Optimization of Underground Development Advance – A Pragmatic Approach to a Multivariate Problem

This study presents a holistic, pragmatic approach to drill and blast optimisation, utilising a hierarchy of considerations for optimised blast design and demonstrates its effectiveness through its successful application in highly laminated geology at an underground gold mine in Western Australia. T...

Full description

Bibliographic Details
Main Author: Witt, Adam David
Format: Thesis
Published: Curtin University 2023
Online Access:http://hdl.handle.net/20.500.11937/92885
_version_ 1848765674595287040
author Witt, Adam David
author_facet Witt, Adam David
author_sort Witt, Adam David
building Curtin Institutional Repository
collection Online Access
description This study presents a holistic, pragmatic approach to drill and blast optimisation, utilising a hierarchy of considerations for optimised blast design and demonstrates its effectiveness through its successful application in highly laminated geology at an underground gold mine in Western Australia. The implementation of the optimised design was able to deliver an average cut length 0.3m greater than the operational average while also reducing the standard deviation by 25%, and simultaneously resulted in a cost reduction in consumables of approximately 15% per metre advance.
first_indexed 2025-11-14T11:39:00Z
format Thesis
id curtin-20.500.11937-92885
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T11:39:00Z
publishDate 2023
publisher Curtin University
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-928852023-08-09T07:22:36Z Optimization of Underground Development Advance – A Pragmatic Approach to a Multivariate Problem Witt, Adam David This study presents a holistic, pragmatic approach to drill and blast optimisation, utilising a hierarchy of considerations for optimised blast design and demonstrates its effectiveness through its successful application in highly laminated geology at an underground gold mine in Western Australia. The implementation of the optimised design was able to deliver an average cut length 0.3m greater than the operational average while also reducing the standard deviation by 25%, and simultaneously resulted in a cost reduction in consumables of approximately 15% per metre advance. 2023 Thesis http://hdl.handle.net/20.500.11937/92885 Curtin University fulltext
spellingShingle Witt, Adam David
Optimization of Underground Development Advance – A Pragmatic Approach to a Multivariate Problem
title Optimization of Underground Development Advance – A Pragmatic Approach to a Multivariate Problem
title_full Optimization of Underground Development Advance – A Pragmatic Approach to a Multivariate Problem
title_fullStr Optimization of Underground Development Advance – A Pragmatic Approach to a Multivariate Problem
title_full_unstemmed Optimization of Underground Development Advance – A Pragmatic Approach to a Multivariate Problem
title_short Optimization of Underground Development Advance – A Pragmatic Approach to a Multivariate Problem
title_sort optimization of underground development advance – a pragmatic approach to a multivariate problem
url http://hdl.handle.net/20.500.11937/92885