Study of the Success Criteria for Quantity Surveying Firms in Selangor
Quantity surveyor ¡s one of the important parties in construction industry. As Malaysia is a developing Country, more construction projects are being carried out for the development, which causes the demand for quantity surveying firm increases. Thus, number of quantity surveying firms in Selangor i...
| Main Author: | Lim, Hui Lin |
|---|---|
| Format: | Thesis |
| Language: | English |
| Published: |
2015
|
| Subjects: | |
| Online Access: | http://eprints.intimal.edu.my/453/ http://eprints.intimal.edu.my/453/1/BQSI%20-%2052.pdf |
Similar Items
The application of measurement software by quantity surveying firms in Klang Valley
by: Nik Fatma Arisya, Nik Yahya, et al.
Published: (2018)
by: Nik Fatma Arisya, Nik Yahya, et al.
Published: (2018)
Expectation of Employers towards Quantity Surveying Students
by: Tan, Elaine Siew Ting
Published: (2015)
by: Tan, Elaine Siew Ting
Published: (2015)
The services required by the Malaysian construction industry from quantity surveyors and their implications to quantity surveying graduates
by: Chong, Bee Ling
Published: (2014)
by: Chong, Bee Ling
Published: (2014)
Quantity Surveying Profession in Indonesia Construction Industry
by: Muhammad, Fakhri
Published: (2020)
by: Muhammad, Fakhri
Published: (2020)
The Barriers of Implementing E-Tendering System By Quantity Surveyors in Selangor
by: Chong, Won Jiun
Published: (2016)
by: Chong, Won Jiun
Published: (2016)
The Incorporation Of It System Of Quantity Surveying Profession
by: Yap, Hao Ying
Published: (2014)
by: Yap, Hao Ying
Published: (2014)
Embedding Building Information Modeling (Bim) Competencies in Quantity Surveying Education
by: Kwong, Chin Wei
Published: (2019)
by: Kwong, Chin Wei
Published: (2019)
Rethinking construction: inclusion of slow learners as taker-off in quantity surveying practice
by: Masidah, Abdul Majid, et al.
Published: (2017)
by: Masidah, Abdul Majid, et al.
Published: (2017)
Professional Negligence by Quantity Surveyors
by: Tan, Chai San
Published: (2015)
by: Tan, Chai San
Published: (2015)
A Study on Barriers and Challenges to Value Management Implementation by QS Firms in Selangor
by: Thien, Yung Wei
Published: (2015)
by: Thien, Yung Wei
Published: (2015)
A Study on Barriers and Challenges to Value Management Implementation by Qs Firms in Selangor
by: Thien, Yung Wei, et al.
Published: (2016)
by: Thien, Yung Wei, et al.
Published: (2016)
The Application of Software’s in Cost Estimation for Quantity Surveyor
by: Ting, How Ann, et al.
Published: (2016)
by: Ting, How Ann, et al.
Published: (2016)
Quality management in Quantity Surveying firms
by: Tan, Chin Keng, et al.
Published: (2016)
by: Tan, Chin Keng, et al.
Published: (2016)
The Impact of Work Related Stress onto Quantity Surveyors’ Work Productivity in the Consultancy Firms in Klang Valley, Malaysia
by: Hurgobin, Jenita Devi, et al.
Published: (2016)
by: Hurgobin, Jenita Devi, et al.
Published: (2016)
Research in quantity surveying
by: Tan, Chin Keng
Published: (2013)
by: Tan, Chin Keng
Published: (2013)
Experienced Quantity Surveyor’s Perception of Employability Skills Required by Malaysian Fresh Graduate Quantity Surveyor
by: Chai, Wai Kuan
Published: (2017)
by: Chai, Wai Kuan
Published: (2017)
Adaptation Of Building Information Modeling Among Quantity Surveyor Practitioners in Malaysia
by: Loo, Pei Yi
Published: (2013)
by: Loo, Pei Yi
Published: (2013)
Application of Theory of Constraints in quantity surveying firm
by: Norhanim Zakaria,, et al.
Published: (2020)
by: Norhanim Zakaria,, et al.
Published: (2020)
Employee Turnover of Quantity Surveying Firms in Malaysia
by: Habizah Sheikh Ilmi,, et al.
by: Habizah Sheikh Ilmi,, et al.
Triggering the internationalization of Malaysian quantity surveying firms
by: Wang, C., et al.
Published: (2016)
by: Wang, C., et al.
Published: (2016)
Water Quantity And Quality Assessments Of Stormwater Purification In Bioecods
by: Beh , Chun How
Published: (2014)
by: Beh , Chun How
Published: (2014)
A study on the practice of staff training in quantity surveying firms
by: Roslan, Huda, et al.
