Hundreds of Years of Pain, with Minimal Gain: Capital Project Cost Overruns, the Past, Present and Optimistic Future

The cost overrun phenomenon plagues capital projects worldwide. While policymakers and practitioners are aware of the potential for cost overruns to occur while procuring their projects, they have struggled to mitigate them. This article takes stock of cost overrun research and suggests two major pe...

Full description

Bibliographic Details
Main Authors: Love, Peter, Pinto, J.K., Ika, L.A.
Format: Journal Article
Published: 2022
Online Access:http://hdl.handle.net/20.500.11937/90324
_version_ 1848765371037777920
author Love, Peter
Pinto, J.K.
Ika, L.A.
author_facet Love, Peter
Pinto, J.K.
Ika, L.A.
author_sort Love, Peter
building Curtin Institutional Repository
collection Online Access
description The cost overrun phenomenon plagues capital projects worldwide. While policymakers and practitioners are aware of the potential for cost overruns to occur while procuring their projects, they have struggled to mitigate them. This article takes stock of cost overrun research and suggests two major periods stand out. First, it focuses on the period from 1960 to 2002 and briefly reviews studies examining issues influencing cost estimation accuracy. Then, we look at the present period (2002 to 2022), where the Planning Fallacy theory has been championed and identified as the best way to explain why cost overruns occur. While the Planning Fallacy has filled the theoretical void in the literature, we question its legitimacy as it has been unable to effectively address the cost overrun phenomenon. Moving forward, we suggest a line of inquiry based on the theoretical polyphony of the ‘Fifth Hand’ principle, which offers a new framing to remedy cost overruns in capital projects.
first_indexed 2025-11-14T11:34:11Z
format Journal Article
id curtin-20.500.11937-90324
institution Curtin University Malaysia
institution_category Local University
last_indexed 2025-11-14T11:34:11Z
publishDate 2022
recordtype eprints
repository_type Digital Repository
spelling curtin-20.500.11937-903242023-03-01T02:48:05Z Hundreds of Years of Pain, with Minimal Gain: Capital Project Cost Overruns, the Past, Present and Optimistic Future Love, Peter Pinto, J.K. Ika, L.A. The cost overrun phenomenon plagues capital projects worldwide. While policymakers and practitioners are aware of the potential for cost overruns to occur while procuring their projects, they have struggled to mitigate them. This article takes stock of cost overrun research and suggests two major periods stand out. First, it focuses on the period from 1960 to 2002 and briefly reviews studies examining issues influencing cost estimation accuracy. Then, we look at the present period (2002 to 2022), where the Planning Fallacy theory has been championed and identified as the best way to explain why cost overruns occur. While the Planning Fallacy has filled the theoretical void in the literature, we question its legitimacy as it has been unable to effectively address the cost overrun phenomenon. Moving forward, we suggest a line of inquiry based on the theoretical polyphony of the ‘Fifth Hand’ principle, which offers a new framing to remedy cost overruns in capital projects. 2022 Journal Article http://hdl.handle.net/20.500.11937/90324 10.1109/EMR.2022.3219362 fulltext
spellingShingle Love, Peter
Pinto, J.K.
Ika, L.A.
Hundreds of Years of Pain, with Minimal Gain: Capital Project Cost Overruns, the Past, Present and Optimistic Future
title Hundreds of Years of Pain, with Minimal Gain: Capital Project Cost Overruns, the Past, Present and Optimistic Future
title_full Hundreds of Years of Pain, with Minimal Gain: Capital Project Cost Overruns, the Past, Present and Optimistic Future
title_fullStr Hundreds of Years of Pain, with Minimal Gain: Capital Project Cost Overruns, the Past, Present and Optimistic Future
title_full_unstemmed Hundreds of Years of Pain, with Minimal Gain: Capital Project Cost Overruns, the Past, Present and Optimistic Future
title_short Hundreds of Years of Pain, with Minimal Gain: Capital Project Cost Overruns, the Past, Present and Optimistic Future
title_sort hundreds of years of pain, with minimal gain: capital project cost overruns, the past, present and optimistic future
url http://hdl.handle.net/20.500.11937/90324