort G., Ravinthiran
building INTI Institutional Repository
collection Online Access
description This project is mainly about developing car park with introducing interlocking concrete block at INTI international university. The purpose of my project is to create a greener environment around campus. The work has been done with collecting some literature view based on topic. In this project there are few section been divided: The first section is introduction where introduces briefly about interlocking concrete block as well as the purpose and objective of this project. The second section is about advantages and the limitation of interlocking concrete block consists of studies about concrete blocks. The next section will shows about the types of interlocking concrete block and characteristics of interlocking concrete block and physical requirements. A survey form has been created to investigate the perception of the road users towards the use of interlocking concrete block around campus. The fourth, which is the most important section of this project, is developing car park with introducing interlocking concrete block. After all the researches and studies, this section will show the methods and techniques how to develop car park with interlocking concrete block. A calculation of the number of concrete block needed. With collected data, the estimation of the paving cost being calculated. The car park area was calculated using the JKR method which follows the specific standard measurements of Malaysia. The fifth section is conclusion where concludes the report with the final information and results obtained. The last section is references which show all the books and website links used as references to study and researches for my project.
first_indexed 2025-11-14T11:51:52Z
format Thesis
id intimal-465
institution INTI International University
institution_category Local University
language English
last_indexed 2025-11-14T11:51:52Z
publishDate 2015
recordtype eprints
repository_type Digital Repository
spelling intimal-4652016-08-05T05:32:52Z http://eprints.intimal.edu.my/465/ Developing a Car Park with Introducing Interlocking Concrete Block at INTI International University G., Ravinthiran TA Engineering (General). Civil engineering (General) This project is mainly about developing car park with introducing interlocking concrete block at INTI international university. The purpose of my project is to create a greener environment around campus. The work has been done with collecting some literature view based on topic. In this project there are few section been divided: The first section is introduction where introduces briefly about interlocking concrete block as well as the purpose and objective of this project. The second section is about advantages and the limitation of interlocking concrete block consists of studies about concrete blocks. The next section will shows about the types of interlocking concrete block and characteristics of interlocking concrete block and physical requirements. A survey form has been created to investigate the perception of the road users towards the use of interlocking concrete block around campus. The fourth, which is the most important section of this project, is developing car park with introducing interlocking concrete block. After all the researches and studies, this section will show the methods and techniques how to develop car park with interlocking concrete block. A calculation of the number of concrete block needed. With collected data, the estimation of the paving cost being calculated. The car park area was calculated using the JKR method which follows the specific standard measurements of Malaysia. The fifth section is conclusion where concludes the report with the final information and results obtained. The last section is references which show all the books and website links used as references to study and researches for my project. 2015 Thesis NonPeerReviewed text en http://eprints.intimal.edu.my/465/1/DCE%20-%20156.pdf G., Ravinthiran (2015) Developing a Car Park with Introducing Interlocking Concrete Block at INTI International University. Diploma thesis, INTI International University.
spellingShingle TA Engineering (General). Civil engineering (General)
G., Ravinthiran
Developing a Car Park with Introducing Interlocking Concrete Block at INTI International University
title Developing a Car Park with Introducing Interlocking Concrete Block at INTI International University
title_full Developing a Car Park with Introducing Interlocking Concrete Block at INTI International University
title_fullStr Developing a Car Park with Introducing Interlocking Concrete Block at INTI International University
title_full_unstemmed Developing a Car Park with Introducing Interlocking Concrete Block at INTI International University
title_short Developing a Car Park with Introducing Interlocking Concrete Block at INTI International University
title_sort developing a car park with introducing interlocking concrete block at inti international university
topic TA Engineering (General). Civil engineering (General)
url http://eprints.intimal.edu.my/465/
http://eprints.intimal.edu.my/465/1/DCE%20-%20156.pdf