Mitigating Delay Impacts in Construction Projects: An Evaluation of Causes and Strategies

Construction plays a crucial role in driving national economic growth for sustainable development. Nonetheless, delays in many building projects emerged due to various challenges. Identifying and addressing these delays proved essential for ensuring project success. Timely completion stood as a k...

Full description

Bibliographic Details
Main Authors: Ijaz, Ahmad, Syed, Saad, Syed Nouman, Shah, Muhammad, Bilal, Fabiha Fatima, Agha, Sumayya, Obaid
Format: Article
Language:English
English
Published: INTI International University 2024
Subjects:
Online Access:http://eprints.intimal.edu.my/2096/
http://eprints.intimal.edu.my/2096/2/635
http://eprints.intimal.edu.my/2096/3/ij2024_49r.pdf
_version_ 1848766919022215168
author Ijaz, Ahmad
Syed, Saad
Syed Nouman, Shah
Muhammad, Bilal
Fabiha Fatima, Agha
Sumayya, Obaid
author_facet Ijaz, Ahmad
Syed, Saad
Syed Nouman, Shah
Muhammad, Bilal
Fabiha Fatima, Agha
Sumayya, Obaid
author_sort Ijaz, Ahmad
building INTI Institutional Repository
collection Online Access
description Construction plays a crucial role in driving national economic growth for sustainable development. Nonetheless, delays in many building projects emerged due to various challenges. Identifying and addressing these delays proved essential for ensuring project success. Timely completion stood as a key indicator of project success, whereas delays could result in increased costs and disputes among stakeholders. This study aimed to explore the causes of delays in construction projects and their remedial measures. Specifically, the research investigated delay factors in construction projects across Khyber Pakhtunkhwa, including the Machai Hydro Power Project in Mardan, the Golen Gol Hydro Power Project in Chitral, the KOTO Hydro Power Project in Lower Dir, and the rehabilitation of the Peshawar to Dara Adam Khel carriageway. Data was collected through Google Forms, with participants providing valuable responses. The analysis was conducted using IBM SPSS. Results indicated that land acquisition, client issues, consultant problems, general factors, and budget conflicts had the most significant impact on delays. This study offered important insights into the construction industry, highlighting strategies to mitigate these issues and improve project efficiency.
first_indexed 2025-11-14T11:58:47Z
format Article
id intimal-2096
institution INTI International University
institution_category Local University
language English
English
last_indexed 2025-11-14T11:58:47Z
publishDate 2024
publisher INTI International University
recordtype eprints
repository_type Digital Repository
spelling intimal-20962025-07-12T07:34:05Z http://eprints.intimal.edu.my/2096/ Mitigating Delay Impacts in Construction Projects: An Evaluation of Causes and Strategies Ijaz, Ahmad Syed, Saad Syed Nouman, Shah Muhammad, Bilal Fabiha Fatima, Agha Sumayya, Obaid T Technology (General) TA Engineering (General). Civil engineering (General) TC Hydraulic engineering. Ocean engineering TH Building construction Construction plays a crucial role in driving national economic growth for sustainable development. Nonetheless, delays in many building projects emerged due to various challenges. Identifying and addressing these delays proved essential for ensuring project success. Timely completion stood as a key indicator of project success, whereas delays could result in increased costs and disputes among stakeholders. This study aimed to explore the causes of delays in construction projects and their remedial measures. Specifically, the research investigated delay factors in construction projects across Khyber Pakhtunkhwa, including the Machai Hydro Power Project in Mardan, the Golen Gol Hydro Power Project in Chitral, the KOTO Hydro Power Project in Lower Dir, and the rehabilitation of the Peshawar to Dara Adam Khel carriageway. Data was collected through Google Forms, with participants providing valuable responses. The analysis was conducted using IBM SPSS. Results indicated that land acquisition, client issues, consultant problems, general factors, and budget conflicts had the most significant impact on delays. This study offered important insights into the construction industry, highlighting strategies to mitigate these issues and improve project efficiency. INTI International University 2024-12 Article PeerReviewed text en cc_by_4 http://eprints.intimal.edu.my/2096/2/635 text en cc_by_4 http://eprints.intimal.edu.my/2096/3/ij2024_49r.pdf Ijaz, Ahmad and Syed, Saad and Syed Nouman, Shah and Muhammad, Bilal and Fabiha Fatima, Agha and Sumayya, Obaid (2024) Mitigating Delay Impacts in Construction Projects: An Evaluation of Causes and Strategies. INTI JOURNAL, 2024 (49). pp. 1-7. ISSN e2600-7320 https://intijournal.intimal.edu.my
spellingShingle T Technology (General)
TA Engineering (General). Civil engineering (General)
TC Hydraulic engineering. Ocean engineering
TH Building construction
Ijaz, Ahmad
Syed, Saad
Syed Nouman, Shah
Muhammad, Bilal
Fabiha Fatima, Agha
Sumayya, Obaid
Mitigating Delay Impacts in Construction Projects: An Evaluation of Causes and Strategies
title Mitigating Delay Impacts in Construction Projects: An Evaluation of Causes and Strategies
title_full Mitigating Delay Impacts in Construction Projects: An Evaluation of Causes and Strategies
title_fullStr Mitigating Delay Impacts in Construction Projects: An Evaluation of Causes and Strategies
title_full_unstemmed Mitigating Delay Impacts in Construction Projects: An Evaluation of Causes and Strategies
title_short Mitigating Delay Impacts in Construction Projects: An Evaluation of Causes and Strategies
title_sort mitigating delay impacts in construction projects: an evaluation of causes and strategies
topic T Technology (General)
TA Engineering (General). Civil engineering (General)
TC Hydraulic engineering. Ocean engineering
TH Building construction
url http://eprints.intimal.edu.my/2096/
http://eprints.intimal.edu.my/2096/
http://eprints.intimal.edu.my/2096/2/635
http://eprints.intimal.edu.my/2096/3/ij2024_49r.pdf