The effectiveness of Microsoft Project in assessing extension of time under PAM 2006 standard form of contract

Time is equal to money; and it is applies in the construction industry where time is very important. Most of the standard form of contracts provide contractual clauses to ascertain time and money related to the scenarios while Extension of Time (EOT) is one of them. Under circumstance and delays,...

Full description

Bibliographic Details
Main Authors: Suhaida @ Suhana, Kamarudin Nurul Aini Osman*, Wong, Z. D.*
Format: Article
Language:English
Published: IOP Publishing 2017
Subjects:
Online Access:http://eprints.intimal.edu.my/1014/
http://eprints.intimal.edu.my/1014/1/Suhaida_2017_IOP_Conf._Ser.%253A_Mater._Sci._Eng._271_012049.pdf
_version_ 1848766622040326144
author Suhaida @ Suhana, Kamarudin Nurul Aini Osman*
Wong, Z. D.*
author_facet Suhaida @ Suhana, Kamarudin Nurul Aini Osman*
Wong, Z. D.*
author_sort Suhaida @ Suhana, Kamarudin Nurul Aini Osman*
building INTI Institutional Repository
collection Online Access
description Time is equal to money; and it is applies in the construction industry where time is very important. Most of the standard form of contracts provide contractual clauses to ascertain time and money related to the scenarios while Extension of Time (EOT) is one of them. Under circumstance and delays, contractor is allow to apply EOT in order to complete the works on a later completion date without Liquidated Damages (LD) imposed to the claimant. However, both claimants and assessors encountered problems in assessing the EOT. The aim of this research is to recommend the usage of Microsoft Project as a tool in assessing EOT associated with the standard form of contract, PAM 2006. A quantitative method is applied towards the respondents that consisted of architects and quantity surveyors (QS) in order to collect data on challenges in assessing EOT claims and the effectiveness of Microsoft Project as a tool. The finding of this research highlighted that Microsoft Project can serve as a basis to perform EOT tasks as this software can be used as a data bank to store handy information which crucial for preparing and evaluating EOT.
first_indexed 2025-11-14T11:54:04Z
format Article
id intimal-1014
institution INTI International University
institution_category Local University
language English
last_indexed 2025-11-14T11:54:04Z
publishDate 2017
publisher IOP Publishing
recordtype eprints
repository_type Digital Repository
spelling intimal-10142018-02-09T02:19:08Z http://eprints.intimal.edu.my/1014/ The effectiveness of Microsoft Project in assessing extension of time under PAM 2006 standard form of contract Suhaida @ Suhana, Kamarudin Nurul Aini Osman* Wong, Z. D.* TH Building construction Time is equal to money; and it is applies in the construction industry where time is very important. Most of the standard form of contracts provide contractual clauses to ascertain time and money related to the scenarios while Extension of Time (EOT) is one of them. Under circumstance and delays, contractor is allow to apply EOT in order to complete the works on a later completion date without Liquidated Damages (LD) imposed to the claimant. However, both claimants and assessors encountered problems in assessing the EOT. The aim of this research is to recommend the usage of Microsoft Project as a tool in assessing EOT associated with the standard form of contract, PAM 2006. A quantitative method is applied towards the respondents that consisted of architects and quantity surveyors (QS) in order to collect data on challenges in assessing EOT claims and the effectiveness of Microsoft Project as a tool. The finding of this research highlighted that Microsoft Project can serve as a basis to perform EOT tasks as this software can be used as a data bank to store handy information which crucial for preparing and evaluating EOT. IOP Publishing 2017 Article PeerReviewed text en http://eprints.intimal.edu.my/1014/1/Suhaida_2017_IOP_Conf._Ser.%253A_Mater._Sci._Eng._271_012049.pdf Suhaida @ Suhana, Kamarudin Nurul Aini Osman* and Wong, Z. D.* (2017) The effectiveness of Microsoft Project in assessing extension of time under PAM 2006 standard form of contract. IOP Conference Series: Materials Science and Engineering,, 271. ISSN 1757-8981 10.1088/1757-899X/271/1/012049
spellingShingle TH Building construction
Suhaida @ Suhana, Kamarudin Nurul Aini Osman*
Wong, Z. D.*
The effectiveness of Microsoft Project in assessing extension of time under PAM 2006 standard form of contract
title The effectiveness of Microsoft Project in assessing extension of time under PAM 2006 standard form of contract
title_full The effectiveness of Microsoft Project in assessing extension of time under PAM 2006 standard form of contract
title_fullStr The effectiveness of Microsoft Project in assessing extension of time under PAM 2006 standard form of contract
title_full_unstemmed The effectiveness of Microsoft Project in assessing extension of time under PAM 2006 standard form of contract
title_short The effectiveness of Microsoft Project in assessing extension of time under PAM 2006 standard form of contract
title_sort effectiveness of microsoft project in assessing extension of time under pam 2006 standard form of contract
topic TH Building construction
url http://eprints.intimal.edu.my/1014/
http://eprints.intimal.edu.my/1014/
http://eprints.intimal.edu.my/1014/1/Suhaida_2017_IOP_Conf._Ser.%253A_Mater._Sci._Eng._271_012049.pdf