Life cycle cost analysis: beginning stage (Part 1)
This is the 1st part of Teaching Modules of LCC Analysis for beginners to learn the practice of Life Cycle Cost (LCC) Analysis.
| Main Author: | Ayob, Mohd Fairullazi |
|---|---|
| Format: | Patent |
| Language: | English English |
| Published: |
2017
|
| Subjects: | |
| Online Access: | http://irep.iium.edu.my/57595/ http://irep.iium.edu.my/57595/1/LCC%20TRAINING%20MODULE%201%2024042017.pdf http://irep.iium.edu.my/57595/2/Copyright%20Registration%2BCR1%20LY2017001416.pdf |
Similar Items
Life Cycle Cost Analysis: Beginning Stage (Part 2)
by: Ayob, Mohd Fairullazi
Published: (2017)
by: Ayob, Mohd Fairullazi
Published: (2017)
Life cycle cost (beginning) to procurement managers
by: Ayob, Mohd Fairullazi
Published: (2019)
by: Ayob, Mohd Fairullazi
Published: (2019)
EPM 102(2) - EKONOMI KEJURUTERAAN APRIL 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
EEK 475 ECONOMY AND MANAGEMENT ON POWER SYSTEM (JAN 2016)
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2011/2012 Academic Session June 2012 EPM 102/2 – Engineering Economy [Ekonomi Kejuruteraan] Duration: 2 hours [Masa: 2 jam]
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)
EUP 201 - EKONOMI KEJURUTERAAN APRIL 1997.
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (1997)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (1997)
Forecasting currency in circulation in Malaysia using arch and garch models
by: Abdul Razak, Nur Azreen, et al.
Published: (2018)
by: Abdul Razak, Nur Azreen, et al.
Published: (2018)
Review of methodology designed to investigate quality of cost data input in life cycle cost
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Impact of blockchain technology on green supply chain practices: evidence from emerging economy
by: Mubarik, Mobashar, et al.
Published: (2021)
by: Mubarik, Mobashar, et al.
Published: (2021)
Life cycle cost for construction projects
by: Ayob, Mohd Fairullazi
Published: (2018)
by: Ayob, Mohd Fairullazi
Published: (2018)
A study on quality of cost data in Life Cycle Cost analysis of maintenance during the in-use phases of university building
by: Bidi, Nor Khalisah, et al.
Published: (2020)
by: Bidi, Nor Khalisah, et al.
Published: (2020)
A system for road pavement Life Cycle Cost (LCC) analysis
by: Ayob, Mohd Fairullazi, et al.
Published: (2019)
by: Ayob, Mohd Fairullazi, et al.
Published: (2019)
Technical and economic feasibility of sensor technology
for health/environmental condition monitoring
by: Karim, A.N. Mustafizul, et al.
Published: (2014)
by: Karim, A.N. Mustafizul, et al.
Published: (2014)
Identification of cost data inputs in Life Cycle Cost (LCC) of alternative road pavement types
by: Ayob, Mohd Fairullazi, et al.
Published: (2017)
by: Ayob, Mohd Fairullazi, et al.
Published: (2017)
EBB201/3 – ENGINEERING ECONOMY AND MANAGEMENT [ EKONOMI DAN PENGURUSAN KEJURUTERAAN] (AUGUST 2017)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2017)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2017)
Simulation study on various shapes of pad footing sub-structure on Batu Pahat soft soil
by: Adon @ Mohd Don, Rashidah
Published: (2009)
by: Adon @ Mohd Don, Rashidah
Published: (2009)
Life cycle cost for construction projects. Input lecture for AAR 7453 Professional Practice 1, (Master of Architecture Programme)
by: Ayob, Mohd Fairullazi
Published: (2019)
by: Ayob, Mohd Fairullazi
Published: (2019)
Artificial intelligent based damping controller optimization for the multimachine power system: a review
by: Hannan, Muhammad Abdul, et al.
Published: (2018)
by: Hannan, Muhammad Abdul, et al.
Published: (2018)
A review on the state of cost data inputs of Life Cycle Cost (LCC) for rigid pavement maintenance and rehabilitation in Malaysia
by: Ahmad Jasmi, Siti Zulaiha, et al.
Published: (2018)
by: Ahmad Jasmi, Siti Zulaiha, et al.
Published: (2018)
A method and system for road pavement life cycle cost analysis
by: Ayob, Mohd Fairullazi, et al.
Published: (2017)
by: Ayob, Mohd Fairullazi, et al.
Published: (2017)
A review on the quality of data inputs in life cycle cost analysis of rigid pavement maintenance in Malaysia
by: Ahmad Jasmi, Siti Zulaiha, et al.
