Implication of incomplete contract (IC) Malaysian private finance initiative (PFI)
Theoretically, contracts are inevitably incomplete. Incomplete contract (IC) is characterized by the absence of clearly defined, in its entirety, ex-ante the parties’ requirements, rights and obligations and there are gaps, missing provisions, and ambiguities in its terms. On the one hand, IC expose...
| Main Authors: | Mansor, Nur Syaimasyaza, Abdul Rashid, Khairuddin, Ayob, Mohd Fairullazi, Hasan, Sharina Farihah |
|---|---|
| Format: | Article |
| Language: | English English |
| Published: |
Construction Research Institute of Malaysia (CREAM)
2019
|
| Subjects: | |
| Online Access: | http://irep.iium.edu.my/65910/ http://irep.iium.edu.my/65910/1/65910_Implication%20of%20incomplete%20contract.pdf http://irep.iium.edu.my/65910/2/65910_Implication%20of%20incomplete%20contract_SCOPUS.pdf |
Similar Items
Application of modified delphi in identifying the presence of Incomplete Contract (IC) in Private Finance Initiative (PFI) Projects
by: Mansor, Syaimasyaza, et al.
Published: (2017)
by: Mansor, Syaimasyaza, et al.
Published: (2017)
Incomplete contract in private finance initiative(PFI): a modified Delphi study
by: Mansor, Nur Syaimasyaza, et al.
Published: (2016)
by: Mansor, Nur Syaimasyaza, et al.
Published: (2016)
Incomplete contract in private finance initiative(PFI): a modified Delphi study
by: Mansor, Nur Syaimasyaza, et al.
Published: (2017)
by: Mansor, Nur Syaimasyaza, et al.
Published: (2017)
Pros and cons of incomplete contract in Private Finance Initiative (PFI) Project
by: Mansor, Syaimasyaza, et al.
Published: (2019)
by: Mansor, Syaimasyaza, et al.
Published: (2019)
Investigation of quality of cost data for life cycle cost analysis in university building maintenance
by: Bidi, Nor Khalisah, et al.
Published: (2015)
by: Bidi, Nor Khalisah, et al.
Published: (2015)
Current status of life cycle cost practice in Malaysian construction industry
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Investigation on reliability and validity of Life Cycle Cost (LCC) data inputs of building
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Investigation on quality of cost data input in Life Cycle Cost (LCC) analysis in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Protocol of Life Cycle Cost (LCC) data input requirements process
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Identification of cost data input problems in life cycle cost analysis and the mitigation strategies
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
Identifying methodology to investigate cost data input in life cycle cost analysis of a building
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
Strategies to enhance quality data input requirements of life cycle cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
Investigation of quality of cost data input in Life Cycle Cost (LCC) analysis in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Protocol of Life Cycle Cost (LCC) data input requirements process
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
A life cycle cost analysis system and method
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Constraint of the results of modified Delphi study on enhancing the quality data input requirements of Life Cycle Cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
Issues on data availability, accessibility, currency and its reliability as inputs in the LCC studies in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2012)
by: Ayob, Mohd Fairullazi, et al.
Published: (2012)
Proposing a methodology to investigate the reliability and validity of data inputs for building (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
Investigating the reliability and validity of data inputs for building life cycle cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
Strategies to enhance quality data input requirements of life cycle cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
A literature review on the state and practice of life cycle cost (LCC) in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
Identification of cost data input in life cycle cost (LCC) for building projects
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
Life cycle cost
by: Abdul Rashid, Khairuddin, et al.
Published: (2016)
by: Abdul Rashid, Khairuddin, et al.
Published: (2016)
Busines development opportunities through pursuit of joint-venture initiatives in construction
by: Preece, Christopher Nigel, et al.
Published: (2010)
by: Preece, Christopher Nigel, et al.
Published: (2010)
Cost and contract administration in construction: divine perspectives
Published: (2016)
Published: (2016)
BIM: the mapping of the QS’s role in contract
administration
by: Abdullah Habib, Siti Nora Haryati
Published: (2018)
by: Abdullah Habib, Siti Nora Haryati
Published: (2018)
Framework for a standard form of joint venture agreement for construction works
by: Abdul Rashid, Khairuddin, et al.
Published: (2010)
by: Abdul Rashid, Khairuddin, et al.
Published: (2010)
Review on the fundamental usage of Bills of Quantities (BQ) by contracting organisations
by: Bandi, Shamsul Hadi, et al.
Published: (2014)
by: Bandi, Shamsul Hadi, et al.
Published: (2014)
PFI: is Malaysia ready?
by: Abdul Rashid, Khairuddin
Published: (2009)
by: Abdul Rashid, Khairuddin
Published: (2009)
The consequence of inadequate design on building maintenance potential
by: Eusuf, Muhammad Abu, et al.
Published: (2010)
by: Eusuf, Muhammad Abu, et al.
Published: (2010)
Review of methodology designed to investigate quality of cost data input in life cycle cost
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Life Cycle Cost (LCC) strategy and protocol on cost data input in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Quantity surveyors and their competencies in the provision of PFI services
by: Khairuddin, Samer Shahedza, et al.
Published: (2016)
by: Khairuddin, Samer Shahedza, et al.
Published: (2016)
Recapitulating the issues concerning the application of the bills of quantities
by: Bandi, Shamsul Hadi, et al.
Published: (2014)
by: Bandi, Shamsul Hadi, et al.
Published: (2014)
Research into Bills of Quantities (BQ): where can it be focused?
by: Bandi, Shamsul Hadi, et al.
Published: (2015)
by: Bandi, Shamsul Hadi, et al.
Published: (2015)
Bills of Quantities (BQ) decrypted: uncovering research findings on BQ information requirements and the way forward
by: Bandi, Shamsul Hadi, et al.
Published: (2015)
by: Bandi, Shamsul Hadi, et al.
Published: (2015)
Documenting its applications in quantity surveying research: a review
by: Bandi, Shamsul Hadi, et al.
Published: (2016)
by: Bandi, Shamsul Hadi, et al.
Published: (2016)
Malaysian labour productivity for reinforced concrete structural frame: a case study
by: Ali, Maisarah, et al.
Published: (2012)
by: Ali, Maisarah, et al.
Published: (2012)
Bills of quantities: raison d’etre?
by: Bandi, Shamsul Hadi
Published: (2011)
by: Bandi, Shamsul Hadi
Published: (2011)
Conceptualizing issues relating to the bills of quantities
by: Bandi, Shamsul Hadi, et al.
Published: (2012)
by: Bandi, Shamsul Hadi, et al.
Published: (2012)
Similar Items
-
Application of modified delphi in identifying the presence of Incomplete Contract (IC) in Private Finance Initiative (PFI) Projects
by: Mansor, Syaimasyaza, et al.
Published: (2017) -
Incomplete contract in private finance initiative(PFI): a modified Delphi study
by: Mansor, Nur Syaimasyaza, et al.
Published: (2016) -
Incomplete contract in private finance initiative(PFI): a modified Delphi study
by: Mansor, Nur Syaimasyaza, et al.
Published: (2017) -
Pros and cons of incomplete contract in Private Finance Initiative (PFI) Project
by: Mansor, Syaimasyaza, et al.
Published: (2019) -
Investigation of quality of cost data for life cycle cost analysis in university building maintenance
by: Bidi, Nor Khalisah, et al.
Published: (2015)