Life cycle cost (beginning) to procurement managers
Appointed as A Speaker/Trainer by Public Works Department to provide one day training/lecture to Procurement Managers from all around Malaysia under Pensijilan Ukur Bahan -Pengurus Perolehan (Tahap 3): Program Latihan Jabatan Kerja Raya Malaysia 2019.
| Main Author: | Ayob, Mohd Fairullazi |
|---|---|
| Format: | Proceeding Paper |
| Language: | English English |
| Published: |
2019
|
| Subjects: | |
| Online Access: | http://irep.iium.edu.my/74171/ http://irep.iium.edu.my/74171/18/74171%20invitation%20letter.pdf http://irep.iium.edu.my/74171/1/JKR-LCC%20BEGINNING-PART%201%2031072019.pdf |
Similar Items
Life cycle cost analysis: beginning stage (Part 1)
by: Ayob, Mohd Fairullazi
Published: (2017)
by: Ayob, Mohd Fairullazi
Published: (2017)
Life Cycle Cost Analysis: Beginning Stage (Part 2)
by: Ayob, Mohd Fairullazi
Published: (2017)
by: Ayob, Mohd Fairullazi
Published: (2017)
A study on quality of cost data in Life Cycle Cost analysis of maintenance during the in-use phases of university building
by: Bidi, Nor Khalisah, et al.
Published: (2020)
by: Bidi, Nor Khalisah, et al.
Published: (2020)
Life cycle cost for construction projects
by: Ayob, Mohd Fairullazi
Published: (2018)
by: Ayob, Mohd Fairullazi
Published: (2018)
Life cycle cost for construction projects. Input lecture for AAR 7453 Professional Practice 1, (Master of Architecture Programme)
by: Ayob, Mohd Fairullazi
Published: (2019)
by: Ayob, Mohd Fairullazi
Published: (2019)
EPM 102(2) - EKONOMI KEJURUTERAAN APRIL 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EEK 475 ECONOMY AND MANAGEMENT ON POWER SYSTEM (JAN 2016)
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2011/2012 Academic Session June 2012 EPM 102/2 – Engineering Economy [Ekonomi Kejuruteraan] Duration: 2 hours [Masa: 2 jam]
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
EUP 201 - EKONOMI KEJURUTERAAN APRIL 1997.
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (1997)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (1997)
Forecasting currency in circulation in Malaysia using arch and garch models
by: Abdul Razak, Nur Azreen, et al.
Published: (2018)
by: Abdul Razak, Nur Azreen, et al.
Published: (2018)
Review of methodology designed to investigate quality of cost data input in life cycle cost
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Cost-effective analysis on the suitability of photovoltaic pumping systems in Bangladesh
by: Karim, A.N. Mustafizul, et al.
Published: (1993)
by: Karim, A.N. Mustafizul, et al.
Published: (1993)
Development of a quality check station in a pharmaceutical industry to achieve zero defect production using PDCA cycle
by: Mahmud, Khairus Syakirah, et al.
Published: (2015)
by: Mahmud, Khairus Syakirah, et al.
Published: (2015)
Possible cost reduction by applying MRP in a transformer manufacturing company of Bangladesh
by: Hasan, S. Mainul, et al.
Published: (2002)
by: Hasan, S. Mainul, et al.
Published: (2002)
Development of mathematical cost model for preheated
end-milling of AISI D2 tool steel
by: El-hadie, Mohamed, et al.
Published: (2011)
by: El-hadie, Mohamed, et al.
Published: (2011)
Development of mathematical cost model for room temperature
end-milling of AISI D2 tool steel
by: El-hadie, M, et al.
Published: (2011)
by: El-hadie, M, et al.
Published: (2011)
Impact of blockchain technology on green supply chain practices: evidence from emerging economy
by: Mubarik, Mobashar, et al.
Published: (2021)
by: Mubarik, Mobashar, et al.
Published: (2021)
Identification of cost data inputs in Life Cycle Cost (LCC) of alternative road pavement types
by: Ayob, Mohd Fairullazi, et al.
Published: (2017)
by: Ayob, Mohd Fairullazi, et al.
Published: (2017)
A system for road pavement Life Cycle Cost (LCC) analysis
by: Ayob, Mohd Fairullazi, et al.
Published: (2019)
by: Ayob, Mohd Fairullazi, et al.
Published: (2019)
The implementation of lean manufacturing in Malaysian automotive industry
by: S., Ahmad Fakhri, et al.
Published: (2012)
by: S., Ahmad Fakhri, et al.
Published: (2012)
Performance improvement of local automotive industry by adopting JMM
by: Mohiuddin, A. K. M., et al.
Published: (2015)
by: Mohiuddin, A. K. M., et al.
