Scheduling and batching in multi-site flexible flow shop environments
Global competition and the customers demand for customized products with shorter due dates, marked the introduction of the Extended Enterprise. In this Extended Manufacturing Environment (EME), lean, virtual, networked and distributed enterprises collaborate to respond to the market demands. In this...
| Main Authors: | Santos, A. S., Madureira, A. M., Varela, M. L. R., Putnik, G. D., Emrul Kays, H. M., Karim, A.N. Mustafizul |
|---|---|
| Format: | Proceeding Paper |
| Language: | English English |
| Published: |
IEEE
2015
|
| Subjects: | |
| Online Access: | http://irep.iium.edu.my/48778/ http://irep.iium.edu.my/48778/4/48778-Scheduling_and_batching_in_multi-Site_flexible_flow_shop_environments_Fullpaper.pdf http://irep.iium.edu.my/48778/7/48778_Scheduling%20and%20batching%20in%20multi-site_Scopus.pdf |
Similar Items
An integer programming approach for balancing and scheduling in extended manufacturing environment
by: Kays, H. M. E, et al.
Published: (2015)
by: Kays, H. M. E, et al.
Published: (2015)
Formulation of an IP-based model for reactive flow-shop scheduling problem subject to arrival of new orders
by: Abdesselam, M., et al.
Published: (2015)
by: Abdesselam, M., et al.
Published: (2015)
Formulation of integer programming model for balancing and
scheduling of production line having shared resources
by: Emrul Kays, H. M., et al.
Published: (2014)
by: Emrul Kays, H. M., et al.
Published: (2014)
Design of a heuristic for balancing a multi-stage production flow line
by: Kays, H. M. E., et al.
Published: (2015)
by: Kays, H. M. E., et al.
Published: (2015)
Managing risk in production scheduling under uncertain disruption
by: Sarker, Ruhul, et al.
Published: (2015)
by: Sarker, Ruhul, et al.
Published: (2015)
Multiple bottlenecks sorting criterion at initial sequence in solving permutation flow shop scheduling problem
by: N. A., Isa, et al.
Published: (2021)
by: N. A., Isa, et al.
Published: (2021)
Assessment of machining cost for end-milling of Ti-6Al-4V titanium alloy through RSM-based parametric model
by: Karim, A.N. Mustafizul, et al.
Published: (2014)
by: Karim, A.N. Mustafizul, et al.
Published: (2014)
Job shop scheduling problem (JSSP)
by: Abdullah, Nurul Azma
Published: (2004)
by: Abdullah, Nurul Azma
Published: (2004)
Bottleneck-based heuristic for three-machine flow shop scheduling
by: Abdul Rahim, Mohd Salleh
Published: (2011)
by: Abdul Rahim, Mohd Salleh
Published: (2011)
Forecasting demand: development of a fuzzy growth adjusted holt-winters approach
by: M., Abdesselam, et al.
Published: (2014)
by: M., Abdesselam, et al.
Published: (2014)
Flexible job shop scheduling using priority heuristics and genetic algorithm
by: Farashahi, Hamid Ghaani
Published: (2010)
by: Farashahi, Hamid Ghaani
Published: (2010)
Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
by: Sh Ahmad, Sh Salleh
Published: (2009)
by: Sh Ahmad, Sh Salleh
Published: (2009)
A collaborative multiplicative Holt-Winters forecasting approach with dynamic fuzzy-level component
by: Kays, H. M.Emrul, et al.
Published: (2018)
by: Kays, H. M.Emrul, et al.
Published: (2018)
A Modified Multi-Step Crossover Fusion (MSXF) In Solving Some Deterministic Job Shop Scheduling Problem (JSSP) [TS157.5. M214 2008 f rb].
by: Omar, Mahanim
Published: (2008)
by: Omar, Mahanim
Published: (2008)
A critical assessment of prevailing models for measuring
lean manufacturing
by: Khalili, Amjad, et al.
Published: (2016)
by: Khalili, Amjad, et al.
Published: (2016)
Soft total quality management and lean manufacturing initiatives: model development through structural equation modelling
by: Khalili, Amjad, et al.
Published: (2018)
by: Khalili, Amjad, et al.
Published: (2018)
Linkages of QMS and soft EMS: perceptions of
operations managers as modelled by SEM
by: Khalili, Amjad, et al.
Published: (2019)
by: Khalili, Amjad, et al.
Published: (2019)
Ranking of manufacturing attributes affecting bread quality: application of analytic hierarchy process
by: Nazri, M. N. B. A., et al.
Published: (2015)
by: Nazri, M. N. B. A., et al.
