Life Cycle Cost (LCC) strategy and protocol on cost data input in Malaysia
There is a need to develop a clear procedure on the acquisition of cost data inputs of LCC and that procedure is best translated in the form of protocol. A protocol of LCC data input requirements process was developed, evaluated, validated and tested with a group of LCC experts through FGD approach...
| Main Authors: | , |
|---|---|
| Format: | Proceeding Paper |
| Language: | English English |
| Published: |
2016
|
| Subjects: | |
| Online Access: | http://irep.iium.edu.my/50726/ http://irep.iium.edu.my/50726/1/Brown_Paper_Bag_Seminar-FINAL_Version.pdf http://irep.iium.edu.my/50726/2/DR.FAIRUL-LCC_DATA_INPUT_PRESENTATION_250416.pdf |
| _version_ | 1848783706045546496 |
|---|---|
| author | Ayob, Mohd Fairullazi Abdul Rashid, Khairuddin |
| author_facet | Ayob, Mohd Fairullazi Abdul Rashid, Khairuddin |
| author_sort | Ayob, Mohd Fairullazi |
| building | IIUM Repository |
| collection | Online Access |
| description | There is a need to develop a clear procedure on the acquisition of cost data inputs of LCC and that procedure is best translated in the form of protocol. A protocol of LCC data input requirements process was developed, evaluated, validated and tested with a group of LCC experts through FGD approach to provide robust procedures on how the cost data could be made more available, accessible, current and reliable as inputs into the process of producing reliable LCC outputs in the Malaysian construction industry. The current findings can serve as a potential benchmark which could facilitate the clients, estimators and researchers in Malaysia and or in some other countries to calculate LCC better leading to better outputs
|
| first_indexed | 2025-11-14T16:25:36Z |
| format | Proceeding Paper |
| id | iium-50726 |
| institution | International Islamic University Malaysia |
| institution_category | Local University |
| language | English English |
| last_indexed | 2025-11-14T16:25:36Z |
| publishDate | 2016 |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | iium-507262018-05-23T01:56:18Z http://irep.iium.edu.my/50726/ Life Cycle Cost (LCC) strategy and protocol on cost data input in Malaysia Ayob, Mohd Fairullazi Abdul Rashid, Khairuddin T58.6 Management information systems TH Building construction TH4021 Buildings. Construction with reference to use. There is a need to develop a clear procedure on the acquisition of cost data inputs of LCC and that procedure is best translated in the form of protocol. A protocol of LCC data input requirements process was developed, evaluated, validated and tested with a group of LCC experts through FGD approach to provide robust procedures on how the cost data could be made more available, accessible, current and reliable as inputs into the process of producing reliable LCC outputs in the Malaysian construction industry. The current findings can serve as a potential benchmark which could facilitate the clients, estimators and researchers in Malaysia and or in some other countries to calculate LCC better leading to better outputs 2016-04-28 Proceeding Paper NonPeerReviewed application/pdf en http://irep.iium.edu.my/50726/1/Brown_Paper_Bag_Seminar-FINAL_Version.pdf application/pdf en http://irep.iium.edu.my/50726/2/DR.FAIRUL-LCC_DATA_INPUT_PRESENTATION_250416.pdf Ayob, Mohd Fairullazi and Abdul Rashid, Khairuddin (2016) Life Cycle Cost (LCC) strategy and protocol on cost data input in Malaysia. In: FIABCI Malaysia Brown Paper Bag Seminar: Data Input Requirements in Life Cycle Cost (LCC) Estimation 2016, 28th April 2016, International Islamic Universiti Malaysia (IIUM) Kuala Lumpur. (Unpublished) |
| spellingShingle | T58.6 Management information systems TH Building construction TH4021 Buildings. Construction with reference to use. Ayob, Mohd Fairullazi Abdul Rashid, Khairuddin Life Cycle Cost (LCC) strategy and protocol on cost data input in Malaysia |
| title | Life Cycle Cost (LCC) strategy and protocol on cost data input in Malaysia |
| title_full | Life Cycle Cost (LCC) strategy and protocol on cost data input in Malaysia |
| title_fullStr | Life Cycle Cost (LCC) strategy and protocol on cost data input in Malaysia |
| title_full_unstemmed | Life Cycle Cost (LCC) strategy and protocol on cost data input in Malaysia |
| title_short | Life Cycle Cost (LCC) strategy and protocol on cost data input in Malaysia |
| title_sort | life cycle cost (lcc) strategy and protocol on cost data input in malaysia |
| topic | T58.6 Management information systems TH Building construction TH4021 Buildings. Construction with reference to use. |
| url | http://irep.iium.edu.my/50726/ http://irep.iium.edu.my/50726/1/Brown_Paper_Bag_Seminar-FINAL_Version.pdf http://irep.iium.edu.my/50726/2/DR.FAIRUL-LCC_DATA_INPUT_PRESENTATION_250416.pdf |