Techno-commercial feasibility of grid-tied solar system in philips morris pvt ltd (commercial building) of Pakistan
Pakistan is a developing country. The population of Pakistan is increasing day by day and due to increase in population the demand of electrical energy is also rising. Currently, Pakistan has a power generation gap of average 4500 to 5500 megawatt hour (MWh) [1]. The Renewable energy plays a vital r...
| Main Authors: | , , , |
|---|---|
| Format: | Proceeding Paper |
| Language: | English English |
| Published: |
Institute of Electrical and Electronics Engineers Inc.
2018
|
| Subjects: | |
| Online Access: | http://irep.iium.edu.my/72881/ http://irep.iium.edu.my/72881/7/72881_Techno-commercial%20feasibility%20of%20grid-tied_complete_new.pdf http://irep.iium.edu.my/72881/1/72881_Techno-commercial%20feasibility%20of%20grid-tied_scopus.pdf |
| _version_ | 1848787699278807040 |
|---|---|
| author | Manzoor, Zahid Shahid, Zeeshan Khan, Sheroz Hwang, John Tan Teng |
| author_facet | Manzoor, Zahid Shahid, Zeeshan Khan, Sheroz Hwang, John Tan Teng |
| author_sort | Manzoor, Zahid |
| building | IIUM Repository |
| collection | Online Access |
| description | Pakistan is a developing country. The population of Pakistan is increasing day by day and due to increase in population the demand of electrical energy is also rising. Currently, Pakistan has a power generation gap of average 4500 to 5500 megawatt hour (MWh) [1]. The Renewable energy plays a vital role in such energy crisis by generating alternative power which is environmental friendly and reduces the carbon foot prints from the environment. The renewable energy sector that is solar, wind and hydro power is a very active area of research and there is a huge space available for modern industrial units and commercial buildings to fill the gap of energy generation and demand energy of Pakistan. In order to void that gap Philips Morris Pvt. ltd initiate with an on-grid solar system with Orient Energy Systems Pvt. ltd with a solar photovoltaic(PV) potential 151.2 kWp for first phase and it will extend up to 458.6 kWp in three phases. By installing solar system the firm saves to millions of rupees in bills of grid and also contributes towards green environment by reducing foot print of carbon dioxide emission from other power generation techniques. This paper provides a techno commercial feasibility of the implementation of the project and environmental friendly impact of such projects on global warming and ozone layer as well as the also shows that in future to reduce the dependency over energy sector and move towards self-reliance in generating greener and cleaner energy. |
| first_indexed | 2025-11-14T17:29:05Z |
| format | Proceeding Paper |
| id | iium-72881 |
| institution | International Islamic University Malaysia |
| institution_category | Local University |
| language | English English |
| last_indexed | 2025-11-14T17:29:05Z |
| publishDate | 2018 |
| publisher | Institute of Electrical and Electronics Engineers Inc. |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | iium-728812019-06-26T03:18:53Z http://irep.iium.edu.my/72881/ Techno-commercial feasibility of grid-tied solar system in philips morris pvt ltd (commercial building) of Pakistan Manzoor, Zahid Shahid, Zeeshan Khan, Sheroz Hwang, John Tan Teng TA Engineering (General). Civil engineering (General) TK Electrical engineering. Electronics Nuclear engineering Pakistan is a developing country. The population of Pakistan is increasing day by day and due to increase in population the demand of electrical energy is also rising. Currently, Pakistan has a power generation gap of average 4500 to 5500 megawatt hour (MWh) [1]. The Renewable energy plays a vital role in such energy crisis by generating alternative power which is environmental friendly and reduces the carbon foot prints from the environment. The renewable energy sector that is solar, wind and hydro power is a very active area of research and there is a huge space available for modern industrial units and commercial buildings to fill the gap of energy generation and demand energy of Pakistan. In order to void that gap Philips Morris Pvt. ltd initiate with an on-grid solar system with Orient Energy Systems Pvt. ltd with a solar photovoltaic(PV) potential 151.2 kWp for first phase and it will extend up to 458.6 kWp in three phases. By installing solar system the firm saves to millions of rupees in bills of grid and also contributes towards green environment by reducing foot print of carbon dioxide emission from other power generation techniques. This paper provides a techno commercial feasibility of the implementation of the project and environmental friendly impact of such projects on global warming and ozone layer as well as the also shows that in future to reduce the dependency over energy sector and move towards self-reliance in generating greener and cleaner energy. Institute of Electrical and Electronics Engineers Inc. 2018-03-09 Proceeding Paper PeerReviewed application/pdf en http://irep.iium.edu.my/72881/7/72881_Techno-commercial%20feasibility%20of%20grid-tied_complete_new.pdf application/pdf en http://irep.iium.edu.my/72881/1/72881_Techno-commercial%20feasibility%20of%20grid-tied_scopus.pdf Manzoor, Zahid and Shahid, Zeeshan and Khan, Sheroz and Hwang, John Tan Teng (2018) Techno-commercial feasibility of grid-tied solar system in philips morris pvt ltd (commercial building) of Pakistan. In: 4th IEEE International Conference on Smart Instrumentation, Measurement and Applications, ICSIMA 2017, 28 - 30 November 2017;, Putrajaya. https://ieeexplore.ieee.org/document/8312020 10.1109/ICSIMA.2017.8312020 |
| spellingShingle | TA Engineering (General). Civil engineering (General) TK Electrical engineering. Electronics Nuclear engineering Manzoor, Zahid Shahid, Zeeshan Khan, Sheroz Hwang, John Tan Teng Techno-commercial feasibility of grid-tied solar system in philips morris pvt ltd (commercial building) of Pakistan |
| title | Techno-commercial feasibility of grid-tied solar system in philips morris pvt ltd (commercial building) of Pakistan |
| title_full | Techno-commercial feasibility of grid-tied solar system in philips morris pvt ltd (commercial building) of Pakistan |
| title_fullStr | Techno-commercial feasibility of grid-tied solar system in philips morris pvt ltd (commercial building) of Pakistan |
| title_full_unstemmed | Techno-commercial feasibility of grid-tied solar system in philips morris pvt ltd (commercial building) of Pakistan |
| title_short | Techno-commercial feasibility of grid-tied solar system in philips morris pvt ltd (commercial building) of Pakistan |
| title_sort | techno-commercial feasibility of grid-tied solar system in philips morris pvt ltd (commercial building) of pakistan |
| topic | TA Engineering (General). Civil engineering (General) TK Electrical engineering. Electronics Nuclear engineering |
| url | http://irep.iium.edu.my/72881/ http://irep.iium.edu.my/72881/ http://irep.iium.edu.my/72881/ http://irep.iium.edu.my/72881/7/72881_Techno-commercial%20feasibility%20of%20grid-tied_complete_new.pdf http://irep.iium.edu.my/72881/1/72881_Techno-commercial%20feasibility%20of%20grid-tied_scopus.pdf |