Fuzzy risk analysis for construction projects
The construction industry projects are more subjective and risky compared with the others industries because of the unique characteristics of construction activities such as poor working condition, the significant frequency of accidents and the occupational risky situation. Risk analysis and managem...
| Main Authors: | Chaher, Zid, Soomro, Ali Raza |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
2016
|
| Subjects: | |
| Online Access: | http://irep.iium.edu.my/52502/ http://irep.iium.edu.my/52502/1/WASJ%20Fuzzy%20Risk%20Analysis.pdf |
Similar Items
Risk analysis model for construction projects using fuzzy logic
by: Chaher, Zid Chaher, et al.
Published: (2016)
by: Chaher, Zid Chaher, et al.
Published: (2016)
Facilitate risk management in construction process by using hierarchical risk breakdown structure
by: Chaher, Zid Chaher, et al.
Published: (2016)
by: Chaher, Zid Chaher, et al.
Published: (2016)
Best project management practice to attain project success, based on the success criteria
by: Chaher, Zid Chaher, et al.
Published: (2017)
by: Chaher, Zid Chaher, et al.
Published: (2017)
Conflicts and delays in mega construction projects – Kuwait International Airport Cargo City
by: Alazemi, Mohammad KhTh E, et al.
Published: (2019)
by: Alazemi, Mohammad KhTh E, et al.
Published: (2019)
Construction project in Kuwait international airport cargo city: issue of conflict management
by: Mohammed Kh Th E, Aalazemi, et al.
Published: (2019)
by: Mohammed Kh Th E, Aalazemi, et al.
Published: (2019)
Conflict management of construction projects – a case study Kuwait International Airport Cargo City
by: Alazemi, Mohammad KhTh E, et al.
Published: (2019)
by: Alazemi, Mohammad KhTh E, et al.
Published: (2019)
Life cycle cost for construction projects
by: Ayob, Mohd Fairullazi
Published: (2018)
by: Ayob, Mohd Fairullazi
Published: (2018)
Scoping review on procurement and contractual risks affecting PPP housing construction project in Malaysia
by: Putri Zulaiha, Razi, et al.
Published: (2023)
by: Putri Zulaiha, Razi, et al.
Published: (2023)
Work safety behaviour model for improving safety in construction industry using Bayesian Network
by: Zid, Chaher
Published: (2020)
by: Zid, Chaher
Published: (2020)
EPE 431 PROJECT MANAGEMENT (DEC 2015)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
EPM 432 – Project Management (Pengurusan Projek)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2024)
by: PPKAW, Pusat Pengajian Kejuruteraan Awam
Published: (2024)
Risk attitudes and the big five personality traits: A study on construction project practitioners in Malaysia
by: Lee, Chia Kuang, et al.
Published: (2020)
by: Lee, Chia Kuang, et al.
Published: (2020)
Causes and effects of delay in the construction project
by: Nurshapika Adila, Adnan
Published: (2018)
by: Nurshapika Adila, Adnan
Published: (2018)
EPM 361E(3) - PROJECT MANAGEMENT OCT-NOV 07.
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
by: PPKM, Pusat Pengajian Kejuruteraan Mekanikal
Published: (2007)
Identifying the indicators of premature starts in construction projects
by: Nur Fatin Izzati, Yusoff
Published: (2019)
by: Nur Fatin Izzati, Yusoff
Published: (2019)
The impact of weather condition to construction project in Malaysia
by: Nur Shahirah, Abu Hassan Asaari
Published: (2018)
by: Nur Shahirah, Abu Hassan Asaari
Published: (2018)
A review of causes of delay in construction projects
by: Al-Mohammad, Mohammad, et al.
Published: (2018)
by: Al-Mohammad, Mohammad, et al.
Published: (2018)
Influence of technical challenges on construction project contracting
by: Coleman, Charles Egyabeng, et al.
Published: (2025)
by: Coleman, Charles Egyabeng, et al.
Published: (2025)
Qualitative analysis on the barriers of industrialised building system (IBS) uptake in Malaysian construction projects
by: Nawi, M.N.M, et al.
Published: (2015)
by: Nawi, M.N.M, et al.
Published: (2015)
BIM in Kenyan construction industry: Benefits, challenges, and adoption processes in sustainable construction projects
by: Alakhali, Ahmed K., et al.
Published: (2024)
by: Alakhali, Ahmed K., et al.
Published: (2024)
Underlying causes of construction project delay: A review
by: Romzi, N. A., et al.
Published: (2022)
by: Romzi, N. A., et al.
Published: (2022)
Determining the basic principles in managing project schedule for construction.
by: Mohammad, Mohammad Ibrahim, et al.
