Feasibility study of using heat recovery devices in HVAC systems in a building in the tropics

For non-domestic buildings, the electricity consumption mostly comes from the usage of the air-conditioning system. Therefore, energy savings must be achieved to save cost, and hence there is a need to apply heat recovery technologies such as run-around coils, plate-to-plate heat exchangers, heat...

Full description

Bibliographic Details
Main Authors: Yau, Y.H., Chuah, K.H., Tey, M.R., Yip, P.N., Lim, C.S., Chong, T.H., Rajagopal, K.
Format: Conference or Workshop Item
Language:English
Published: 2014
Subjects:
Online Access:http://eprints.intimal.edu.my/43/
http://eprints.intimal.edu.my/43/1/Feasibility%20study%20of%20using%20heat%20recovery%20devices%20in%20HVAC%20systems%20in%20a%20building%20in%20the%20tropics.pdf
_version_ 1848766383388622848
author Yau, Y.H.
Chuah, K.H.
Tey, M.R.
Yip, P.N.
Lim, C.S.
Chong, T.H.
Rajagopal, K.
author_facet Yau, Y.H.
Chuah, K.H.
Tey, M.R.
Yip, P.N.
Lim, C.S.
Chong, T.H.
Rajagopal, K.
author_sort Yau, Y.H.
building INTI Institutional Repository
collection Online Access
description For non-domestic buildings, the electricity consumption mostly comes from the usage of the air-conditioning system. Therefore, energy savings must be achieved to save cost, and hence there is a need to apply heat recovery technologies such as run-around coils, plate-to-plate heat exchangers, heat pipe heat exchangers and heat recovery wheels into the air conditioning and mechanical ventilation (ACMV) systems for these buildings. The examples of nondomestics buildings such as factories, hospitals and office buildings use more energy to supply fresh air into the space in comparison to residential buildings. According to Yau (2010), the changing of air must be at least 15 times hourly, and in certain cases such as the hospital, the prohibition of recirculation of the return air in operating theatres to ensure the air is clean from any virus or bacteria from the outdoor air is needed. The feasibility study on using heat recovery devices in a new medium-size building in University of Malaya was conducted. The potential of energy savings in the building was examined by studying the performance of the air-conditioning system. The heat recovery systems were analyzed, and the focus was on the energy savings of the HVAC system. The calculation of energy savings and payback periods were analyzed for the chosen heat recovery devices installed in the building. Based on the results obtained in this practical study, it is strongly recommended that heat recovery systems to be installed to reduce energy usages of air-conditioning systems operating in large buildings in the tropics
first_indexed 2025-11-14T11:50:16Z
format Conference or Workshop Item
id intimal-43
institution INTI International University
institution_category Local University
language English
last_indexed 2025-11-14T11:50:16Z
publishDate 2014
recordtype eprints
repository_type Digital Repository
spelling intimal-432016-10-06T03:08:25Z http://eprints.intimal.edu.my/43/ Feasibility study of using heat recovery devices in HVAC systems in a building in the tropics Yau, Y.H. Chuah, K.H. Tey, M.R. Yip, P.N. Lim, C.S. Chong, T.H. Rajagopal, K. TJ Mechanical engineering and machinery For non-domestic buildings, the electricity consumption mostly comes from the usage of the air-conditioning system. Therefore, energy savings must be achieved to save cost, and hence there is a need to apply heat recovery technologies such as run-around coils, plate-to-plate heat exchangers, heat pipe heat exchangers and heat recovery wheels into the air conditioning and mechanical ventilation (ACMV) systems for these buildings. The examples of nondomestics buildings such as factories, hospitals and office buildings use more energy to supply fresh air into the space in comparison to residential buildings. According to Yau (2010), the changing of air must be at least 15 times hourly, and in certain cases such as the hospital, the prohibition of recirculation of the return air in operating theatres to ensure the air is clean from any virus or bacteria from the outdoor air is needed. The feasibility study on using heat recovery devices in a new medium-size building in University of Malaya was conducted. The potential of energy savings in the building was examined by studying the performance of the air-conditioning system. The heat recovery systems were analyzed, and the focus was on the energy savings of the HVAC system. The calculation of energy savings and payback periods were analyzed for the chosen heat recovery devices installed in the building. Based on the results obtained in this practical study, it is strongly recommended that heat recovery systems to be installed to reduce energy usages of air-conditioning systems operating in large buildings in the tropics 2014 Conference or Workshop Item PeerReviewed text en http://eprints.intimal.edu.my/43/1/Feasibility%20study%20of%20using%20heat%20recovery%20devices%20in%20HVAC%20systems%20in%20a%20building%20in%20the%20tropics.pdf Yau, Y.H. and Chuah, K.H. and Tey, M.R. and Yip, P.N. and Lim, C.S. and Chong, T.H. and Rajagopal, K. (2014) Feasibility study of using heat recovery devices in HVAC systems in a building in the tropics. In: Indoor Air 2014 - 13th International Conference on Indoor Air Quality and Climate, 7 - 12 July 2014, The Grand Hall, The University of Hong Kong.
spellingShingle TJ Mechanical engineering and machinery
Yau, Y.H.
Chuah, K.H.
Tey, M.R.
Yip, P.N.
Lim, C.S.
Chong, T.H.
Rajagopal, K.
Feasibility study of using heat recovery devices in HVAC systems in a building in the tropics
title Feasibility study of using heat recovery devices in HVAC systems in a building in the tropics
title_full Feasibility study of using heat recovery devices in HVAC systems in a building in the tropics
title_fullStr Feasibility study of using heat recovery devices in HVAC systems in a building in the tropics
title_full_unstemmed Feasibility study of using heat recovery devices in HVAC systems in a building in the tropics
title_short Feasibility study of using heat recovery devices in HVAC systems in a building in the tropics
title_sort feasibility study of using heat recovery devices in hvac systems in a building in the tropics
topic TJ Mechanical engineering and machinery
url http://eprints.intimal.edu.my/43/
http://eprints.intimal.edu.my/43/1/Feasibility%20study%20of%20using%20heat%20recovery%20devices%20in%20HVAC%20systems%20in%20a%20building%20in%20the%20tropics.pdf