Extension Of Time in Construction Industry

Delay is the most common activities in the construction industry and it might be because of some relevant events caused by the owner, consultants, contractor, subcontractors and etc. these delays not only will cause the construction works beyond the period of completion and they might cause the over...

Full description

Bibliographic Details
Main Author: Tan, Ying Xuan
Format: Thesis
Language:English
Published: 2013
Subjects:
Online Access:http://eprints.intimal.edu.my/1229/
http://eprints.intimal.edu.my/1229/1/BQSI%2010.pdf
_version_ 1848766679147872256
author Tan, Ying Xuan
author_facet Tan, Ying Xuan
author_sort Tan, Ying Xuan
building INTI Institutional Repository
collection Online Access
description Delay is the most common activities in the construction industry and it might be because of some relevant events caused by the owner, consultants, contractor, subcontractors and etc. these delays not only will cause the construction works beyond the period of completion and they might cause the overall project beyond the budget. All of the parties have the ability to prevent the EOT happen in this project in order to reduce any loss and expense of the client or themselves as well. For example, if the delay is caused the contractor then he/she needs to take responsibilities for the L.D in other way, the contractor will be given the additional time to complete the defaults as as the remaining work if delay is not the contractor’s fault. The main purpose to produce this research is to understand the EOT, identify the specification of the EOT, the factor of EOT as well as the prevention of EOT. Besides, this research also carried questionnaire survey with the experience personnel and contract administrative in order to understand more about the cause of EOT and try to find the way to reduce the probability of EOT happen in the construction industry
first_indexed 2025-11-14T11:54:58Z
format Thesis
id intimal-1229
institution INTI International University
institution_category Local University
language English
last_indexed 2025-11-14T11:54:58Z
publishDate 2013
recordtype eprints
repository_type Digital Repository
spelling intimal-12292018-11-21T03:14:59Z http://eprints.intimal.edu.my/1229/ Extension Of Time in Construction Industry Tan, Ying Xuan Q Science (General) QA Mathematics Delay is the most common activities in the construction industry and it might be because of some relevant events caused by the owner, consultants, contractor, subcontractors and etc. these delays not only will cause the construction works beyond the period of completion and they might cause the overall project beyond the budget. All of the parties have the ability to prevent the EOT happen in this project in order to reduce any loss and expense of the client or themselves as well. For example, if the delay is caused the contractor then he/she needs to take responsibilities for the L.D in other way, the contractor will be given the additional time to complete the defaults as as the remaining work if delay is not the contractor’s fault. The main purpose to produce this research is to understand the EOT, identify the specification of the EOT, the factor of EOT as well as the prevention of EOT. Besides, this research also carried questionnaire survey with the experience personnel and contract administrative in order to understand more about the cause of EOT and try to find the way to reduce the probability of EOT happen in the construction industry 2013-11-01 Thesis NonPeerReviewed text en http://eprints.intimal.edu.my/1229/1/BQSI%2010.pdf Tan, Ying Xuan (2013) Extension Of Time in Construction Industry. Other thesis, INTI INTERNATIONAL UNIVERSITY.
spellingShingle Q Science (General)
QA Mathematics
Tan, Ying Xuan
Extension Of Time in Construction Industry
title Extension Of Time in Construction Industry
title_full Extension Of Time in Construction Industry
title_fullStr Extension Of Time in Construction Industry
title_full_unstemmed Extension Of Time in Construction Industry
title_short Extension Of Time in Construction Industry
title_sort extension of time in construction industry
topic Q Science (General)
QA Mathematics
url http://eprints.intimal.edu.my/1229/
http://eprints.intimal.edu.my/1229/1/BQSI%2010.pdf