Published: (2015)
Development of Prototype Scheduling and Sequencing Software for Job Shop Manufacturing in Sheet Metal Fabrication
by: Mohamed Rasin, Mohamad Zaihirain
Published: (2002)
by: Mohamed Rasin, Mohamad Zaihirain
Published: (2002)
The master production schedule in MRP for microelectronic manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020)
by: Cheam, Kai Wen, et al.
Published: (2020)
Dynamic weighted idle time heuristic for flowshop scheduling
by: Zainudin, Amira Syuhada
Published: (2017)
by: Zainudin, Amira Syuhada
Published: (2017)
Schedule based material requirements planning: a case study of LCD TV manufacturer
by: Cheam, Kai Wen, et al.
Published: (2020)
by: Cheam, Kai Wen, et al.
Published: (2020)
Six sigma approach to improve the painting process: a case study of a Malaysian vehicle assembly company
by: Abd. Rahman, Mohamed, et al.
Published: (2014)
by: Abd. Rahman, Mohamed, et al.
Published: (2014)
Development of mathematical models for integration of lot sizing and flow shop scheduling with lot streaming
by: Mortezaei, Navid
Published: (2015)
by: Mortezaei, Navid
Published: (2015)
Adoption and adaptation of Japanese manufacturing management: a case study of an automotive company in Malaysia
by: Mohiuddin, A. K. M., et al.
Published: (2014)
by: Mohiuddin, A. K. M., et al.
Published: (2014)
A guided artificial bee colony (GABC) heuristic for permutation flowshop scheduling problem (PFSP)
by: Sidek, Noor Azizah
Published: (2021)
by: Sidek, Noor Azizah
Published: (2021)
Flowshop scheduling using artificial bee colony (ABC) algorithm with varying onlooker bees approaches
by: Mohd Pauzi, Nur Fazlinda
Published: (2015)
by: Mohd Pauzi, Nur Fazlinda
Published: (2015)
Assembly line productivity improvement as re-engineered by MOST
by: Karim, A.N. Mustafizul, et al.
Published: (2016)
by: Karim, A.N. Mustafizul, et al.
Published: (2016)
Hierarchical production planning and scheduling in a multi-product, batch process environment
by: Omar, M. K., et al.
Published: (2007)
by: Omar, M. K., et al.
Published: (2007)
Multi-objective optimisation methods for minimising total weighted tardiness, electricity consumption and electricity cost in job shops through scheduling
by: Liu, Ying
Published: (2014)
by: Liu, Ying
Published: (2014)
Minimizing makespan of multimachine production system in flow shop environment by means of mixed integer programming model
by: Abdul Rahman, Nur Salihah, et al.
Published: (2018)
by: Abdul Rahman, Nur Salihah, et al.
Published: (2018)
The framework of improving on-site materials tracking for inventory management process in construction projects
by: Liwan, Siti Radziah
Published: (2015)
by: Liwan, Siti Radziah
Published: (2015)
A Simulated Annealing-Based Hyper-Heuristic For The Flexible Job Shop Scheduling Problem
by: Kelvin, Lim Ching Wei
Published: (2023)
by: Kelvin, Lim Ching Wei
Published: (2023)
Optimized preference of security staff scheduling using integer linear programming approach
by: Ang, Shin Yin, et al.
Published: (2019)
by: Ang, Shin Yin, et al.
Published: (2019)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Ahmed, Fawad
Published: (2008)
by: Ahmed, Fawad
Published: (2008)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
Hybrid flow shop scheduling with energy consumption in machine shop using moth flame optimization
by: M. F. F., Ab Rashid, et al.
Published: (2022)
by: M. F. F., Ab Rashid, et al.
Published: (2022)
Tensile properties of Poly Lactic Acid (PLA)–Tungsten Trioxide (WO3) nano composites for 3D printing process
by: Shaath, M. L. M., et al.
Published: (2019)
by: Shaath, M. L. M., et al.
Published: (2019)
Training Simulator Batch Polystyrene Reactor
by: Shahidan, Mohd Syakir
Published: (2022)
by: Shahidan, Mohd Syakir
Published: (2022)
FDM preparation of bio-compatible UHMWPE polymer for artificial implant
by: Ramli, M. S., et al.
Published: (2016)
by: Ramli, M. S., et al.
Published: (2016)
Similar Items
-
An integer programming approach for balancing and scheduling in extended manufacturing environment
by: Kays, H. M. E, et al.
Published: (2015) -
Formulation of an IP-based model for reactive flow-shop scheduling problem subject to arrival of new orders
by: Abdesselam, M., et al.
Published: (2015) -
Formulation of integer programming model for balancing and
scheduling of production line having shared resources
by: Emrul Kays, H. M., et al.
Published: (2014) -
Design of a heuristic for balancing a multi-stage production flow line
by: Kays, H. M. E., et al.
Published: (2015) -
Managing risk in production scheduling under uncertain disruption
by: Sarker, Ruhul, et al.
Published: (2015)