Study of The Nature, Sources and Avoidance of Dispute and Resolution in Construction Industry

Construction dispute is found to be very common issue in the construction industry and it has bought negative impact to each participants in a construction project. Therefore, this research study was carried in order to investigate the causes, impact and dispute resolution related to the dispute in...

Full description

Bibliographic Details
Main Author: Kuan, Hong Wei
Format: Thesis
Language:English
Published: 2013
Subjects:
Online Access:http://eprints.intimal.edu.my/1218/
http://eprints.intimal.edu.my/1218/1/BQSI%201.pdf
_version_ 1848766676511752192
author Kuan, Hong Wei
author_facet Kuan, Hong Wei
author_sort Kuan, Hong Wei
building INTI Institutional Repository
collection Online Access
description Construction dispute is found to be very common issue in the construction industry and it has bought negative impact to each participants in a construction project. Therefore, this research study was carried in order to investigate the causes, impact and dispute resolution related to the dispute in construction industry. A questionnaire survey involving 30 responses of constructed players in Malaysia the research objectives are: (1) To recognize the nature and sources of dispute in the construction industry, (2) To identify a guideline and method for avoiding and minimizing the occurrence of dispute in the construction industry, and (3) To overview the procedure of arbitration as one of the prominent dispute resolution method in Malaysia. The survey questionnaire was carried out through online questionnaire. After conducted an analysis based on the returned questionnaires, determine the main source of dispute among the 6 group of source of dispute, which are (1) Determination of agreement, (2) Payment, (3) The site and execution of work, (4) Times, (5) Negligence and nuisance, and (6) Final certificate/payment. Moreover this study also look into construction stages for dispute avoidance, which are (1) Inception stage, (2) Establishment of brief stage, (3) During the design and detailing stage, (4) preparation of tender documentation stage, (5) preparation of tender bid stage, (6) Contract award stage and (7) During the currency of contract/ execution of work stage. Lastly, the procedure of arbitration will be study.sT
first_indexed 2025-11-14T11:54:56Z
format Thesis
id intimal-1218
institution INTI International University
institution_category Local University
language English
last_indexed 2025-11-14T11:54:56Z
publishDate 2013
recordtype eprints
repository_type Digital Repository
spelling intimal-12182018-10-31T07:47:34Z http://eprints.intimal.edu.my/1218/ Study of The Nature, Sources and Avoidance of Dispute and Resolution in Construction Industry Kuan, Hong Wei TA Engineering (General). Civil engineering (General) Construction dispute is found to be very common issue in the construction industry and it has bought negative impact to each participants in a construction project. Therefore, this research study was carried in order to investigate the causes, impact and dispute resolution related to the dispute in construction industry. A questionnaire survey involving 30 responses of constructed players in Malaysia the research objectives are: (1) To recognize the nature and sources of dispute in the construction industry, (2) To identify a guideline and method for avoiding and minimizing the occurrence of dispute in the construction industry, and (3) To overview the procedure of arbitration as one of the prominent dispute resolution method in Malaysia. The survey questionnaire was carried out through online questionnaire. After conducted an analysis based on the returned questionnaires, determine the main source of dispute among the 6 group of source of dispute, which are (1) Determination of agreement, (2) Payment, (3) The site and execution of work, (4) Times, (5) Negligence and nuisance, and (6) Final certificate/payment. Moreover this study also look into construction stages for dispute avoidance, which are (1) Inception stage, (2) Establishment of brief stage, (3) During the design and detailing stage, (4) preparation of tender documentation stage, (5) preparation of tender bid stage, (6) Contract award stage and (7) During the currency of contract/ execution of work stage. Lastly, the procedure of arbitration will be study.sT 2013-04-01 Thesis NonPeerReviewed text en http://eprints.intimal.edu.my/1218/1/BQSI%201.pdf Kuan, Hong Wei (2013) Study of The Nature, Sources and Avoidance of Dispute and Resolution in Construction Industry. Other thesis, INTI INTERNATIONAL UNIVERSITY.
spellingShingle TA Engineering (General). Civil engineering (General)
Kuan, Hong Wei
Study of The Nature, Sources and Avoidance of Dispute and Resolution in Construction Industry
title Study of The Nature, Sources and Avoidance of Dispute and Resolution in Construction Industry
title_full Study of The Nature, Sources and Avoidance of Dispute and Resolution in Construction Industry
title_fullStr Study of The Nature, Sources and Avoidance of Dispute and Resolution in Construction Industry
title_full_unstemmed Study of The Nature, Sources and Avoidance of Dispute and Resolution in Construction Industry
title_short Study of The Nature, Sources and Avoidance of Dispute and Resolution in Construction Industry
title_sort study of the nature, sources and avoidance of dispute and resolution in construction industry
topic TA Engineering (General). Civil engineering (General)
url http://eprints.intimal.edu.my/1218/
http://eprints.intimal.edu.my/1218/1/BQSI%201.pdf