Published: (2011)
by: Roslan, Huda, et al.
Published: (2011)
Determination of earthquake design criteria for fixed offshore platform (four-legged) due to Aceh earthquake in Malaysia
by: Lim, Jia Jun
Published: (2015)
by: Lim, Jia Jun
Published: (2015)
The comprehensive study of product criteria on infant-wrap (InfaWrap) device: engineering perspective
by: Mohd Hanafi, Abdul Rahim, et al.
Published: (2020)
by: Mohd Hanafi, Abdul Rahim, et al.
Published: (2020)
Best project management practice to attain project success, based on the success criteria
by: Chaher, Zid Chaher, et al.
Published: (2017)
by: Chaher, Zid Chaher, et al.
Published: (2017)
The application of green roof for stormwater quantity and quality improvement
by: Noor Suraya, Romali, et al.
Published: (2021)
by: Noor Suraya, Romali, et al.
Published: (2021)
A study on the use of measurement software in the preparation of bills of quantities among Malaysian quantity surveying firms
by: Tan, Chin Keng, et al.
Published: (2011)
by: Tan, Chin Keng, et al.
Published: (2011)
Strategies of quantity surveying firms to reduce turnover intention
by: Tan, Chin Keng, et al.
Published: (2019)
by: Tan, Chin Keng, et al.
Published: (2019)
Competitive Strategy And Performance Of Quantity Surveying Firms
In Malaysia
by: Abidin, Nazirah Zainul, et al.
Published: (2014)
by: Abidin, Nazirah Zainul, et al.
Published: (2014)
Dry machining and minimum quantity lubricant of aluminum alloy 6061-t6 using coated carbide tools
by: Nur Amirra, Rashid
Published: (2013)
by: Nur Amirra, Rashid
Published: (2013)
A Review on the Self-Cleansing Design Criteria for Sewer System
by: Bong, C.H.J
Published: (2014)
by: Bong, C.H.J
Published: (2014)
Key assessment criteria for organizational bim capabilities : A cross-regional study
by: Rajabi, Mohammad Sadra, et al.
Published: (2022)
by: Rajabi, Mohammad Sadra, et al.
Published: (2022)
BIM and Future of Quantity Surveyors in Malaysia’s Construction Industry
by: Chan, Wai Bin, et al.
Published: (2020)
by: Chan, Wai Bin, et al.
Published: (2020)
Criteria of acceptance for constant rate of strain consolidation test for cohesive soil
by: Lam, Chee Siang
Published: (2006)
by: Lam, Chee Siang
Published: (2006)
Optimal distribution of best management practices (BMPS) for urban stormwater runoff quantity and quality control / Abdul Razaq Rezaei
by: Abdul Razaq , Rezaei
Published: (2020)
by: Abdul Razaq , Rezaei
Published: (2020)
Determination of earthquake design criteria for fixed offshore structures located in Malaysia region
by: Lai, Tze Khai
Published: (2007)
by: Lai, Tze Khai
Published: (2007)
Measurement of lubricant oil film thickness under minimum quantity lubrication milling process
by: Nur Elya Haniza, Zamiruddin
Published: (2022)
by: Nur Elya Haniza, Zamiruddin
Published: (2022)
The Effectiveness Of On-Site Detention For Water Quantity Control In Taman Ilmu Using Stormwater Management Model (SWMM)
by: Tan, Zi Guan
Published: (2018)
by: Tan, Zi Guan
Published: (2018)
Investigation of Flow Behavior in Minimum Quantity Lubrication Nozzle for End Milling Processes
by: Najiha, M. S., et al.
Published: (2012)
by: Najiha, M. S., et al.
Published: (2012)
Adaption of Building Information Modeling Among Quantity Surveyor Practitioners In Malaysia
by: Loo, Pei Yi
Published: (2013)
by: Loo, Pei Yi
Published: (2013)
Similar Items
-
The application of measurement software by quantity surveying firms in Klang Valley
by: Nik Fatma Arisya, Nik Yahya, et al.
Published: (2018) -
Expectation of Employers towards Quantity Surveying Students
by: Tan, Elaine Siew Ting
Published: (2015) -
The services required by the Malaysian construction industry from quantity surveyors and their implications to quantity surveying graduates
by: Chong, Bee Ling
Published: (2014) -
Quantity Surveying Profession in Indonesia Construction Industry
by: Muhammad, Fakhri
Published: (2020) -
The Barriers of Implementing E-Tendering System By Quantity Surveyors in Selangor
by: Chong, Won Jiun
Published: (2016)