Published: (2005)
by: Mohammad, Mohammad Ibrahim, et al.
Published: (2005)
The Application of Technology in Enhancing Safety and Health Aspects on Malaysian Construction Projects
by: Nurhidayah, Azmy, et al.
Published: (2016)
by: Nurhidayah, Azmy, et al.
Published: (2016)
Investigating the relationship between site supervision and IBS based construction projects
by: Saad, M. Syamsyul H., et al.
Published: (2019)
by: Saad, M. Syamsyul H., et al.
Published: (2019)
Assessment of construction planning of new project : Medan Ikan Bakar case study
by: Siti Farahanum, Ab Rahim
Published: (2018)
by: Siti Farahanum, Ab Rahim
Published: (2018)
Value engineering in developing countries
by: Eusuf, Muhammad Abu, et al.
Published: (2015)
by: Eusuf, Muhammad Abu, et al.
Published: (2015)
Report on the guide lines to the diagnosis of leaking of library building at IIUM
by: Eusuf, Muhammad Abu
Published: (2017)
by: Eusuf, Muhammad Abu
Published: (2017)
Integrated Scheduled Waste Management System in Kuala Lumpur using Expert System
by: Kabbashi, Nassereldeen Ahmed, et al.
Published: (2011)
by: Kabbashi, Nassereldeen Ahmed, et al.
Published: (2011)
Modeling the construction readiness parameters for abandoned housing projects in Malaysia: PLS-SEM approach
by: N. Aishah, Abdul-Rahman, et al.
Published: (2024)
by: N. Aishah, Abdul-Rahman, et al.
Published: (2024)
Modeling workplace well-being factors in infrastructure construction projects: PLS-SEM approach
by: Alhammadi, Yasir, et al.
Published: (2024)
by: Alhammadi, Yasir, et al.
Published: (2024)
Incorporation of risk index for risk response and risk mitigation strategies of public-private partnership (PPP) housing construction project in Malaysia
by: P. Z., Razi, et al.
Published: (2019)
by: P. Z., Razi, et al.
Published: (2019)
Effects Of Contractors’ Delay Factors On Building Project Performance Among Kuantan Malaysian Construction Industry
by: N.S.A, Samsudin, et al.
Published: (2020)
by: N.S.A, Samsudin, et al.
Published: (2020)
Key drivers for adopting design-build: a comparison study among construction project stakeholders
by: Z. P., Lee, et al.
Published: (2020)
by: Z. P., Lee, et al.
Published: (2020)
Investigating the interrelationships between advanced technologies and safety performance factors: The case of higher education construction projects
by: Alhammadi, Yasir, et al.
Published: (2024)
by: Alhammadi, Yasir, et al.
Published: (2024)
The probabilistic of abandoned project status using ordinal logistic regression analysis
by: Salam, Saidah An’nisaa, et al.
Published: (2023)
by: Salam, Saidah An’nisaa, et al.
Published: (2023)
Statistical analysis of cyclic performance of fire resistant door set in shopping Centre in Malaysia
by: Ali, Maisarah
Published: (2012)
by: Ali, Maisarah
Published: (2012)
A Fuzzy-based Risk Model for Construction Project Management
by: Chaher, Zid, et al.
Published: (2018)
by: Chaher, Zid, et al.
Published: (2018)
Simulation of modular construction and cost analysis for the Martian building
by: Tung, Chee Fong
Published: (2024)
by: Tung, Chee Fong
Published: (2024)
Implications of Construction 4.0 technologies to enhancing well-being : A fuzzy TOPSIS evaluation
by: Hazwani, Shafei, et al.
Published: (2025)
by: Hazwani, Shafei, et al.
Published: (2025)
Critical factors influencing construction technology adoption: A multivariate analysis
by: Fakhira, Khudzari, et al.
Published: (2023)
by: Fakhira, Khudzari, et al.
Published: (2023)
Similar Items
-
Risk analysis model for construction projects using fuzzy logic
by: Chaher, Zid Chaher, et al.
Published: (2016) -
Facilitate risk management in construction process by using hierarchical risk breakdown structure
by: Chaher, Zid Chaher, et al.
Published: (2016) -
Best project management practice to attain project success, based on the success criteria
by: Chaher, Zid Chaher, et al.
Published: (2017) -
Conflicts and delays in mega construction projects – Kuwait International Airport Cargo City
by: Alazemi, Mohammad KhTh E, et al.
Published: (2019) -
Construction project in Kuwait international airport cargo city: issue of conflict management
by: Mohammed Kh Th E, Aalazemi, et al.
Published: (2019)