Risk and Uncertainty in the Cost Contingency of Transport Projects: Accommodating Bias or Heuristics, or Both?
Transport projects are regularly subjected to cost misperformance. The contingency set aside to cover any increases in cost due to risk and uncertainty issues is often insufficient. We review approaches that have been used to estimate a cost contingency. We show that some approaches such as referenc...
| Main Authors: | Love, Peter, Ika, L.A., Matthews, Jane, Fang, Weili |
|---|---|
| Format: | Journal Article |
| Published: |
2021
|
| Online Access: | http://purl.org/au-research/grants/arc/DP160102882 http://hdl.handle.net/20.500.11937/90130 |
Similar Items
Estimating construction contingency: Accommodating the potential for cost overruns in road construction projects
by: Love, Peter, et al.
Published: (2015)
by: Love, Peter, et al.
Published: (2015)
Fast-and-frugal heuristics: an exploration into building an adaptive toolbox to assess the uncertainty of rework
by: Love, Peter, et al.
Published: (2023)
by: Love, Peter, et al.
Published: (2023)
Large-Scale Transport Infrastructure Project Performance: Generating a Narrative of Context and Meaning
by: Love, Peter, et al.
Published: (2021)
by: Love, Peter, et al.
Published: (2021)
Error culture and its impact on rework: An exploration of norms and practices in a transport mega-project
by: Love, Peter, et al.
Published: (2022)
by: Love, Peter, et al.
Published: (2022)
The ‘context’ of transport project cost performance: Insights from contract award to final construction costs
by: Love, Peter, et al.
Published: (2021)
by: Love, Peter, et al.
Published: (2021)
Statistical characteristics of cost contingency in water infrastructure projects
by: Baccarini, David, et al.
Published: (2014)
by: Baccarini, David, et al.
Published: (2014)
Error aversion or management? Exploring the impact of culture at the sharp-end of production in a mega-project
by: Matthews, Jane, et al.
Published: (2022)
by: Matthews, Jane, et al.
Published: (2022)
A procurement policy-making pathway to future-proof large-scale transport infrastructure assets
by: Love, Peter, et al.
Published: (2021)
by: Love, Peter, et al.
Published: (2021)
Homo Heuristicus: From Risk Management to Managing Uncertainty in Large-Scale Infrastructure Projects
by: Love, Peter, et al.
Published: (2022)
by: Love, Peter, et al.
Published: (2022)
Understanding project cost contingency: A survey
by: Baccarini, David
Published: (2005)
by: Baccarini, David
Published: (2005)
There Is Strength in Numbers: Seven Principles to Contain and Reduce Error and Mitigate Rework in Transport Mega-Projects
by: Love, Peter, et al.
Published: (2022)
by: Love, Peter, et al.
Published: (2022)
Estimating Project Cost Contingency - Beyond the 10% syndrome
by: Baccarini, David
Published: (2005)
by: Baccarini, David
Published: (2005)
The maturing concept of estimating project cost contingency: A review
by: Baccarini, David
Published: (2006)
by: Baccarini, David
Published: (2006)
From Quality-I to Quality-II: cultivating an error culture to support lean thinking and rework mitigation in infrastructure projects
by: Love, Peter, et al.
Published: (2021)
by: Love, Peter, et al.
Published: (2021)
Issues in the accommodation of model uncertainty in macro-econometric modelling
by: Aristidou, Chrystalleni
Published: (2016)
by: Aristidou, Chrystalleni
Published: (2016)
When ‘less is more’: The rationale for an adaptive toolbox to manage the risk and uncertainty of rework
by: Love, Peter, et al.
Published: (2022)
by: Love, Peter, et al.
Published: (2022)
Fast-and-frugal heuristics for decision-making in uncertain and complex settings in construction
by: Love, Peter, et al.
Published: (2023)
by: Love, Peter, et al.
Published: (2023)
Moving Beyond Optimism Bias and Strategic Misrepresentation: An Explanation for Social Infrastructure Project Cost Overruns
by: Love, Peter, et al.
Published: (2012)
by: Love, Peter, et al.
Published: (2012)
Error Mastery in Alliance Transport Megaprojects
by: Love, Peter, et al.
Published: (2022)
by: Love, Peter, et al.
