Contractors’ Perspective on Material Waste Reduction in Kuala Lumpur
In the area of sustainable development, construction waste is an important issue that must be tackled responsibly. It is an assortment of waste, at the stage of construction. This paper assesses waste minimisation or reduction measures and such practices in the Kuala Lumpur construction industry....
| Main Authors: | Nurul Aini, Osman, Mohd Amir Shazwan, Hashim, Jye, Hwoi Pok |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
UPM Press
2017
|
| Subjects: | |
| Online Access: | http://eprints.intimal.edu.my/1072/ http://eprints.intimal.edu.my/1072/1/JST_VOL25_MAY2017.pdf |
Similar Items
Contractors' Perspective on Material Waste Reduction in Kuala Lumpur
by: Nurul Aini, Osman, et al.
Published: (2016)
by: Nurul Aini, Osman, et al.
Published: (2016)
Evaluating the Material Waste Reduction by Using Prefabrication in Building Construction in Kuala Lumpur
by: Nurul Aini, Osman, et al.
Published: (2016)
by: Nurul Aini, Osman, et al.
Published: (2016)
Evaluation of Construction Industry payment and Adjudication Act 2012 (CIPPA): An Overview Perspective by Contractors in Kuala Lumpur
by: Yap, Mun Hoe
Published: (2015)
by: Yap, Mun Hoe
Published: (2015)
Development Of Municipal Solid Waste Generation And Recyclable Components Rate Of Kuala Lumpur: Perspective Study.
by: Saeed, Mohamed Osman, et al.
Published: (2008)
by: Saeed, Mohamed Osman, et al.
Published: (2008)
The importance of cleanliness in a proper construction site
management in malaysia: a contractor’s perspective
by: Shazwan, M. A.*, et al.
Published: (2017)
by: Shazwan, M. A.*, et al.
Published: (2017)
Attitude and behaviour of contractor in managing waste management in construction
by: Muhammad Farid Aiezat, Abdul Hamid
Published: (2018)
by: Muhammad Farid Aiezat, Abdul Hamid
Published: (2018)
Impact Of Covid-19 On Construction Industry From Contractor’s Perspective
by: Radzi, Fatin Nadia Mohamad
Published: (2021)
by: Radzi, Fatin Nadia Mohamad
Published: (2021)
Exploring the barriers in implementation of qlassic in Malaysian construction industry from the perspective of contractors
by: Zahrizan, Zakaria, et al.
Published: (2023)
by: Zahrizan, Zakaria, et al.
Published: (2023)
Application Of Coconut Waste As Green Roof Materials For The Reduction Of Urban Heat Island (UHI)
by: Nur Ashfahani, Mohamad Sa’edin
Published: (2023)
by: Nur Ashfahani, Mohamad Sa’edin
Published: (2023)
Effectiveness of CIPAA Implementation in Construction Industry from the Perspective of Contractors in Malaysia
by: Ahmi, Nur Nadia, et al.
Published: (2023)
by: Ahmi, Nur Nadia, et al.
Published: (2023)
Heavy metals in Kuala Lumpur municipal solid waste
by: Steven, Anthony Nyangson
Published: (2003)
by: Steven, Anthony Nyangson
Published: (2003)
Affecting Factors for Implementing Performance-Based Maintenance Contracting: Perspective of Malaysian Road Contractors
by: R., Manogaran, et al.
Published: (2021)
by: R., Manogaran, et al.
Published: (2021)
The study of dependency factors on foreign worker in construction industry : contractor perspective
by: Nur Hidayah, Aliman
Published: (2017)
by: Nur Hidayah, Aliman
Published: (2017)
Selection of contractor using analytical hierarchy process (AHP)
by: Nurul Syafiqah, Zaini
Published: (2018)
by: Nurul Syafiqah, Zaini
Published: (2018)
Tendering and estimating strategies In contractor organization
by: Liana Syafawati, Mohamad Azmi
Published: (2017)
by: Liana Syafawati, Mohamad Azmi
Published: (2017)
Enhanced the Municipal Solid Waste Management in Kuala Lumpur by Implementing Technologies from European Countries: Strategies and Action Plans
by: Siti Fatimah, Che Osmi, et al.
Published: (2013)
by: Siti Fatimah, Che Osmi, et al.
Published: (2013)
Soil Infiltration Variability Mappping: Kuala Lumpur
by: Chan, Shen Sam
Published: (2006)
by: Chan, Shen Sam
Published: (2006)
Cost Overrun in Construction Projects in Malaysia: A Study on Contractor Related Factors
by: Norul Izzati, M. Ashaari, et al.
Published: (2019)
by: Norul Izzati, M. Ashaari, et al.
Published: (2019)
Contractor's application for an extension of time
by: Danial, Norhana
Published: (2007)
by: Danial, Norhana
Published: (2007)
Development of synthetic time histories at bedrock for Kuala Lumpur
by: Adnan, Azlan, et al.
