Life Cycle Cost (LCC) strategy and protocol on cost data input in Malaysia
There is a need to develop a clear procedure on the acquisition of cost data inputs of LCC and that procedure is best translated in the form of protocol. A protocol of LCC data input requirements process was developed, evaluated, validated and tested with a group of LCC experts through FGD approach...
| Main Authors: | Ayob, Mohd Fairullazi, Abdul Rashid, Khairuddin |
|---|---|
| Format: | Proceeding Paper |
| Language: | English English |
| Published: |
2016
|
| Subjects: | |
| Online Access: | http://irep.iium.edu.my/50726/ http://irep.iium.edu.my/50726/1/Brown_Paper_Bag_Seminar-FINAL_Version.pdf http://irep.iium.edu.my/50726/2/DR.FAIRUL-LCC_DATA_INPUT_PRESENTATION_250416.pdf |
Similar Items
Protocol of Life Cycle Cost (LCC) data input requirements process
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Protocol of Life Cycle Cost (LCC) data input requirements process
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Identification of cost data input in life cycle cost (LCC) for building projects
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
Strategies to enhance quality data input requirements of life cycle cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
Strategies to enhance quality data input requirements of life cycle cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
Investigation on quality of cost data input in Life Cycle Cost (LCC) analysis in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Investigation of quality of cost data input in Life Cycle Cost (LCC) analysis in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Investigation on reliability and validity of Life Cycle Cost (LCC) data inputs of building
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Investigating the reliability and validity of data inputs for building life cycle cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
Constraint of the results of modified Delphi study on enhancing the quality data input requirements of Life Cycle Cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
A literature review on the state and practice of life cycle cost (LCC) in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
Identification of cost data input problems in life cycle cost analysis and the mitigation strategies
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
Identifying methodology to investigate cost data input in life cycle cost analysis of a building
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
A life cycle cost analysis system and method
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Proposing a methodology to investigate the reliability and validity of data inputs for building (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
Issues on data availability, accessibility, currency and its reliability as inputs in the LCC studies in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2012)
by: Ayob, Mohd Fairullazi, et al.
Published: (2012)
Current status of life cycle cost practice in Malaysian construction industry
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Life cycle cost
by: Abdul Rashid, Khairuddin, et al.
Published: (2016)
by: Abdul Rashid, Khairuddin, et al.
Published: (2016)
Review of methodology designed to investigate quality of cost data input in life cycle cost
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Investigation of quality of cost data for life cycle cost analysis in university building maintenance
by: Bidi, Nor Khalisah, et al.
Published: (2015)
by: Bidi, Nor Khalisah, et al.
Published: (2015)
Life cycle cost for construction projects
by: Ayob, Mohd Fairullazi
Published: (2018)
by: Ayob, Mohd Fairullazi
Published: (2018)
Cost and contract administration in construction: divine perspectives
Published: (2016)
Published: (2016)
The Factors Affecting The Cost Estimating In
Pre-Construction Process
by: Mohamad, Yusmawati
Published: (2006)
by: Mohamad, Yusmawati
Published: (2006)
Framework for a standard form of joint venture agreement for construction works
by: Abdul Rashid, Khairuddin, et al.
Published: (2010)
by: Abdul Rashid, Khairuddin, et al.
Published: (2010)
Pros and cons of incomplete contract in Private Finance Initiative (PFI) Project
by: Mansor, Syaimasyaza, et al.
Published: (2019)
by: Mansor, Syaimasyaza, et al.
Published: (2019)
BIM: the mapping of the QS’s role in contract
administration
by: Abdullah Habib, Siti Nora Haryati
Published: (2018)
by: Abdullah Habib, Siti Nora Haryati
Published: (2018)
Recapitulating the issues concerning the application of the bills of quantities
by: Bandi, Shamsul Hadi, et al.
Published: (2014)
by: Bandi, Shamsul Hadi, et al.
Published: (2014)
Research into Bills of Quantities (BQ): where can it be focused?
by: Bandi, Shamsul Hadi, et al.
Published: (2015)
by: Bandi, Shamsul Hadi, et al.
Published: (2015)
Bills of Quantities (BQ) decrypted: uncovering research findings on BQ information requirements and the way forward
by: Bandi, Shamsul Hadi, et al.
Published: (2015)
by: Bandi, Shamsul Hadi, et al.
Published: (2015)
Documenting its applications in quantity surveying research: a review
by: Bandi, Shamsul Hadi, et al.
Published: (2016)
by: Bandi, Shamsul Hadi, et al.
Published: (2016)
Busines development opportunities through pursuit of joint-venture initiatives in construction
by: Preece, Christopher Nigel, et al.
Published: (2010)
by: Preece, Christopher Nigel, et al.
Published: (2010)
Malaysian labour productivity for reinforced concrete structural frame: a case study
by: Ali, Maisarah, et al.
Published: (2012)
by: Ali, Maisarah, et al.
Published: (2012)
Bills of quantities: raison d’etre?
by: Bandi, Shamsul Hadi
Published: (2011)
by: Bandi, Shamsul Hadi
Published: (2011)
Conceptualizing issues relating to the bills of quantities
by: Bandi, Shamsul Hadi, et al.
Published: (2012)
by: Bandi, Shamsul Hadi, et al.
Published: (2012)
Exploring issues on the usage of the Bills of Quantities (BQ) and identifying relevant research area
by: Bandi, Shamsul Hadi, et al.
Published: (2012)
by: Bandi, Shamsul Hadi, et al.
Published: (2012)
Understanding the challenges in sustaining the bills of quantities in Malaysia
by: Bandi, Shamsul Hadi, et al.
Published: (2012)
by: Bandi, Shamsul Hadi, et al.
Published: (2012)
Review on the fundamental usage of Bills of Quantities (BQ) by contracting organisations
by: Bandi, Shamsul Hadi, et al.
Published: (2014)
by: Bandi, Shamsul Hadi, et al.
Published: (2014)
Incomplete contract in private finance initiative(PFI): a modified Delphi study
by: Mansor, Nur Syaimasyaza, et al.
Published: (2016)
by: Mansor, Nur Syaimasyaza, et al.
Published: (2016)
Protocol of Life Cycle Cost (LCC) data input requirements process of road pavement types.
by: Ayob, Mohd Fairullazi, et al.
Published: (2017)
by: Ayob, Mohd Fairullazi, et al.
Published: (2017)
Determining The House Buyers Requirements For Green Homes In Malaysia
by: Ismail, Radzi
Published: (2012)
by: Ismail, Radzi
Published: (2012)
Similar Items
-
Protocol of Life Cycle Cost (LCC) data input requirements process
by: Ayob, Mohd Fairullazi, et al.
Published: (2016) -
Protocol of Life Cycle Cost (LCC) data input requirements process
by: Ayob, Mohd Fairullazi, et al.
Published: (2016) -
Identification of cost data input in life cycle cost (LCC) for building projects
by: Ayob, Mohd Fairullazi, et al.
Published: (2014) -
Strategies to enhance quality data input requirements of life cycle cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013) -
Strategies to enhance quality data input requirements of life cycle cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)