Cost issue: Key limiting factor that affects IBS application in Malaysian construction industry
In order to achieve the target of being a developing nation in Year 2020, Malaysian government has been investing its efforts in driving the nation to optimize the utility of new, modern and innovative construction methods, including Industrial Building System (IBS), however there are still a number...
| Main Authors: | Wong, Amy, Zhi Lin, Chan, Siew Chong |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
INTI International University
2018
|
| Subjects: | |
| Online Access: | http://eprints.intimal.edu.my/1335/ http://eprints.intimal.edu.my/1335/1/vol2_2018_3.pdf |
Similar Items
Financial barriers in achieving CIDB IBS Roadmap in Malaysia private sector construction industry
by: Lim, Desmond Eng Hong, et al.
Published: (2018)
by: Lim, Desmond Eng Hong, et al.
Published: (2018)
Compatibility issues of Industrialized Building System (IBS) in interior construction: a case study in Kuala Lumpur
by: Yaman, Rostam, et al.
Published: (2019)
by: Yaman, Rostam, et al.
Published: (2019)
Factors affecting speed of industrialized building system (IBS) projects in Malaysia
by: Alaghbari, Wa’el, et al.
Published: (2008)
by: Alaghbari, Wa’el, et al.
Published: (2008)
Impact of cost overrun factors on the project delay in construction industry, Pahang, Malaysia
by: Zhi Jia, Ling
Published: (2014)
by: Zhi Jia, Ling
Published: (2014)
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013)
by: Zulkarnain, Muhamad
Published: (2013)
Industrialized building system (IBS) : the problems and strategies to increase the adoption of IBS in Malaysian private sector
by: Norsyazwani, Masri
Published: (2019)
by: Norsyazwani, Masri
Published: (2019)
Effectiveness of industrialised building system (IBS) implementation for Malaysian Construction Industry
by: Zawawi, Mardhiah
Published: (2009)
by: Zawawi, Mardhiah
Published: (2009)
Construction quality of school buildings using the Industrialised Building System (IBS)
by: Ali, Maisarah, et al.
Published: (2012)
by: Ali, Maisarah, et al.
Published: (2012)
A Potential Study of Automation System in Industrialised Building System (IBS) in Enhancing Malaysian Construction Industry’s Performance
by: Siti Azira, Abd Rahim*, et al.
Published: (2020)
by: Siti Azira, Abd Rahim*, et al.
Published: (2020)
Safety aspect in installation industrialized building system (IBS) component
by: Noor Yuhana, Maamor
Published: (2009)
by: Noor Yuhana, Maamor
Published: (2009)
A study on factors affecting the implementation of industrialized building system (IBS) on high-rise construction in developing regions of Malaysia
by: Lim, Chun Fee, et al.
Published: (2018)
by: Lim, Chun Fee, et al.
Published: (2018)
Critical success factors and barriers for industrialised building system (IBS) adoption in construction project
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)
by: Suhaida Noorein, Iskandar Mirza
Published: (2010)
Industrialised Building Systems (IBS) in Malaysian construction industry / Dr Hjh Hamimah Adnan and Nor Azmi Ahmad Bari
by: Adnan, Hamimah, et al.
Published: (2007)
by: Adnan, Hamimah, et al.
Published: (2007)
Impact of the cost overrun factors on the project delays in construction industry
by: Noor Elinah, Sailin
Published: (2018)
by: Noor Elinah, Sailin
Published: (2018)
Modeling the factors causing cost overrun in UAE construction industry
by: Ahmed Marey Alhammadi, Ahmed Salem
Published: (2022)
by: Ahmed Marey Alhammadi, Ahmed Salem
Published: (2022)
Issues regarding the Malaysian construction industry
by: Hasan, Hamzah
Published: (2008)
by: Hasan, Hamzah
Published: (2008)
Explore the Causes and Issues of Unethical Behaviour in The Malaysian Construction Industry
by: Yap, Li Jun
Published: (2019)
by: Yap, Li Jun
Published: (2019)
Bim: the setback or solution to project cost issues in Malaysia construction industry?
by: Ang, P S E, et al.
Published: (2020)
by: Ang, P S E, et al.
Published: (2020)
Factors Affecting the Selection of the Procurement Methods for Construction Projects in Malaysia
by: Yap, Zhi Shan, et al.
Published: (2019)
by: Yap, Zhi Shan, et al.
Published: (2019)
Factors impeding the industrialized building system (IBS) implementation of building construction in Malaysia
by: Md. Ali, Massofia, et al.
Published: (2018)
by: Md. Ali, Massofia, et al.
