Valuation of risk and complexity attributes causing delays in Australian Transport infrastructure projects for optimal contingency Estimation
The transportation projects have historically experienced significant delays and cost overruns from the time decision to build has been taken by the owner. This thesis addresses the problem of why this delay occurs by looking at the drivers from a risk management perspective. It identifies and analy...
| Main Author: | Jayakumari, Praveen Mohandas |
|---|---|
| Format: | Thesis |
| Published: |
Curtin University
2022
|
| Online Access: | http://hdl.handle.net/20.500.11937/93562 |
Similar Items
Estimating the Benefits of Beach Recreation: An Application
of the Contingent Valuation Method
by: R. Abdullah, Nik Mustapha
Published: (1995)
by: R. Abdullah, Nik Mustapha
Published: (1995)
Delay in infrastructure project
by: Siti Nurfarahin, Samsudin
Published: (2019)
by: Siti Nurfarahin, Samsudin
Published: (2019)
Statistical characteristics of cost contingency in water infrastructure projects
by: Baccarini, David, et al.
Published: (2014)
by: Baccarini, David, et al.
Published: (2014)
Estimating the economic benefits of urban trees using contingent valuation method
by: Yeo, Sok Cheng
Published: (2012)
by: Yeo, Sok Cheng
Published: (2012)
Managing knowledge to promote sustainability in Australian transport infrastructure projects
by: Yang, J., et al.
Published: (2015)
by: Yang, J., et al.
Published: (2015)
Contingent Valuation Method: Valuing Cultural Heritage
by: Chiam Chooi Chiam,, et al.
Published: (2011)
by: Chiam Chooi Chiam,, et al.
Published: (2011)
Overruns in Transportation Infrastructure Projects
by: Love, Peter, et al.
Published: (2014)
by: Love, Peter, et al.
Published: (2014)
Causes of delay in Malaysian IT projects
by: Fanurul Kemp, Abd Hakim
Published: (2013)
by: Fanurul Kemp, Abd Hakim
Published: (2013)
The causes of delay in construction project in Kuantan
by: Nur Azuwa, Ghazali
Published: (2017)
by: Nur Azuwa, Ghazali
Published: (2017)
Causes and effects of delay in the construction project
by: Nurshapika Adila, Adnan
Published: (2018)
by: Nurshapika Adila, Adnan
Published: (2018)
Estimating Project Cost Contingency - Beyond the 10% syndrome
by: Baccarini, David
Published: (2005)
by: Baccarini, David
Published: (2005)
The estimation of economic benefits of urban trees using contingent valuation method in Tasik Perdana, Kuala Lumpur
by: Yeo, Sok Cheng, et al.
Published: (2013)
by: Yeo, Sok Cheng, et al.
Published: (2013)
Delay and Disruption in Complex Projects
by: Ackermann, Fran, et al.
Published: (2011)
by: Ackermann, Fran, et al.
Published: (2011)
Option valuation and accounting for contingent consideration in mineral sector acquisitions
by: Chandra, A., et al.
Published: (2012)
by: Chandra, A., et al.
Published: (2012)
Willingness to pay in Taman Negara: a contingent valuation method
by: Samdin, Zaiton
Published: (2008)
by: Samdin, Zaiton
Published: (2008)
An evaluation of the benefits of natural resources using the contingency valuation method
by: Shuib, Ahmad
Published: (1994)
by: Shuib, Ahmad
Published: (1994)
Complexity of Construction Mega Infrastructure Project
by: Wu, Changzhi, et al.
Published: (2018)
by: Wu, Changzhi, et al.
Published: (2018)
The maturing concept of estimating project cost contingency: A review
by: Baccarini, David
Published: (2006)
by: Baccarini, David
Published: (2006)
The causes and effect of delay in construction industry project
by: Intan Diana, Musa
Published: (2012)
by: Intan Diana, Musa
Published: (2012)
A review of causes of delay in construction projects
by: Al-Mohammad, Mohammad, et al.
Published: (2018)
by: Al-Mohammad, Mohammad, et al.
Published: (2018)
Estimating the conservation value of Giant Panda Conservation Centre in Zoo Negara, Malaysia using contingent valuation method
by: Ab Razak, Nurshazwani, et al.
Published: (2017)
by: Ab Razak, Nurshazwani, et al.
Published: (2017)
Estimating willingness to pay for Wetland conservation: a contingent valuation study of Paya Indah Wetland, Selangor Malaysia
by: Mei, Kuang Siew, et al.
