Production Scheduling of an Open-pit Mining Complex with Waste Dump Constraints
The research work aims to solve the production scheduling problem for open pit mining complexes. It establishes a Mixed-Integer Programming (MIP) model that maximises the net present value of future cash flows and satisfies reserve, production capacity, mining block precedence, waste disposal, stock...
| Main Author: | |
|---|---|
| Format: | Thesis |
| Published: |
Curtin University
2021
|
| Online Access: | http://hdl.handle.net/20.500.11937/88095 |
| _version_ | 1848764958935875584 |
|---|---|
| author | Lin, Wei |
| author_facet | Lin, Wei |
| author_sort | Lin, Wei |
| building | Curtin Institutional Repository |
| collection | Online Access |
| description | The research work aims to solve the production scheduling problem for open pit mining complexes. It establishes a Mixed-Integer Programming (MIP) model that maximises the net present value of future cash flows and satisfies reserve, production capacity, mining block precedence, waste disposal, stockpiling, and pit sequence constraints. The model is validated and implemented with real-world case. |
| first_indexed | 2025-11-14T11:27:38Z |
| format | Thesis |
| id | curtin-20.500.11937-88095 |
| institution | Curtin University Malaysia |
| institution_category | Local University |
| last_indexed | 2025-11-14T11:27:38Z |
| publishDate | 2021 |
| publisher | Curtin University |
| recordtype | eprints |
| repository_type | Digital Repository |
| spelling | curtin-20.500.11937-880952022-03-14T06:54:08Z Production Scheduling of an Open-pit Mining Complex with Waste Dump Constraints Lin, Wei The research work aims to solve the production scheduling problem for open pit mining complexes. It establishes a Mixed-Integer Programming (MIP) model that maximises the net present value of future cash flows and satisfies reserve, production capacity, mining block precedence, waste disposal, stockpiling, and pit sequence constraints. The model is validated and implemented with real-world case. 2021 Thesis http://hdl.handle.net/20.500.11937/88095 Curtin University fulltext |
| spellingShingle | Lin, Wei Production Scheduling of an Open-pit Mining Complex with Waste Dump Constraints |
| title | Production Scheduling of an Open-pit Mining Complex with Waste
Dump Constraints |
| title_full | Production Scheduling of an Open-pit Mining Complex with Waste
Dump Constraints |
| title_fullStr | Production Scheduling of an Open-pit Mining Complex with Waste
Dump Constraints |
| title_full_unstemmed | Production Scheduling of an Open-pit Mining Complex with Waste
Dump Constraints |
| title_short | Production Scheduling of an Open-pit Mining Complex with Waste
Dump Constraints |
| title_sort | production scheduling of an open-pit mining complex with waste
dump constraints |
| url | http://hdl.handle.net/20.500.11937/88095 |