Design of a heuristic for balancing a multi-stage production flow line
A production flow line balancing problem for automotive industry has been studied. A batch of an end item is produced by transforming sheet metals into parts at different manufacturing stages followed by assembly operations. The forming operations of the sheet metals into various parts and their ass...
| Main Authors: | Kays, H. M. E., Karim, A. N. M., Tajudin, M. N. B., Abdesselam, M. |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Trans Tech Publications, Switzerland
2015
|
| Subjects: | |
| Online Access: | http://irep.iium.edu.my/48673/ http://irep.iium.edu.my/48673/1/%2333_AMR.1115.610.pdf |
Similar Items
Formulation of integer programming model for balancing and
scheduling of production line having shared resources
by: Emrul Kays, H. M., et al.
Published: (2014)
by: Emrul Kays, H. M., et al.
Published: (2014)
Formulation of an IP-based model for reactive flow-shop scheduling problem subject to arrival of new orders
by: Abdesselam, M., et al.
Published: (2015)
by: Abdesselam, M., et al.
Published: (2015)
Scheduling and batching in multi-site flexible flow shop environments
by: Santos, A. S., et al.
Published: (2015)
by: Santos, A. S., et al.
Published: (2015)
An integer programming approach for balancing and scheduling in extended manufacturing environment
by: Kays, H. M. E, et al.
Published: (2015)
by: Kays, H. M. E, et al.
Published: (2015)
Assessment of machining cost for end-milling of Ti-6Al-4V titanium alloy through RSM-based parametric model
by: Karim, A.N. Mustafizul, et al.
Published: (2014)
by: Karim, A.N. Mustafizul, et al.
Published: (2014)
Bottleneck-based heuristic for three-machine flow shop scheduling
by: Abdul Rahim, Mohd Salleh
Published: (2011)
by: Abdul Rahim, Mohd Salleh
Published: (2011)
Bottleneck adjacent matching heuristics for scheduling a re-entrant flow shop with dominant machine problem
by: Sh Ahmad, Sh Salleh
Published: (2009)
by: Sh Ahmad, Sh Salleh
Published: (2009)
Improved classifier chain methods based on heuristic optimization techniques for multi-label classification problem
by: Oyekunle, Adeleke Abdullahi
Published: (2022)
by: Oyekunle, Adeleke Abdullahi
Published: (2022)
Ranking of manufacturing attributes affecting bread quality: application of analytic hierarchy process
by: Nazri, M. N. B. A., et al.
Published: (2015)
by: Nazri, M. N. B. A., et al.
Published: (2015)
Heuristics method for truck disassembly process
by: Yeoh, Kim Hao
Published: (2020)
by: Yeoh, Kim Hao
Published: (2020)
Assembly Line Balancing using Heuristic Approaches in Manufacturing Industry
by: Muhammad Razif, Abdullah Make, et al.
Published: (2017)
by: Muhammad Razif, Abdullah Make, et al.
Published: (2017)
Forecasting demand: development of a fuzzy growth adjusted holt-winters approach
by: M., Abdesselam, et al.
Published: (2014)
by: M., Abdesselam, et al.
Published: (2014)
Dynamic weighted idle time heuristic for flowshop scheduling
by: Zainudin, Amira Syuhada
Published: (2017)
by: Zainudin, Amira Syuhada
Published: (2017)
Managing risk in production scheduling under uncertain disruption
by: Sarker, Ruhul, et al.
Published: (2015)
by: Sarker, Ruhul, et al.
Published: (2015)
A guided artificial bee colony (GABC) heuristic for permutation flowshop scheduling problem (PFSP)
by: Sidek, Noor Azizah
Published: (2021)
by: Sidek, Noor Azizah
Published: (2021)
A three-stage methodology for design evaluation in product development
by: Mohd Turan, Faiz
Published: (2013)
by: Mohd Turan, Faiz
Published: (2013)
A critical assessment of prevailing models for measuring
lean manufacturing
by: Khalili, Amjad, et al.
Published: (2016)
by: Khalili, Amjad, et al.
Published: (2016)
Six sigma approach to improve the painting process: a case study of a Malaysian vehicle assembly company
by: Abd. Rahman, Mohamed, et al.
Published: (2014)
by: Abd. Rahman, Mohamed, et al.
Published: (2014)
Design optimization for the two-stage bivariate pattern recognition scheme
by: Mokhtar, Mohd Shukri
Published: (2015)
by: Mokhtar, Mohd Shukri
Published: (2015)
Adoption and adaptation of Japanese manufacturing management: a case study of an automotive company in Malaysia
by: Mohiuddin, A. K. M., et al.
Published: (2014)
by: Mohiuddin, A. K. M., et al.
Published: (2014)
Soft total quality management and lean manufacturing initiatives: model development through structural equation modelling
by: Khalili, Amjad, et al.