Published: (2022)
Estimiating Project Cost Contingency - Beyong Guesswork and Towards Regression Analysis
by: Baccarini, David
Published: (2008)
by: Baccarini, David
Published: (2008)
Accuracy in estimating project cost construction contingency - a statistical analysis
by: Baccarini, David
Published: (2004)
by: Baccarini, David
Published: (2004)
Scheduling dynamic cellular manufacturing systems in the presence of cost uncertainty using heuristic method
by: Delgoshaei, Aidin
Published: (2016)
by: Delgoshaei, Aidin
Published: (2016)
Hundreds of Years of Pain, with Minimal Gain: Capital Project Cost Overruns, the Past, Present and Optimistic Future
by: Love, Peter, et al.
Published: (2022)
by: Love, Peter, et al.
Published: (2022)
The Influence Of Uncertainty Variables On
Project Cost Estimation
by: Rauzana, Anita
Published: (2015)
by: Rauzana, Anita
Published: (2015)
Building absorptive capacity in a mega-project program alliance: Learning to mitigate rework
by: Love, Peter, et al.
Published: (2024)
by: Love, Peter, et al.
Published: (2024)
'Plugging the gaps' between optimum bias and strategic misrepresentation and infrastructure cost overruns
by: Love, Peter
Published: (2011)
by: Love, Peter
Published: (2011)
Valuation of risk and complexity attributes causing delays in
Australian Transport infrastructure projects for optimal contingency
Estimation
by: Jayakumari, Praveen Mohandas
Published: (2022)
by: Jayakumari, Praveen Mohandas
Published: (2022)
Development of project cost contingency estimation model using risk analysis and fuzzy expert system
by: Idrus, Arazi, et al.
Published: (2010)
by: Idrus, Arazi, et al.
Published: (2010)
Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation
by: Love, Peter, et al.
Published: (2016)
by: Love, Peter, et al.
Published: (2016)
Making Sense of Hospital Project MisPerformance: Over Budget, Late, Time and Time Again—Why? And What Can Be Done About It?
by: Love, Peter, et al.
Published: (2022)
by: Love, Peter, et al.
Published: (2022)
Explainable Artificial Intelligence in Construction: The Content,
Context, Process, Outcome Evaluation Framework
by: Love, Peter, et al.
by: Love, Peter, et al.
Explainable Artificial Intelligence: Precepts, Methods, and Opportunities for Research in Construction
by: Love, Peter, et al.
by: Love, Peter, et al.
Smart data and business analytics: A theoretical framework for managing rework risks in mega-projects
by: Matthews, Jane, et al.
Published: (2022)
by: Matthews, Jane, et al.
Published: (2022)
Debunking fake news in a post-truth era: The plausible untruths of cost underestimation in transport infrastructure projects
by: Love, Peter, et al.
Published: (2018)
by: Love, Peter, et al.
Published: (2018)
Hybrid heuristic for multi-carrier transportation plans
by: Landa-Silva, Dario, et al.
Published: (2011)
by: Landa-Silva, Dario, et al.
Published: (2011)
Rework in relational engineer-to-order production systems: An ‘error-as-process’ archetype
by: Love, Peter, et al.
Published: (2024)
by: Love, Peter, et al.
Published: (2024)
Overruns in Transportation Infrastructure Projects
by: Love, Peter, et al.
Published: (2014)
by: Love, Peter, et al.
Published: (2014)
Design Error Costs in Construction Projects
by: Lopez, Robert, et al.
Published: (2012)
by: Lopez, Robert, et al.
Published: (2012)
Uncertainty quantification for flow and transport in porous media
by: Crevillen Garcia, David
Published: (2016)
by: Crevillen Garcia, David
Published: (2016)
The Bias and Uncertainty of Redundant and Sky-based Calibration Under Realistic Sky and Telescope Conditions
by: Joseph, R., et al.
Published: (2018)
by: Joseph, R., et al.
Published: (2018)
Similar Items
-
Estimating construction contingency: Accommodating the potential for cost overruns in road construction projects
by: Love, Peter, et al.
Published: (2015) -
Fast-and-frugal heuristics: an exploration into building an adaptive toolbox to assess the uncertainty of rework
by: Love, Peter, et al.
Published: (2023) -
Large-Scale Transport Infrastructure Project Performance: Generating a Narrative of Context and Meaning
by: Love, Peter, et al.
Published: (2021) -
Error culture and its impact on rework: An exploration of norms and practices in a transport mega-project
by: Love, Peter, et al.
Published: (2022) -
The ‘context’ of transport project cost performance: Insights from contract award to final construction costs
by: Love, Peter, et al.
Published: (2021)