When ‘less is more’: The rationale for an adaptive toolbox to manage the risk and uncertainty of rework
Determining the risk and uncertainty of rework in construction has received limited attention due to a paucity of information about its frequency and causes. Errors made during construction, which may require rework, can go undetected, manifesting as an engineering failure during an asset's ope...
| Main Authors: | Love, Peter, Matthews, Jane |
|---|---|
| Format: | Journal Article |
| Language: | English |
| Published: |
ELSEVIER
2022
|
| Subjects: | |
| Online Access: | http://purl.org/au-research/grants/arc/DP210101281 http://hdl.handle.net/20.500.11937/90135 |
Similar Items
Curbing rework in offshore projects: systemic classification of risks with dialogue and narratives
by: Love, Peter, et al.
Published: (2013)
by: Love, Peter, et al.
Published: (2013)
Error culture and its impact on rework: An exploration of norms and practices in a transport mega-project
by: Love, Peter, et al.
Published: (2022)
by: Love, Peter, et al.
Published: (2022)
Error aversion or management? Exploring the impact of culture at the sharp-end of production in a mega-project
by: Matthews, Jane, et al.
Published: (2022)
by: Matthews, Jane, et al.
Published: (2022)
The social organization of errors and the manifestation of rework: learning from narratives of practice
by: Love, Peter, et al.
Published: (2022)
by: Love, Peter, et al.
Published: (2022)
Determining the probability distribution of rework costs in construction and engineering projects
by: Love, Peter, et al.
Published: (2013)
by: Love, Peter, et al.
Published: (2013)
The latent causes of rework in floating production storage and offloading projects
by: Love, Peter, et al.
Published: (2014)
by: Love, Peter, et al.
Published: (2014)
Solving single and bi-objective surgery scheduling problems using local search heuristic
by: Ab Rashid, Nur Shafiqah
Published: (2021)
by: Ab Rashid, Nur Shafiqah
Published: (2021)
Automated generation of constructive ordering heuristics for educational timetabling
by: Pillay, Nelishia, et al.
Published: (2017)
by: Pillay, Nelishia, et al.
Published: (2017)
Smart data and business analytics: A theoretical framework for managing rework risks in mega-projects
by: Matthews, Jane, et al.
Published: (2022)
by: Matthews, Jane, et al.
Published: (2022)
A graph-based hyper heuristic for timetabling problems
by: Burke, Edmund, et al.
Published: (2007)
by: Burke, Edmund, et al.
Published: (2007)
A graph-based hyper heuristic for timetabling problems
by: Burke, Edmund, et al.
Published: (2007)
by: Burke, Edmund, et al.
Published: (2007)
Discovering beneficial cooperative structures for the automatic construction of heuristics
by: Terrazas, German, et al.
Published: (2010)
by: Terrazas, German, et al.
Published: (2010)
Towards the design of heuristics by means of self-assembly
by: Terrazas, German, et al.
Published: (2010)
by: Terrazas, German, et al.
Published: (2010)
An iterated multi-stage selection hyper-heuristic
by: Kheiri, Ahmed, et al.
Published: (2016)
by: Kheiri, Ahmed, et al.
Published: (2016)
Ant algorithm hyperheuristic approaches for scheduling problems
by: O'Brien, Ross
Published: (2008)
by: O'Brien, Ross
Published: (2008)
Modelling sound propagation under ice using the Ocean Acoustics Library's Acoustic Toolbox
by: Alexander, P., et al.
Published: (2012)
by: Alexander, P., et al.
Published: (2012)
A greedy heuristic for workforce scheduling and routing with time-dependent activities constraints
by: Castillo-Salazar, J. Arturo, et al.
Published: (2015)
by: Castillo-Salazar, J. Arturo, et al.
Published: (2015)
From Quality-I to Quality-II: cultivating an error culture to support lean thinking and rework mitigation in infrastructure projects
by: Love, Peter, et al.
Published: (2021)
by: Love, Peter, et al.
Published: (2021)
Design Error Costs in Construction Projects
by: Lopez, Robert, et al.
Published: (2012)
by: Lopez, Robert, et al.
Published: (2012)
A component based heuristic search method with evolutionary eliminations for hospital personnel scheduling
by: Li, Jingpeng, et al.
Published: (2008)
by: Li, Jingpeng, et al.