Published: (2018)
by: Khalili, Amjad, et al.
Published: (2018)
Linkages of QMS and soft EMS: perceptions of
operations managers as modelled by SEM
by: Khalili, Amjad, et al.
Published: (2019)
by: Khalili, Amjad, et al.
Published: (2019)
Multiple bottlenecks sorting criterion at initial sequence in solving permutation flow shop scheduling problem
by: N. A., Isa, et al.
Published: (2021)
by: N. A., Isa, et al.
Published: (2021)
A scheme for balanced monitoring and accurate diagnosis of bivariate process mean shifts
by: Masood, Ibrahim
Published: (2012)
by: Masood, Ibrahim
Published: (2012)
A review of assembly line balancing optimisation with energy consideration using meta-heuristic algorithms
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2021)
by: Mohd Fadzil Faisae, Ab Rashid, et al.
Published: (2021)
Line and wall follower hexapod robot
by: Ibrahim, Mohd Tarmizi
Published: (2011)
by: Ibrahim, Mohd Tarmizi
Published: (2011)
FORMULATION OF SLOW RELEASE COMPRESSED FERTILIZER AND INITIAL DESIGN FOR PRODUCTION SYSTEM
by: Mohd Radzi, H.C.D.
Published: (2017)
by: Mohd Radzi, H.C.D.
Published: (2017)
Precursor selection for carbon membrane fabrication: a review
by: Sazali, N., et al.
Published: (2018)
by: Sazali, N., et al.
Published: (2018)
Development of layout design and improvement of the working flow at Erul Food Industries
by: Tajurahim, Nurul Ainina Nadhirah, et al.
Published: (2020)
by: Tajurahim, Nurul Ainina Nadhirah, et al.
Published: (2020)
A study of micro to nano structure fine solid line printing for graphene ink by micro-flexographic printing method
by: Hassan, Suhaimi, et al.
Published: (2016)
by: Hassan, Suhaimi, et al.
Published: (2016)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Ahmed, Fawad
Published: (2008)
by: Ahmed, Fawad
Published: (2008)
Comparative Study Between Mixed Model Assembly Line And Flexible Assembly Line Based On Cost Minimization Approach [TS167. F278 2008 f rb].
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
by: Fawad Ahmed, Fawad Ahmed
Published: (2008)
Efficiency improvement of assembly line: case study of bus seat manufacturer
by: Yeoh, Kim Hao
Published: (2013)
by: Yeoh, Kim Hao
Published: (2013)
Utilizing rapid prototyping 3D printer for fabricating flexographic PDMS printing plate
by: Maksud, M. I., et al.
Published: (2016)
by: Maksud, M. I., et al.
Published: (2016)
The influence of injection molding parameter on properties of thermally conductive plastic
by: Azis, N. Hafizah, et al.
Published: (2017)
by: Azis, N. Hafizah, et al.
Published: (2017)
Tensile properties of Poly Lactic Acid (PLA)–Tungsten Trioxide (WO3) nano composites for 3D printing process
by: Shaath, M. L. M., et al.
Published: (2019)
by: Shaath, M. L. M., et al.
Published: (2019)
The impact of lean six sigma practices based on industrial revolution 4.0 towards balanced scorecard indicators in Malaysia manufacturing sector
by: Zamri, Shafeeka Fadlikh
Published: (2021)
by: Zamri, Shafeeka Fadlikh
Published: (2021)
Strategic factors on interpreting remanufacturing quality-
Certifying framework to address warranty aftermarket for
Malaysian industry
by: N, Mohamed, et al.
Published: (2018)
by: N, Mohamed, et al.
Published: (2018)
Integrated engineering project management Approach for typical small to medium manufacturing companies
by: Adesta, Erry Yulian Triblas, et al.
Published: (2017)
by: Adesta, Erry Yulian Triblas, et al.
Published: (2017)
Panduan proses pengauditan MS ISO 9001 di Institut Pendidikan Guru
by: R. Ratnam, R. Kalaivalli
Published: (2017)
by: R. Ratnam, R. Kalaivalli
Published: (2017)
Similar Items
-
Formulation of integer programming model for balancing and
scheduling of production line having shared resources
by: Emrul Kays, H. M., et al.
Published: (2014) -
Formulation of an IP-based model for reactive flow-shop scheduling problem subject to arrival of new orders
by: Abdesselam, M., et al.
Published: (2015) -
Scheduling and batching in multi-site flexible flow shop environments
by: Santos, A. S., et al.
Published: (2015) -
An integer programming approach for balancing and scheduling in extended manufacturing environment
by: Kays, H. M. E, et al.
Published: (2015) -
Assessment of machining cost for end-milling of Ti-6Al-4V titanium alloy through RSM-based parametric model
by: Karim, A.N. Mustafizul, et al.
Published: (2014)