Published: (2015)
Integration of lean manufacturing and quality management system through structural equation modeling
by: Khalili, Amjad, et al.
Published: (2017)
by: Khalili, Amjad, et al.
Published: (2017)
Understanding contemporary models for organizational sustainability: critical review
by: Khalili, Amjad, et al.
Published: (2015)
by: Khalili, Amjad, et al.
Published: (2015)
A comparative evaluation of the prevailing models for measuring sustainable performance
by: Khalili, Amjad, et al.
Published: (2016)
by: Khalili, Amjad, et al.
Published: (2016)
Knowledge management strategies as a competitive advantage for delivering professional e-government services
by: Sabaghpour Azarian, Mahdieh, et al.
Published: (2013)
by: Sabaghpour Azarian, Mahdieh, et al.
Published: (2013)
Trends and perceptions of evidence-based software engineering research in Malaysia
by: Salleh, Norsaremah, et al.
Published: (2015)
by: Salleh, Norsaremah, et al.
Published: (2015)
Investigation of accuracy in microdrilling with minimum quantity lubrication
by: Mohammad, Yeakub Ali, et al.
Published: (2017)
by: Mohammad, Yeakub Ali, et al.
Published: (2017)
Investigation of effect of machine layout on productivity and utilization level: what if simulation approach
by: Bourini, Islam Faisal, et al.
Published: (2018)
by: Bourini, Islam Faisal, et al.
Published: (2018)
Developing mobile E-groceries model
by: Othman, Muhammad Fauzi, et al.
Published: (2016)
by: Othman, Muhammad Fauzi, et al.
Published: (2016)
Energy consideration in pharmaceutical factory layout
by: Nasry, Nasrul Ashraf, et al.
Published: (2015)
by: Nasry, Nasrul Ashraf, et al.
Published: (2015)
Landslide susceptibility mapping: a technical note
by: Sorooshian, Sharyar, et al.
Published: (2015)
by: Sorooshian, Sharyar, et al.
Published: (2015)
Reliability model and proposed maintainability activities of earth station system
by: Abdul Rahim, Nadirah, et al.
Published: (2020)
by: Abdul Rahim, Nadirah, et al.
Published: (2020)
G2C adoption of e-government in Malaysia: trust, perceived risk and political self-efficacy
by: Hussein, Ramlah, et al.
Published: (2010)
by: Hussein, Ramlah, et al.
Published: (2010)
A critical evaluation on the effectiveness of ISO 9001:2000 (QMS) implementation in Malaysian and Saudi manufacturing companies
by: Al-Turki, Abdullah Nasser, et al.
Published: (2010)
by: Al-Turki, Abdullah Nasser, et al.
Published: (2010)
Collaborative technologies in new factory's certification process
by: Mohiuddin, A. K. M., et al.
Published: (2005)
by: Mohiuddin, A. K. M., et al.
Published: (2005)
The successful implementation of TPM in conjunction with EOM and 5S: a case presentation
by: Ahmed, Shamsuddin, et al.
Published: (2005)
by: Ahmed, Shamsuddin, et al.
Published: (2005)
Dimensions of job satisfaction of library professionals: a qualitative exploration
by: Haque, Mahbubul, et al.
Published: (2012)
by: Haque, Mahbubul, et al.
Published: (2012)
The study on production performances of part transporter in flexible manufacturing system by using simulation method
by: Iqbal, Mohammad, et al.
Published: (2012)
by: Iqbal, Mohammad, et al.
Published: (2012)
Applying value stream mapping for productivity improvement
of a metal stamping industry
by: Karim, A.N. Mustafizul, et al.
Published: (2012)
by: Karim, A.N. Mustafizul, et al.
Published: (2012)
Economic scenario of cellulase enzyme production using Palm Oil Mill Effluent (POME)
by: Karim, A.N. Mustafizul, et al.
Published: (2012)
by: Karim, A.N. Mustafizul, et al.
Published: (2012)
Similar Items
-
Life cycle cost analysis: beginning stage (Part 1)
by: Ayob, Mohd Fairullazi
Published: (2017) -
Life Cycle Cost Analysis: Beginning Stage (Part 2)
by: Ayob, Mohd Fairullazi
Published: (2017) -
A study on quality of cost data in Life Cycle Cost analysis of maintenance during the in-use phases of university building
by: Bidi, Nor Khalisah, et al.
Published: (2020) -
Life cycle cost for construction projects
by: Ayob, Mohd Fairullazi
Published: (2018) -
Life cycle cost for construction projects. Input lecture for AAR 7453 Professional Practice 1, (Master of Architecture Programme)
by: Ayob, Mohd Fairullazi
Published: (2019)