Incomplete contract in private finance initiative(PFI): a modified Delphi study
Incomplete contract (IC) is a contract that fails to state all the parties’ rights and obligations, has gaps and ambiguities in its terms and conditions. Literature had discussed the reasons of IC are due to long duration of the contract, high risk and uncertainty, high transaction cost, bounded rat...
| Main Authors: | Mansor, Nur Syaimasyaza, Ayob, Mohd Fairullazi, Abdul Rashid, Khairuddin |
|---|---|
| Format: | Article |
| Language: | English English |
| Published: |
American Scientific Publishers
2017
|
| Subjects: | |
| Online Access: | http://irep.iium.edu.my/45973/ http://irep.iium.edu.my/45973/8/45973_Incomplete%20contract%20in%20private.pdf http://irep.iium.edu.my/45973/9/45973_Incomplete%20contract%20in%20private_SCOPUS.pdf |
Similar Items
Incomplete contract in private finance initiative(PFI): a modified Delphi study
by: Mansor, Nur Syaimasyaza, et al.
Published: (2016)
by: Mansor, Nur Syaimasyaza, et al.
Published: (2016)
Application of modified delphi in identifying the presence of Incomplete Contract (IC) in Private Finance Initiative (PFI) Projects
by: Mansor, Syaimasyaza, et al.
Published: (2017)
by: Mansor, Syaimasyaza, et al.
Published: (2017)
Implication of incomplete contract (IC) Malaysian private finance initiative (PFI)
by: Mansor, Nur Syaimasyaza, et al.
Published: (2019)
by: Mansor, Nur Syaimasyaza, et al.
Published: (2019)
Pros and cons of incomplete contract in Private Finance Initiative (PFI) Project
by: Mansor, Syaimasyaza, et al.
Published: (2019)
by: Mansor, Syaimasyaza, et al.
Published: (2019)
Investigation of quality of cost data for life cycle cost analysis in university building maintenance
by: Bidi, Nor Khalisah, et al.
Published: (2015)
by: Bidi, Nor Khalisah, et al.
Published: (2015)
Constraint of the results of modified Delphi study on enhancing the quality data input requirements of Life Cycle Cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
Life cycle cost
by: Abdul Rashid, Khairuddin, et al.
Published: (2016)
by: Abdul Rashid, Khairuddin, et al.
Published: (2016)
Current status of life cycle cost practice in Malaysian construction industry
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Investigation on reliability and validity of Life Cycle Cost (LCC) data inputs of building
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Investigation on quality of cost data input in Life Cycle Cost (LCC) analysis in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Protocol of Life Cycle Cost (LCC) data input requirements process
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Identification of cost data input problems in life cycle cost analysis and the mitigation strategies
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
Identifying methodology to investigate cost data input in life cycle cost analysis of a building
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
Strategies to enhance quality data input requirements of life cycle cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
Investigation of quality of cost data input in Life Cycle Cost (LCC) analysis in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Protocol of Life Cycle Cost (LCC) data input requirements process
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
A life cycle cost analysis system and method
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Issues on data availability, accessibility, currency and its reliability as inputs in the LCC studies in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2012)
by: Ayob, Mohd Fairullazi, et al.
Published: (2012)
Proposing a methodology to investigate the reliability and validity of data inputs for building (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
Investigating the reliability and validity of data inputs for building life cycle cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
Strategies to enhance quality data input requirements of life cycle cost (LCC)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
by: Ayob, Mohd Fairullazi, et al.
Published: (2013)
A literature review on the state and practice of life cycle cost (LCC) in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
by: Ayob, Mohd Fairullazi, et al.
Published: (2011)
Identification of cost data input in life cycle cost (LCC) for building projects
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
by: Ayob, Mohd Fairullazi, et al.
Published: (2014)
Incomplete contract in private finance initiative (PFI)contracts: causes, implications and strategies
by: Mansor, Nur Syaimasyaza, et al.
