Developing BIM-enabled Work Packaging with Field Sensing for Information Flow Improvement in Complex Projects
This research aims to develop an innovative data environment to improve the information flow in complex projects. The data environment leverages the smart sensing technology and BIM to collect site information, and then harnesses information from site and stakeholders through a BIM-enabled work pack...
| Main Author: | Tsai, Yuan-Hao |
|---|---|
| Format: | Thesis |
| Published: |
Curtin University
2021
|
| Online Access: | http://hdl.handle.net/20.500.11937/85008 |
Similar Items
Preliminary contractual framework for BIM-enabled projects
by: Chong, Heap Yih, et al.
Published: (2017)
by: Chong, Heap Yih, et al.
Published: (2017)
BIM-Enabled Design Collaboration for Complex Building
by: Wang, Jun, et al.
Published: (2014)
by: Wang, Jun, et al.
Published: (2014)
The roles of project stakeholders in EPCM BIM-enabled projects
by: Lee, C., et al.
Published: (2017)
by: Lee, C., et al.
Published: (2017)
The Application of BIM-Enabled Facility Management System in Complex Building
by: Wang, Jun, et al.
Published: (2013)
by: Wang, Jun, et al.
Published: (2013)
Novel Employer-Oriented Frameworks to Manage Delay
Causes in Traditional (Non-BIM) and Building
Information Modelling (BIM)-Enabled Construction
Projects
by: Barqawi, Mohammad Tawfiq
Published: (2024)
by: Barqawi, Mohammad Tawfiq
Published: (2024)
Joint Contract-Function Effects on BIM-Enabled EPC Project Performance
by: Lee, C.Y., et al.
Published: (2020)
by: Lee, C.Y., et al.
Published: (2020)
Construction Educational Interdisciplinary Project-Work as an Antecedent for Improved Intergration in BIM
by: Whyte, Andrew
Published: (2012)
by: Whyte, Andrew
Published: (2012)
Integration of BIM work culture for improving global project collaboration productivity
by: Abdul Ghafar, Maszura, et al.
Published: (2018)
by: Abdul Ghafar, Maszura, et al.
Published: (2018)
Web-based bim project execution plan management system (WeB-MaS) for public works department Malaysia
by: Tsai, Kai Len
Published: (2022)
by: Tsai, Kai Len
Published: (2022)
Field-Level Information Communication to Synergize BIM
by: Rahnamayiezekavat, Payam
Published: (2011)
by: Rahnamayiezekavat, Payam
Published: (2011)
Embedding work culture in Building Information Modelling (BIM) for enhancing collaboration in global projects
by: Abdul Ghafar, Maszura, et al.
Published: (2013)
by: Abdul Ghafar, Maszura, et al.
Published: (2013)
BIM-enabled collaborative scaffolding scoping and design
by: Wang, J., et al.
Published: (2016)
by: Wang, J., et al.
Published: (2016)
Perspectives on modelling bim-enabled estimating practices
by: Olatunji, Oluwole, et al.
Published: (2014)
by: Olatunji, Oluwole, et al.
Published: (2014)
Challanges of building information modelling (BIM) in project implementation
by: Loh, Mei Yee
Published: (2014)
by: Loh, Mei Yee
Published: (2014)
Scheduling Large Project Into Work Packages
by: Mohamad Nor, Norazman
Published: (1994)
by: Mohamad Nor, Norazman
Published: (1994)
BIM/GIS data integration from the perspective of information flow
by: Zhu, Junxiang, et al.
Published: (2022)
by: Zhu, Junxiang, et al.
Published: (2022)
A BIM-enabled MEP coordination process for use in China
by: Yung, Ping, et al.
Published: (2014)
by: Yung, Ping, et al.
Published: (2014)
An overview of contract documents for building information modelling (BIM) construction projects
by: Ahmad Huzaimi, Abd Jamil, et al.
Published: (2017)
by: Ahmad Huzaimi, Abd Jamil, et al.
Published: (2017)
Integration of building information modelling (BIM) with materials management in construction project
by: Fayed Mogalli, Ali Hussein
Published: (2017)
by: Fayed Mogalli, Ali Hussein
Published: (2017)
Adoption of Building Information Modelling (BIM) on Railway Transportation Project in Malaysia
by: Ng, Wei Yean
Published: (2018)
by: Ng, Wei Yean
Published: (2018)
Benefits of BIM in construction projects
by: Vimonsatit, Vanissorn, et al.
Published: (2015)
by: Vimonsatit, Vanissorn, et al.
Published: (2015)
Building Information Modelling (BIM)-Supported Cooperative Design in Sustainable Renovation Projects
by: Di Mascio, D., et al.
