APA (7th ed.) Citation

Ooi, J. D. (2015). CVR or EVA: Which one is more Effective to Control Cost in Construction Project.

Chicago Style (17th ed.) Citation

Ooi, Jia Ding. CVR or EVA: Which One Is More Effective to Control Cost in Construction Project. 2015.

MLA (9th ed.) Citation

Ooi, Jia Ding. CVR or EVA: Which One Is More Effective to Control Cost in Construction Project. 2015.

Warning: These citations may not always be 100% accurate.