Published: (2015)
by: Mei, Kuang Siew, et al.
Published: (2015)
Assessing Muslims’ Willingness To Donate For Cash Waqf Projects: A Contingent Valuation Study In The Southernmost Provinces, Thailand
by: Hassama, Aris
Published: (2024)
by: Hassama, Aris
Published: (2024)
Risk and Uncertainty in the Cost Contingency of Transport Projects: Accommodating Bias or Heuristics, or Both?
by: Love, Peter, et al.
Published: (2021)
by: Love, Peter, et al.
Published: (2021)
Consumer surplus for air quality improvement in the transport sector in Klang Valley, Malaysia: contingent valuation method and choice experimental approach
by: Sarabdeen, Masahina, et al.
Published: (2019)
by: Sarabdeen, Masahina, et al.
Published: (2019)
Economic Valuation of Air Quality Improvement in Klang Valley: Validity and Reliability of Contingent Valuation and Benefit Transfer Methods
by: Afroz, Rafia
Published: (2004)
by: Afroz, Rafia
Published: (2004)
Accuracy in estimating project cost construction contingency - a statistical analysis
by: Baccarini, David
Published: (2004)
by: Baccarini, David
Published: (2004)
Causes of delays in the construction phase of Chinese building projects
by: Wang, T., et al.
Published: (2018)
by: Wang, T., et al.
Published: (2018)
The causes and effect of delay to handover the project in construction industry
by: Nur Fatihah, Zakeri
Published: (2015)
by: Nur Fatihah, Zakeri
Published: (2015)
Underlying causes of construction project delay: A review
by: Romzi, N. A., et al.
Published: (2022)
by: Romzi, N. A., et al.
Published: (2022)
Causes of project delay and cost overrun of mega projects in peninsular Malaysia
by: Nur Aliya Najiha, Tamrin
Published: (2019)
by: Nur Aliya Najiha, Tamrin
Published: (2019)
Consumers' valuation on food safety attributes
by: Nurul Nadia Ramli,, et al.
Published: (2023)
by: Nurul Nadia Ramli,, et al.
Published: (2023)
Use of Dichotomous Choice Contingent Valuation Method to Value the Manukan Island, Sabah
by: Alias, Radam, et al.
Published: (2005)
by: Alias, Radam, et al.
Published: (2005)
Use of dichotomous choice contingent valuation method to value the Manukan Island, Sabah
by: Radam, Alias, et al.
Published: (2005)
by: Radam, Alias, et al.
Published: (2005)
Sustainability of ecotourism resources at Taman Negara National Park: contingent valuation method
by: Samdin, Zaiton, et al.
Published: (2013)
by: Samdin, Zaiton, et al.
Published: (2013)
Estimating construction contingency: Accommodating the potential for cost overruns in road construction projects
by: Love, Peter, et al.
Published: (2015)
by: Love, Peter, et al.
Published: (2015)
Analysing the project delay causes and improving quality using multi-project strategies
by: Nur Amirah Syahirah, Azman, et al.
Published: (2024)
by: Nur Amirah Syahirah, Azman, et al.
Published: (2024)
Assessing the major rework factors in transport infrastructure projects in Malaysia
by: Lim, Ing Rhong
Published: (2022)
by: Lim, Ing Rhong
Published: (2022)
Mitigating Delay Impacts in Construction Projects: An Evaluation of Causes and Strategies
by: Ijaz, Ahmad, et al.
Published: (2024)
by: Ijaz, Ahmad, et al.
Published: (2024)
Study on causes of delay for government construction project in Kuching, Sarawak
by: Nurul Asyilah, Romzi
Published: (2017)
by: Nurul Asyilah, Romzi
Published: (2017)
Similar Items
-
Estimating the Benefits of Beach Recreation: An Application
of the Contingent Valuation Method
by: R. Abdullah, Nik Mustapha
Published: (1995) -
Delay in infrastructure project
by: Siti Nurfarahin, Samsudin
Published: (2019) -
Statistical characteristics of cost contingency in water infrastructure projects
by: Baccarini, David, et al.
Published: (2014) -
Estimating the economic benefits of urban trees using contingent valuation method
by: Yeo, Sok Cheng
Published: (2012) -
Managing knowledge to promote sustainability in Australian transport infrastructure projects
by: Yang, J., et al.
Published: (2015)