Determination of The Suitable Alternative Dispute Resolution Method For The Construction Industry Players In Malaysia

Disputes always occur and are hard to be avoided in the Malaysia construction industry through all these years. Disputes can happen anytime from pre contract until post contract, payment issues, issues regard workmanship, architect instructions are the common factors that lead to dispute in Malaysia...

Full description

Bibliographic Details
Main Author: Chong, Alan Sze Hsyung
Format: Thesis
Language:English
Published: 2013
Subjects:
Online Access:http://eprints.intimal.edu.my/1224/
http://eprints.intimal.edu.my/1224/1/BQSI%204.pdf
_version_ 1848766678086713344
author Chong, Alan Sze Hsyung
author_facet Chong, Alan Sze Hsyung
author_sort Chong, Alan Sze Hsyung
building INTI Institutional Repository
collection Online Access
description Disputes always occur and are hard to be avoided in the Malaysia construction industry through all these years. Disputes can happen anytime from pre contract until post contract, payment issues, issues regard workmanship, architect instructions are the common factors that lead to dispute in Malaysia construction industry. When dispute occurs different approach of dispute resolution will be adopted to solve or reduce the dispute. There are two main categories of dispute resolution method available for the industry: one is the traditional dispute resolution method(TDR) and the alternative resolution method (ADR). The TDR are methods that are famous and commonly use in the industry all these years, will the ADR is method that are developed to redress the shortage of TDR and provide an alternative means to solve disputes. The objectives of this research are to address the gap of the traditional Dispute Resolution Methods in Malaysia and to identify their problems and to study on different kinds of dispute resolution method and the pros and cons. The main findings of this research determine the suitable types of dispute resolution method the industry players preferred to be adopted, based on the nature and culture of the Malaysia construction industry. The findings will be obtained from analysis based on in-depth interview (qualitative research method) conducted with Malaysia construction experts like the quality surveyors, engineers, and arbitrators/mediators. This is a helpful research which helps to analyse the different ADR METHOD AND TO DETERMINE THE BETTER ADR method used in Malaysia, which help to reduce resolution time, solve dispute as fast as possible, and to spell out which ADR method is suitable for which type.
first_indexed 2025-11-14T11:54:57Z
format Thesis
id intimal-1224
institution INTI International University
institution_category Local University
language English
last_indexed 2025-11-14T11:54:57Z
publishDate 2013
recordtype eprints
repository_type Digital Repository
spelling intimal-12242018-11-16T03:55:39Z http://eprints.intimal.edu.my/1224/ Determination of The Suitable Alternative Dispute Resolution Method For The Construction Industry Players In Malaysia Chong, Alan Sze Hsyung TA Engineering (General). Civil engineering (General) TK Electrical engineering. Electronics Nuclear engineering Disputes always occur and are hard to be avoided in the Malaysia construction industry through all these years. Disputes can happen anytime from pre contract until post contract, payment issues, issues regard workmanship, architect instructions are the common factors that lead to dispute in Malaysia construction industry. When dispute occurs different approach of dispute resolution will be adopted to solve or reduce the dispute. There are two main categories of dispute resolution method available for the industry: one is the traditional dispute resolution method(TDR) and the alternative resolution method (ADR). The TDR are methods that are famous and commonly use in the industry all these years, will the ADR is method that are developed to redress the shortage of TDR and provide an alternative means to solve disputes. The objectives of this research are to address the gap of the traditional Dispute Resolution Methods in Malaysia and to identify their problems and to study on different kinds of dispute resolution method and the pros and cons. The main findings of this research determine the suitable types of dispute resolution method the industry players preferred to be adopted, based on the nature and culture of the Malaysia construction industry. The findings will be obtained from analysis based on in-depth interview (qualitative research method) conducted with Malaysia construction experts like the quality surveyors, engineers, and arbitrators/mediators. This is a helpful research which helps to analyse the different ADR METHOD AND TO DETERMINE THE BETTER ADR method used in Malaysia, which help to reduce resolution time, solve dispute as fast as possible, and to spell out which ADR method is suitable for which type. 2013-04-01 Thesis NonPeerReviewed text en http://eprints.intimal.edu.my/1224/1/BQSI%204.pdf Chong, Alan Sze Hsyung (2013) Determination of The Suitable Alternative Dispute Resolution Method For The Construction Industry Players In Malaysia. Other thesis, INTI INTERNATIONAL UNIVERSITY.
spellingShingle TA Engineering (General). Civil engineering (General)
TK Electrical engineering. Electronics Nuclear engineering
Chong, Alan Sze Hsyung
Determination of The Suitable Alternative Dispute Resolution Method For The Construction Industry Players In Malaysia
title Determination of The Suitable Alternative Dispute Resolution Method For The Construction Industry Players In Malaysia
title_full Determination of The Suitable Alternative Dispute Resolution Method For The Construction Industry Players In Malaysia
title_fullStr Determination of The Suitable Alternative Dispute Resolution Method For The Construction Industry Players In Malaysia
title_full_unstemmed Determination of The Suitable Alternative Dispute Resolution Method For The Construction Industry Players In Malaysia
title_short Determination of The Suitable Alternative Dispute Resolution Method For The Construction Industry Players In Malaysia
title_sort determination of the suitable alternative dispute resolution method for the construction industry players in malaysia
topic TA Engineering (General). Civil engineering (General)
TK Electrical engineering. Electronics Nuclear engineering
url http://eprints.intimal.edu.my/1224/
http://eprints.intimal.edu.my/1224/1/BQSI%204.pdf