Published: (2015)
by: Mansor, Nur Syaimasyaza, et al.
Published: (2015)
Cost and contract administration in construction: divine perspectives
Published: (2016)
Published: (2016)
BIM: the mapping of the QS’s role in contract
administration
by: Abdullah Habib, Siti Nora Haryati
Published: (2018)
by: Abdullah Habib, Siti Nora Haryati
Published: (2018)
Review on the fundamental usage of Bills of Quantities (BQ) by contracting organisations
by: Bandi, Shamsul Hadi, et al.
Published: (2014)
by: Bandi, Shamsul Hadi, et al.
Published: (2014)
Busines development opportunities through pursuit of joint-venture initiatives in construction
by: Preece, Christopher Nigel, et al.
Published: (2010)
by: Preece, Christopher Nigel, et al.
Published: (2010)
Framework for a standard form of joint venture agreement for construction works
by: Abdul Rashid, Khairuddin, et al.
Published: (2010)
by: Abdul Rashid, Khairuddin, et al.
Published: (2010)
The consequence of inadequate design on building maintenance potential
by: Eusuf, Muhammad Abu, et al.
Published: (2010)
by: Eusuf, Muhammad Abu, et al.
Published: (2010)
Review of methodology designed to investigate quality of cost data input in life cycle cost
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Life Cycle Cost (LCC) strategy and protocol on cost data input in Malaysia
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
by: Ayob, Mohd Fairullazi, et al.
Published: (2016)
Recapitulating the issues concerning the application of the bills of quantities
by: Bandi, Shamsul Hadi, et al.
Published: (2014)
by: Bandi, Shamsul Hadi, et al.
Published: (2014)
Research into Bills of Quantities (BQ): where can it be focused?
by: Bandi, Shamsul Hadi, et al.
Published: (2015)
by: Bandi, Shamsul Hadi, et al.
Published: (2015)
Bills of Quantities (BQ) decrypted: uncovering research findings on BQ information requirements and the way forward
by: Bandi, Shamsul Hadi, et al.
Published: (2015)
by: Bandi, Shamsul Hadi, et al.
Published: (2015)
Documenting its applications in quantity surveying research: a review
by: Bandi, Shamsul Hadi, et al.
Published: (2016)
by: Bandi, Shamsul Hadi, et al.
Published: (2016)
Malaysian labour productivity for reinforced concrete structural frame: a case study
by: Ali, Maisarah, et al.
Published: (2012)
by: Ali, Maisarah, et al.
Published: (2012)
Bills of quantities: raison d’etre?
by: Bandi, Shamsul Hadi
Published: (2011)
by: Bandi, Shamsul Hadi
Published: (2011)
Conceptualizing issues relating to the bills of quantities
by: Bandi, Shamsul Hadi, et al.
Published: (2012)
by: Bandi, Shamsul Hadi, et al.
Published: (2012)
Exploring issues on the usage of the Bills of Quantities (BQ) and identifying relevant research area
by: Bandi, Shamsul Hadi, et al.
Published: (2012)
by: Bandi, Shamsul Hadi, et al.
Published: (2012)
Similar Items
-
Incomplete contract in private finance initiative(PFI): a modified Delphi study
by: Mansor, Nur Syaimasyaza, et al.
Published: (2016) -
Application of modified delphi in identifying the presence of Incomplete Contract (IC) in Private Finance Initiative (PFI) Projects
by: Mansor, Syaimasyaza, et al.
Published: (2017) -
Implication of incomplete contract (IC) Malaysian private finance initiative (PFI)
by: Mansor, Nur Syaimasyaza, et al.
Published: (2019) -
Pros and cons of incomplete contract in Private Finance Initiative (PFI) Project
by: Mansor, Syaimasyaza, et al.
Published: (2019) -
Investigation of quality of cost data for life cycle cost analysis in university building maintenance
by: Bidi, Nor Khalisah, et al.
Published: (2015)