Published: (2006)
by: Adnan, Azlan, et al.
Published: (2006)
Integrated Scheduled Waste Management System in Kuala Lumpur using expert system
by: Kabbashi, Nassereldeen Ahmed, et al.
Published: (2011)
by: Kabbashi, Nassereldeen Ahmed, et al.
Published: (2011)
Client satisfaction on contractors' work performance
by: Adanan, Hadiatul Aida
Published: (2006)
by: Adanan, Hadiatul Aida
Published: (2006)
Integrated Scheduled Waste Management System in Kuala Lumpur using Expert System
by: Kabbashi, Nassereldeen Ahmed, et al.
Published: (2011)
by: Kabbashi, Nassereldeen Ahmed, et al.
Published: (2011)
The applications of surveying techniques in Kuala Lumpur Smart Tunnel Project
by: Kamis, Azmaliza, et al.
Published: (2007)
by: Kamis, Azmaliza, et al.
Published: (2007)
Quality performance of ISO 9000/2001 certified contractors
by: Gui, Hun Chuen
Published: (2007)
by: Gui, Hun Chuen
Published: (2007)
The Practice of Heritage Building Conservation in Kuala Lumpur, Malaysia
by: Noorizam, Nukhairiah Sakinah
Published: (2014)
by: Noorizam, Nukhairiah Sakinah
Published: (2014)
Analysis Of Site Classification For Kuala Lumpurs Ground Assessment.
by: Mansor, Siti Saffur
Published: (2003)
by: Mansor, Siti Saffur
Published: (2003)
Payment woes among Malaysian contractors
by: Che Munaaim, Muhammad Ehsan
Published: (2006)
by: Che Munaaim, Muhammad Ehsan
Published: (2006)
Challenges face by Malaysian contractors in international ventures
by: Abu Bakar, Zaradiah
Published: (2008)
by: Abu Bakar, Zaradiah
Published: (2008)
Temporal Relationship Between Particulate Matter (PM10) And Carbon Monoxide (CO) In Kuala Lumpur
by: Ghazali, Nurul Adyani
Published: (2005)
by: Ghazali, Nurul Adyani
Published: (2005)
Mechanical Properties Of Concrete With Different Types Of Glass Waste As Cement Replacement Material
by: Bakar, Amir Syazwan Abu
Published: (2022)
by: Bakar, Amir Syazwan Abu
Published: (2022)
A study of construction waste material management in Malaysia : a contractor point of view
by: Hilmi Hakim, Bakri
Published: (2017)
by: Hilmi Hakim, Bakri
Published: (2017)
Issues Contractor's Face in The Construction Industry of slamabad and Rawalpindi (Pakistan)
by: Ammar, Ahmed Abbasi
Published: (2018)
by: Ammar, Ahmed Abbasi
Published: (2018)
Development of contractor's proposal process model in design-build procurement
by: Then, Dennis Choo Khun
Published: (2005)
by: Then, Dennis Choo Khun
Published: (2005)
The contractor's right actions against late or non payment by the employer
by: Judi, Siti Suhana
Published: (2007)
by: Judi, Siti Suhana
Published: (2007)
Factors affecting the contractor’s mark-up size decision in Malaysia
by: Tey, Kim Hai
Published: (2009)
by: Tey, Kim Hai
Published: (2009)
How to reduce wastes and save materials
by: Mohd. Ghazali, Mohd. Zulkifli, et al.
Published: (1993)
by: Mohd. Ghazali, Mohd. Zulkifli, et al.
Published: (1993)
The performance of Felda Plantations Sdn. Bhd. contractors
by: Ibrahim, Ramzi
Published: (2006)
by: Ibrahim, Ramzi
Published: (2006)
Late payment problems among contractors in Malaysia
by: Mohd. Nazir, Noor Zarina
Published: (2006)
by: Mohd. Nazir, Noor Zarina
Published: (2006)
Awareness of Malaysian contractor in practicing waste recycling / Noor Anis Adila Azman
by: Azman, Noor Anis Adila
Published: (2015)
by: Azman, Noor Anis Adila
Published: (2015)
Similar Items
-
Contractors' Perspective on Material Waste Reduction in Kuala Lumpur
by: Nurul Aini, Osman, et al.
Published: (2016) -
Evaluating the Material Waste Reduction by Using Prefabrication in Building Construction in Kuala Lumpur
by: Nurul Aini, Osman, et al.
Published: (2016) -
Evaluation of Construction Industry payment and Adjudication Act 2012 (CIPPA): An Overview Perspective by Contractors in Kuala Lumpur
by: Yap, Mun Hoe
Published: (2015) -
Development Of Municipal Solid Waste Generation And Recyclable Components Rate Of Kuala Lumpur: Perspective Study.
by: Saeed, Mohamed Osman, et al.
Published: (2008) -
The importance of cleanliness in a proper construction site
management in malaysia: a contractor’s perspective
by: Shazwan, M. A.*, et al.
Published: (2017)