Published: (2013)
by: Di Mascio, D., et al.
Published: (2013)
Developing building information modelling (BIM) implementation model for project design team
by: Mohd, Suzila, et al.
Published: (2017)
by: Mohd, Suzila, et al.
Published: (2017)
Integrative Trust-Based Functional Contracting: A Complementary Contractual Approach to BIM-Enabled Oil And Gas EPC Project Delivery
by: Lee, Cen Ying
Published: (2019)
by: Lee, Cen Ying
Published: (2019)
Improving Integrated Practice through Building Information Modeling-Integrated Project Delivery (BIM-IPD) for Malaysian Industrialised Building System (IBS) Construction Projects
by: Mohd Nasrun, Mohd Nawi, et al.
Published: (2014)
by: Mohd Nasrun, Mohd Nawi, et al.
Published: (2014)
Barriers of Applying Building Information Modelling (BIM) According to BIM ISO
by: Kong, Sio Kah, et al.
Published: (2022)
by: Kong, Sio Kah, et al.
Published: (2022)
Benefits from Adoption of Building Information Modelling (BIM) in Building Construction Projects in Sarawak
by: Albert Nelson Robert,
Published: (2021)
by: Albert Nelson Robert,
Published: (2021)
Building Information Modelling (BIM): design process and interoperability in projects / Aimi Ashikin Hanib
by: Hanib, Aimi Ashikin
Published: (2015)
by: Hanib, Aimi Ashikin
Published: (2015)
Streamlining Digital Modeling and Building Information Modelling (BIM) Uses for the Oil and Gas Projects
by: Lee, Cen-Ying, et al.
Published: (2018)
by: Lee, Cen-Ying, et al.
Published: (2018)
Application of building information modelling (BIM) in design and build (D&B) projects in Malaysia
by: Brahim, Juliana, et al.
Published: (2018)
by: Brahim, Juliana, et al.
Published: (2018)
Bim: the setback or solution to project cost issues in Malaysia construction industry?
by: Ang, P S E, et al.
Published: (2020)
by: Ang, P S E, et al.
Published: (2020)
BIM Standards Around The World – A Review of BIM Standards in the Global AEC Industry and BIM Roles of Project Stakeholders
by: Abuebeid, Marwan, et al.
Published: (2018)
by: Abuebeid, Marwan, et al.
Published: (2018)
Strategies to improve cost and time control using building information model (BIM)
by: Muhammad, Muhammad Tahir, et al.
Published: (2016)
by: Muhammad, Muhammad Tahir, et al.
Published: (2016)
Development of Collaborative Contractual Framework for Building Information Modelling Enabled Construction Projects
by: Alwash, Adam
Published: (2020)
by: Alwash, Adam
Published: (2020)
Building Information Modelling (BIM) & integrated project delivery (IPD): Workplace utilisation in W. Australia
by: Whyte, Andrew, et al.
Published: (2013)
by: Whyte, Andrew, et al.
Published: (2013)
Contractual issues for building information modelling (BIM)-based construction projects: An exploratory case study
by: Ahmad Huzaimi, Abd Jamil, et al.
Published: (2019)
by: Ahmad Huzaimi, Abd Jamil, et al.
Published: (2019)
Critical success factors for building information modelling BIM implementation for power plant projects in Malaysia
by: Aziz, Mohd Azrul, et al.
Published: (2022)
by: Aziz, Mohd Azrul, et al.
Published: (2022)
A Project-based Quantification of BIM Benefits
by: Li, J., et al.
Published: (2014)
by: Li, J., et al.
Published: (2014)
Improving Document Management and Information Flow in a Railway Signalling Projects Operation
by: Erubami, Paul O.
Published: (2010)
by: Erubami, Paul O.
Published: (2010)
The development of a BIM-enabled inspection management system for maintenance diagnoses of oil and gas plants
by: Chi, Hung-Lin, et al.
Published: (2016)
by: Chi, Hung-Lin, et al.
Published: (2016)
Similar Items
-
Preliminary contractual framework for BIM-enabled projects
by: Chong, Heap Yih, et al.
Published: (2017) -
BIM-Enabled Design Collaboration for Complex Building
by: Wang, Jun, et al.
Published: (2014) -
The roles of project stakeholders in EPCM BIM-enabled projects
by: Lee, C., et al.
Published: (2017) -
The Application of BIM-Enabled Facility Management System in Complex Building
by: Wang, Jun, et al.
Published: (2013) -
Novel Employer-Oriented Frameworks to Manage Delay
Causes in Traditional (Non-BIM) and Building
Information Modelling (BIM)-Enabled Construction
Projects
by: Barqawi, Mohammad Tawfiq
Published: (2024)