Published: (2008)
Crossover control in selection hyper-heuristics: case studies using MKP and HyFlex
by: Drake, John H.
Published: (2014)
by: Drake, John H.
Published: (2014)
Fast-and-frugal heuristics: an exploration into building an adaptive toolbox to assess the uncertainty of rework
by: Love, Peter, et al.
Published: (2023)
by: Love, Peter, et al.
Published: (2023)
'An Indirect Genetic Algorithm for Set Covering Problems'
by: Aickelin, Uwe
Published: (2002)
by: Aickelin, Uwe
Published: (2002)
An Indirect Genetic Algorithm for Set Covering Problems
by: Aickelin, Uwe
Published: (2002)
by: Aickelin, Uwe
Published: (2002)
Hyper-heuristics for grouping problems
by: Elhag, Anas
Published: (2015)
by: Elhag, Anas
Published: (2015)
A system dynamics model for assessing the impacts of design errors in construction projects
by: Han, Sangwon, et al.
Published: (2013)
by: Han, Sangwon, et al.
Published: (2013)
An adaptive multi meme memetic algorithm embedding choice function hyper-heuristic
by: Qarout, Rehab
Published: (2015)
by: Qarout, Rehab
Published: (2015)
Performance comparison of selection hyper-heuristics on new HyFlex domains
by: Almutairi, Alhanof Khalid S
Published: (2015)
by: Almutairi, Alhanof Khalid S
Published: (2015)
Combining Monte-Carlo and hyper-heuristic methods for the multi-mode resource-constrained multi-project scheduling problem
by: Asta, Shahriar, et al.
Published: (2016)
by: Asta, Shahriar, et al.
Published: (2016)
Metaheuristic and Multiobjective Approaches for Space Allocation
by: Landa Silva, Jesus Dario
Published: (2003)
by: Landa Silva, Jesus Dario
Published: (2003)
Scheduling dynamic cellular manufacturing systems in the presence of cost uncertainty using heuristic method
by: Delgoshaei, Aidin
Published: (2016)
by: Delgoshaei, Aidin
Published: (2016)
Multi-stage hyper-heuristics for optimisation problems
by: Kheiri, Ahmed
Published: (2014)
by: Kheiri, Ahmed
Published: (2014)
Heuristic algorithms for routing problems.
by: Chong, Yen N.
Published: (2001)
by: Chong, Yen N.
Published: (2001)
Hyper-heuristic approaches to automatically designing heuristics as mutation operators for evolutionary programming on function classes
by: Hong, Libin
Published: (2018)
by: Hong, Libin
Published: (2018)
The role of salience in protfolio formation
by: da Silva Rosa, R., et al.
Published: (2008)
by: da Silva Rosa, R., et al.
Published: (2008)
Automated Heuristic Generation By Intelligent Search
by: Burnett, Andrew
Published: (2021)
by: Burnett, Andrew
Published: (2021)
Tolerable Constructive Graph-Based Hyper-Heuristic Algorithm For Examination Timetabling
by: Mohammad Pour, Shahrzad
Published: (2009)
by: Mohammad Pour, Shahrzad
Published: (2009)
Locust- inspired meta-heuristic algorithm for optimising cloud computing performance
by: Fadhil, Mohammed Alaa
Published: (2023)
by: Fadhil, Mohammed Alaa
Published: (2023)
High school timetabling using selection hyperheuristics
by: Nasir Ahmed, Leena Hassan
Published: (2014)
by: Nasir Ahmed, Leena Hassan
Published: (2014)
A genetic programming hyper-heuristic for the multidimensional knapsack problem
by: Drake, John H., et al.
Published: (2014)
by: Drake, John H., et al.
Published: (2014)
Similar Items
-
Curbing rework in offshore projects: systemic classification of risks with dialogue and narratives
by: Love, Peter, et al.
Published: (2013) -
Error culture and its impact on rework: An exploration of norms and practices in a transport mega-project
by: Love, Peter, et al.
Published: (2022) -
Error aversion or management? Exploring the impact of culture at the sharp-end of production in a mega-project
by: Matthews, Jane, et al.
Published: (2022) -
The social organization of errors and the manifestation of rework: learning from narratives of practice
by: Love, Peter, et al.
Published: (2022) -
Determining the probability distribution of rework costs in construction and engineering projects
by: Love, Peter, et al.
Published: (2013)