The Causes, Impacts Of And Ways To Mitigate The Delay Effectively in Construction Industry

The objectives of this study are to identify the causes of delays in construction, the impacts delays in construction and ways to mitigate the construction delays. Based on the literature review and survey questionnaire of this research were carry out, there are total seven categories are take part...

Full description

Bibliographic Details
Main Author: Ghazali, Wardah Musfirah
Format: Thesis
Language:English
Published: 2014
Subjects:
Online Access:http://eprints.intimal.edu.my/1232/
http://eprints.intimal.edu.my/1232/1/BQSI%2011.pdf
_version_ 1848766679923818496
author Ghazali, Wardah Musfirah
author_facet Ghazali, Wardah Musfirah
author_sort Ghazali, Wardah Musfirah
building INTI Institutional Repository
collection Online Access
description The objectives of this study are to identify the causes of delays in construction, the impacts delays in construction and ways to mitigate the construction delays. Based on the literature review and survey questionnaire of this research were carry out, there are total seven categories are take part in the causes of delays in construction delays. The survey questionnaires were distributed to the targeted respondents either in consultant, contractor or client/developer type of organization. All the three objectives in this study are fully achieved. The top five important factors that are chosen by the three parties involved contributed to the causes of delays are shortage of labour, rework due to errors during construction, improper construction methods implement, low productivity level of labours and ineffective planning and scheduling of projects. The impacts of delays the most identified by the top five consist of frequent coordination between the parties involved, site management and supervision, proper project planning and scheduling, clear information and communication channels and effective strategic planning.
first_indexed 2025-11-14T11:54:59Z
format Thesis
id intimal-1232
institution INTI International University
institution_category Local University
language English
last_indexed 2025-11-14T11:54:59Z
publishDate 2014
recordtype eprints
repository_type Digital Repository
spelling intimal-12322018-11-21T04:31:16Z http://eprints.intimal.edu.my/1232/ The Causes, Impacts Of And Ways To Mitigate The Delay Effectively in Construction Industry Ghazali, Wardah Musfirah TA Engineering (General). Civil engineering (General) TK Electrical engineering. Electronics Nuclear engineering The objectives of this study are to identify the causes of delays in construction, the impacts delays in construction and ways to mitigate the construction delays. Based on the literature review and survey questionnaire of this research were carry out, there are total seven categories are take part in the causes of delays in construction delays. The survey questionnaires were distributed to the targeted respondents either in consultant, contractor or client/developer type of organization. All the three objectives in this study are fully achieved. The top five important factors that are chosen by the three parties involved contributed to the causes of delays are shortage of labour, rework due to errors during construction, improper construction methods implement, low productivity level of labours and ineffective planning and scheduling of projects. The impacts of delays the most identified by the top five consist of frequent coordination between the parties involved, site management and supervision, proper project planning and scheduling, clear information and communication channels and effective strategic planning. 2014-04-01 Thesis NonPeerReviewed text en http://eprints.intimal.edu.my/1232/1/BQSI%2011.pdf Ghazali, Wardah Musfirah (2014) The Causes, Impacts Of And Ways To Mitigate The Delay Effectively in Construction Industry. Other thesis, INTI INTERNATIONAL UNIVERSITY.
spellingShingle TA Engineering (General). Civil engineering (General)
TK Electrical engineering. Electronics Nuclear engineering
Ghazali, Wardah Musfirah
The Causes, Impacts Of And Ways To Mitigate The Delay Effectively in Construction Industry
title The Causes, Impacts Of And Ways To Mitigate The Delay Effectively in Construction Industry
title_full The Causes, Impacts Of And Ways To Mitigate The Delay Effectively in Construction Industry
title_fullStr The Causes, Impacts Of And Ways To Mitigate The Delay Effectively in Construction Industry
title_full_unstemmed The Causes, Impacts Of And Ways To Mitigate The Delay Effectively in Construction Industry
title_short The Causes, Impacts Of And Ways To Mitigate The Delay Effectively in Construction Industry
title_sort causes, impacts of and ways to mitigate the delay effectively in construction industry
topic TA Engineering (General). Civil engineering (General)
TK Electrical engineering. Electronics Nuclear engineering
url http://eprints.intimal.edu.my/1232/
http://eprints.intimal.edu.my/1232/1/BQSI%2011.pdf