Financial Barriers in Achieving CIDB IBS Roadmap in Malaysia Private Sector Construction Industry

Industrialized Building System (IBS) was introduced by the Malaysia government at first was to provide affordable housing for the populace. At the later period, this construction method is encouraged by the government to the construction industry to solve the issues which the industry is facing now....

Full description

Bibliographic Details
Main Author: Lim, Desmond Eng Hong
Format: Thesis
Language:English
Published: 2015
Subjects:
Online Access:http://eprints.intimal.edu.my/456/
http://eprints.intimal.edu.my/456/1/BQSI%20-%2055.pdf
_version_ 1848766481746100224
author Lim, Desmond Eng Hong
author_facet Lim, Desmond Eng Hong
author_sort Lim, Desmond Eng Hong
building INTI Institutional Repository
collection Online Access
description Industrialized Building System (IBS) was introduced by the Malaysia government at first was to provide affordable housing for the populace. At the later period, this construction method is encouraged by the government to the construction industry to solve the issues which the industry is facing now. This construction method has been implemented successfully in other countries most notably Japan and Singapore but over the years the implementation of IBS is still low in our country particularly the private construction industry. It is found out that financial issue is the main towards implementation of IBS. This research is to find out the financial barrier which causing the private sector from implementing IBS and achieving CIDB IRS Roadmap goal. Recommendations are also identified to tackle this issue and hence providing CLDB idea or ways to address this issue. Data and information obtained from questionnaire survey are analyzed using frequency distribution analysis method. From the findings, it is found out that financial issue is indeed a critical barrier towards implementation of IBS in achieving IBS Roadmap and CIDB is required to prioritize and focus on addressing this issue.
first_indexed 2025-11-14T11:51:50Z
format Thesis
id intimal-456
institution INTI International University
institution_category Local University
language English
last_indexed 2025-11-14T11:51:50Z
publishDate 2015
recordtype eprints
repository_type Digital Repository
spelling intimal-4562016-08-04T07:20:01Z http://eprints.intimal.edu.my/456/ Financial Barriers in Achieving CIDB IBS Roadmap in Malaysia Private Sector Construction Industry Lim, Desmond Eng Hong TA Engineering (General). Civil engineering (General) Industrialized Building System (IBS) was introduced by the Malaysia government at first was to provide affordable housing for the populace. At the later period, this construction method is encouraged by the government to the construction industry to solve the issues which the industry is facing now. This construction method has been implemented successfully in other countries most notably Japan and Singapore but over the years the implementation of IBS is still low in our country particularly the private construction industry. It is found out that financial issue is the main towards implementation of IBS. This research is to find out the financial barrier which causing the private sector from implementing IBS and achieving CIDB IRS Roadmap goal. Recommendations are also identified to tackle this issue and hence providing CLDB idea or ways to address this issue. Data and information obtained from questionnaire survey are analyzed using frequency distribution analysis method. From the findings, it is found out that financial issue is indeed a critical barrier towards implementation of IBS in achieving IBS Roadmap and CIDB is required to prioritize and focus on addressing this issue. 2015 Thesis NonPeerReviewed text en http://eprints.intimal.edu.my/456/1/BQSI%20-%2055.pdf Lim, Desmond Eng Hong (2015) Financial Barriers in Achieving CIDB IBS Roadmap in Malaysia Private Sector Construction Industry. Other thesis, INTI International University.
spellingShingle TA Engineering (General). Civil engineering (General)
Lim, Desmond Eng Hong
Financial Barriers in Achieving CIDB IBS Roadmap in Malaysia Private Sector Construction Industry
title Financial Barriers in Achieving CIDB IBS Roadmap in Malaysia Private Sector Construction Industry
title_full Financial Barriers in Achieving CIDB IBS Roadmap in Malaysia Private Sector Construction Industry
title_fullStr Financial Barriers in Achieving CIDB IBS Roadmap in Malaysia Private Sector Construction Industry
title_full_unstemmed Financial Barriers in Achieving CIDB IBS Roadmap in Malaysia Private Sector Construction Industry
title_short Financial Barriers in Achieving CIDB IBS Roadmap in Malaysia Private Sector Construction Industry
title_sort financial barriers in achieving cidb ibs roadmap in malaysia private sector construction industry
topic TA Engineering (General). Civil engineering (General)
url http://eprints.intimal.edu.my/456/
http://eprints.intimal.edu.my/456/1/BQSI%20-%2055.pdf