Published: (2018)
Improving contractors’ practices of Industrialised Building System (IBS) implementation in construction industry
by: Ali Al-Shami, Mohammed Hamid
Published: (2019)
by: Ali Al-Shami, Mohammed Hamid
Published: (2019)
The Factors Affecting The Cost Estimating In
Pre-Construction Process
by: Mohamad, Yusmawati
Published: (2006)
by: Mohamad, Yusmawati
Published: (2006)
Current status of life cycle cost practice in Malaysian construction industry
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
An investigation on benefits and future expectation of Industrialised Building System (IBS) implementation in construction practices
by: Ismail, Hassan, et al.
Published: (2018)
by: Ismail, Hassan, et al.
Published: (2018)
Key constraint in construction industry: A review
by: Nurul Athirah, R., et al.
Published: (2022)
by: Nurul Athirah, R., et al.
Published: (2022)
Significant usage of slab and wall form technique in industrialised building systems (IBS) for low cost highrise apartments construction
by: Abdul Rahman, Redzuan
Published: (2006)
by: Abdul Rahman, Redzuan
Published: (2006)
Prospects of Quantity Surveyor Undergraduate in Construction Sector
by: Tan, Wan Yu, et al.
Published: (2016)
by: Tan, Wan Yu, et al.
Published: (2016)
Factors affecting cost overrun at construction projects in Somalia
by: Osman, Yusuf Hussein
Published: (2019)
by: Osman, Yusuf Hussein
Published: (2019)
Key Characteristics Of Rural Construction SMEs
by: Kamal, Ernawati Mustafa, et al.
Published: (2014)
by: Kamal, Ernawati Mustafa, et al.
Published: (2014)
Factors Affecting Construction Organization Quality Management System In The Malaysian Construction Industry
by: Said, Ilias, et al.
Published: (2009)
by: Said, Ilias, et al.
Published: (2009)
An Examination of the Key Drivers of Amendments to the Standard Forms of Contract in the South African Construction Industry
by: Mewomo, Modupe Cecilia, et al.
Published: (2018)
by: Mewomo, Modupe Cecilia, et al.
Published: (2018)
Cost control in construction project of the site
by: Mohd Iskandar Zulkarnain, Talib
Published: (2010)
by: Mohd Iskandar Zulkarnain, Talib
Published: (2010)
The South African Construction Industry: Perceptions Of Key
Challenges Facing Its Performance, Development And Growth
by: Windapo, Abimbola Olukemi, et al.
Published: (2013)
by: Windapo, Abimbola Olukemi, et al.
Published: (2013)
New Procurement Method for Housing Projects Implementing IBS Modular System
by: Abd Jalil, Ahmad, et al.
Published: (2015)
by: Abd Jalil, Ahmad, et al.
Published: (2015)
Identifying and Addressing Critical Issues in the Indian Construction
Industry: Perspectives of Large Building Construction Clients
by: Loganathan, Santhosh, et al.
Published: (2017)
by: Loganathan, Santhosh, et al.
Published: (2017)
Investigating the relationship between site supervision and IBS based construction projects
by: Saad, M. Syamsyul H., et al.
Published: (2019)
by: Saad, M. Syamsyul H., et al.
Published: (2019)
The effect of different industrialized building system (IBS) construction methods compared to the conventional method on occupational safety and health (OSH) industry risks in construction
by: Mohd Amin, Mohamad Ariff
Published: (2021)
by: Mohd Amin, Mohamad Ariff
Published: (2021)
Analysis of delays in Tanzanian construction industry: Transaction cost economics (TCE) and structural equation modeling (SEM) approach
by: T.J., Deepak, et al.
Published: (2017)
by: T.J., Deepak, et al.
Published: (2017)
Cost and contract administration in construction: divine perspectives
Published: (2016)
Published: (2016)
A Study on the Issues Of Construction Disputes
In Malaysia and Singapore
by: Chua, Shu Cing
Published: (2012)
by: Chua, Shu Cing
Published: (2012)
Similar Items
-
Financial barriers in achieving CIDB IBS Roadmap in Malaysia private sector construction industry
by: Lim, Desmond Eng Hong, et al.
Published: (2018) -
Compatibility issues of Industrialized Building System (IBS) in interior construction: a case study in Kuala Lumpur
by: Yaman, Rostam, et al.
Published: (2019) -
Factors affecting speed of industrialized building system (IBS) projects in Malaysia
by: Alaghbari, Wa’el, et al.
Published: (2008) -
Impact of cost overrun factors on the project delay in construction industry, Pahang, Malaysia
by: Zhi Jia, Ling
Published: (2014) -
Adaptable effectiveness of industrialised building (IBS) in construction projects
by: Zulkarnain, Muhamad
Published: (2013)