Published: (2017)
by: Ahmad Jasmi, Siti Zulaiha, et al.
Published: (2017)
Protocol of Life Cycle Cost (LCC) data input requirements process of road pavement types.
by: Ayob, Mohd Fairullazi, et al.
Published: (2017)
by: Ayob, Mohd Fairullazi, et al.
Published: (2017)
Investigating the compatibility of affordable housing with sustainability criteria: a conceptual framework
by: Olanrewaju, AbdulLateef, et al.
Published: (2016)
by: Olanrewaju, AbdulLateef, et al.
Published: (2016)
A methodology to investigate the readiness of cost data inputs for the estimation of total cost of a new flexible pavement construction in Malaysia
by: Bidi, Nor Khalisah, et al.
Published: (2017)
by: Bidi, Nor Khalisah, et al.
Published: (2017)
Creating a new normal for AFM services: 3D laser scanning to BIM for LCC application on built asset
by: Hazumi, Hazman, et al.
Published: (2018)
by: Hazumi, Hazman, et al.
Published: (2018)
Comparative study of life cycle cost and pavement performance on road rehabilitation methods
by: Ayob, Mohd Fairullazi, et al.
Published: (2015)
by: Ayob, Mohd Fairullazi, et al.
Published: (2015)
Investigation of quality of data input in life cycle cost analysis of rigid pavement type
by: Ahmad Jasmi, Siti Zulaiha, et al.
Published: (2015)
by: Ahmad Jasmi, Siti Zulaiha, et al.
Published: (2015)
Life cycle cost analysis case study on corrosion remedial measures for concrete structures
by: Ho, Jin How, et al.
Published: (2004)
by: Ho, Jin How, et al.
Published: (2004)
Investigation of Life Cycle Cost (LCC) data inputs of flexible pavement in Klang Valley
by: Bidi, Nor Khalisah, et al.
Published: (2015)
by: Bidi, Nor Khalisah, et al.
Published: (2015)
Life cycle cost analysis for the repair of a ferry terminal jetty structure
by: Sabtu@Othman, Hilyati
Published: (2009)
by: Sabtu@Othman, Hilyati
Published: (2009)
Impact of project crashing on construction cost / Nurulazmin Nadzari
by: Nadzari, Nurulazmin
Published: (2006)
by: Nadzari, Nurulazmin
Published: (2006)
Optimal nuclear trigeneration system considering life cycle costing
by: Khairulnadzmi, Jamaluddin, et al.
Published: (2022)
by: Khairulnadzmi, Jamaluddin, et al.
Published: (2022)
Life cycle cost
by: Abdul Rashid, Khairuddin, et al.
Published: (2016)
by: Abdul Rashid, Khairuddin, et al.
Published: (2016)
Life cycle cost and performance assessment: comparison between reconstruction and cold-in-place recycling (CIPR) methods
by: Ayob, Mohd Fairullazi, et al.
Published: (2017)
by: Ayob, Mohd Fairullazi, et al.
Published: (2017)
Leachate filtration by using low cost material / Farahdilla Ahmad Fauzy
by: Ahmad Fauzy, Farahdilla
Published: (2006)
by: Ahmad Fauzy, Farahdilla
Published: (2006)
A life cycle cost analysis system and method
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Investigation of quality of cost data for life cycle cost analysis in university building maintenance
by: Bidi, Nor Khalisah, et al.
Published: (2015)
by: Bidi, Nor Khalisah, et al.
Published: (2015)
Investigation on quality of cost data input in Life Cycle Cost (LCC) analysis in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Identification of cost data input problems in life cycle cost analysis and the mitigation strategies
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
Investigation of quality of cost data input in Life Cycle Cost (LCC) analysis in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Similar Items
-
Life Cycle Cost Analysis: Beginning Stage (Part 2)
by: Ayob, Mohd Fairullazi
Published: (2017) -
Life cycle cost (beginning) to procurement managers
by: Ayob, Mohd Fairullazi
Published: (2019) -
EPM 102(2) - EKONOMI KEJURUTERAAN APRIL 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007) -
EEK 475 ECONOMY AND MANAGEMENT ON POWER SYSTEM (JAN 2016)
by: PPKEE, Pusat Pengajian Kejuruteraan Elektrik & Elektronik -
UNIVERSITI SAINS MALAYSIA Second Semester Examination
2011/2012 Academic Session June 2012 EPM 102/2 – Engineering Economy [Ekonomi Kejuruteraan] Duration: 2 hours [Masa: 2 jam]
by: Mekanik, Pusat Pengajian Kejuruteraan
Published: (2012)